Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Pennsylvania was posted on January 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Management and General Contracting

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236115
New
SLED
Delaney Square Residential ProjectThe Delaney Square Residential Project, managed by the City of Azusa, involves the development of 128 residential units on a 9.77-acre site at 1035 East Mauna Loa Avenue, California. The project requires the demolition of the former Powell Elementary School and its parking lot to make way for a mix of two-story single-family detached cluster homes and two-story attached triplexes and duplexes. Planned amenities include private and common open spaces, a tot lot, a barbecue area, a shaded gathering space, and a butterfly garden. To facilitate this residential use, the project requires a General Plan Amendment to change the land use designation from Institutional to Medium Density Residential and a Zone Change from Institutional/School to Neighborhood General 3 - Medium. The development emphasizes sustainability and infrastructure modernization, featuring drought-tolerant landscaping, eco-conscious irrigation, electric vehicle charging stations, and the conversion of electrical utility lines to underground along East Mauna Loa and North Calera Avenues. Comprehensive environmental reviews have been conducted under CEQA guidelines, including a Draft Environmental Impact Report, a Transportation Impact Study, and a Phase I Environmental Site Assessment. These assessments cover air quality, noise modeling, hydrology, and the evaluation of archaeological and paleontological resources. The project also adheres to strict regulatory standards, including ADA compliance for pedestrian infrastructure, the Migratory Bird Treaty Act for wildlife protection, and confidential tribal consultation processes in accordance with Assembly Bill 52 and Senate Bill 18.
City of Azusa

POSTED

about 23 hours ago

DEADLINE

N/A
NAICS: 236115
New
SLED
Freedom Lane Residential Development ProjectThe Freedom Lane Residential Development Project is a proposed residential development in Aliso Viejo, California, consisting of 71 units on approximately 7.06 acres. The project features 31 duplex buildings totaling 62 attached units and nine detached units, with three- and four-bedroom floor plans, enclosed garages, and 37 guest parking spaces. Site amenities include a tot lot, community open lawn space, a barbecue area, and extensive landscaping along buildings and public streets. Construction is projected to begin on July 1, 2027, with the project becoming operational in 2029. The project is currently undergoing environmental review under the California Environmental Quality Act, with a Draft Initial Study and Mitigated Negative Declaration dated August 28, 2026. Comprehensive assessments have been conducted regarding air quality, greenhouse gas emissions, biological resources, cultural and tribal resources, geology, noise, and transportation. Key supporting documentation includes a Phase I Environmental Site Assessment, a geotechnical report confirming site feasibility, and a Fuel Modification Plan to meet fire safety standards. The City of Aliso Viejo is the lead agency, with Meritage Homes, Inc. as the applicant, and the project has undergone public review and coordination with the Orange County Fire Authority and other public service providers.
City of Aliso Viejo

POSTED

about 23 hours ago

DEADLINE

N/A
NAICS: 236115
New
SLED
Solicitation 2027-001-009- 11 3 & 4 Bedroom Homes within the Cherokee Nation Reservation
Solicitation # 2027-001-009
The Housing Authority of the Cherokee Nation is soliciting bids for the turn-key construction of eleven 3- and 4-bedroom homes located across Adair, Cherokee, Delaware, Mayes, Muskogee, Sequoyah, and Wagoner Counties within the Cherokee Nation Reservation. The project requires the contractor to provide all necessary labor, materials, equipment, permits, insurance, and supervision. Key deliverables include the construction of homes from footing to finish, including parking pads or approaches, and site preparation involving the creation of 50 by 70 foot pads. The project must be completed within 120 working days, with a penalty of 1,000 dollars per working day for delays beyond the contract end date. A one-year warranty period applies following the completion of the homes. The contract will be awarded to the lowest cost responsive and responsible bidder, with a preference for Indian-owned economic enterprises. Bidders must comply with Davis-Bacon wage rates and specific Executive Orders regarding paid sick leave and minimum wage. Required submission documents include a mandatory bid response form, TERO certification, non-collusive affidavit, and various insurance certificates, including builders risk insurance. Final payment is contingent upon the submission of closing documents such as final Davis-Bacon payrolls, lien releases, and as-built drawings. There is no specified set-aside status for this solicitation.
Cherokee Nation Housing Authority

POSTED

3 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

Bucks County in Pennsylvania is seeking a subcontractor for a Construction Management and General Contracting project focused on the full construction of workforce housing units. The selected contractor will be responsible for critical project oversight, including the management of schedules, coordination of subcontractors, and the implementation of quality control measures to ensure construction standards are met. The solicitation was posted on January 5, 2026, and interested parties must submit their responses by the deadline of March 10, 2026. This project falls under NAICS code 236115 and will be performed within Bucks County.

General Info

Bucks County seeks a construction manager for workforce housing units by March 10, 2026.

Documents

This scope was carved out of 215094.

The full solicitation package (19 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP for Development Partner for Workforce Homeownership Housing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Framing and Structural WorkOpen now, due in 28 days
  • Delaney Square Residential ProjectOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Bucks County
ContactsNo contacts available
OfficeN/A
Organization / AgencyPennsylvania → Bucks County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Oversee full construction of workforce housing units including scheduling, subcontractor coordination, and quality control.

More opportunities from Pennsylvania → Bucks County

Same awarding agency

NAICS: 237110
SLED
Patriots Ridge to Summer Hill Water Main Extension
Solicitation # 26-01W
The Patriots Ridge to Summer Hill Water Main Extension (Contract No. 26-01W) is a construction project in Plumstead Township, Bucks County, Pennsylvania. The scope of work involves providing all labor, equipment, and materials to construct a water main extension of approximately 5,400 linear feet of 12-inch CL52 DIP water main, including 336 linear feet of High-Density Polyethylene (HDPE) pipe installed via horizontal directional drilling, four combination air release chambers, and restoration of the State Road subgrade, base, and binder course. The project is scheduled for substantial completion within 150 calendar days, with final payment readiness within 180 calendar days. This project is federally funded by the EPA and is subject to strict regulatory requirements, including Davis-Bacon Act wages and Build America, Buy America and American Iron and Steel standards. Contractors must demonstrate compliance with federal Executive Orders and EPA Regulations regarding the solicitation of Disadvantaged Business Enterprises (DBEs). Bids are submitted on a unit price basis via the PennBid platform, with the contract awarded to the lowest responsible and responsive bidder. Required documentation includes a bid bond or certified check of at least 10 percent of the bid amount, as well as performance, payment, and maintenance bonds totaling 100 percent of the contract value. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS