Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on January 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager at Risk for the Poinciana High School Air Handling Units & HVAC Retrofit Project

Closed
SDOC-24-Q-085-CH-FPCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves selecting a construction management firm through a negotiated fee approach with a guaranteed maximum price for a project at Poinciana High School in Kissimmee, Florida. The project’s primary scope is the replacement of 40 air handler units across multiple buildings, ensuring the new systems meet design specifications provided by an engineering firm, with a focus on maintaining indoor air quality and system efficiency. The selected firm will work closely with the engineering team to deliver a fully operational system that adheres to high-performance criteria, including sustainable design, durability, and enhanced indoor environmental quality. The project budget is approximately $7.9 million, with scheduled design and construction milestones set from early 2024 through mid-2025, aiming for substantial completion by late July 2025. The construction management firm will be responsible for comprehensive project oversight, including preconstruction planning, procurement, scheduling, quality assurance, safety management, and post-construction closeout. They are expected to manage subcontractors, coordinate with third-party consultants, and utilize the Owner’s project management system, e-Builder, for all communications and documentation. Additionally, the firm must strive to meet the Owner’s direct purchase goals, facilitate timely meetings, and ensure all project activities align with high-performance standards such as energy efficiency, air leakage limits, and environmental stewardship. The contract emphasizes collaboration with the Owner’s representatives, adherence to schedules, budget management, and thorough documentation throughout all phases of the project.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Osceola County
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Osceola County
Office AddressN/A
Contacts

Full Description

Show more
PURPOSEThis document shall serve to provide interested parties with specific information as to the Procedures for Selection of a Construction Management Firm where the method of compensation is a Negotiated Fee on a Guaranteed Maximum Price. Pursuant to Chapter 1013, Florida Statutes, the Florida Consultant’s Competitive Negotiation Act, Section 287.055 Florida Statutes, and Rule 6A-2.0010, Florida Administrative Code, the School District of Osceola County, Florida will consider the contracting of one (1) firm to provide construction management services for the project described below. In determining whether a firm is qualified, the School District of Osceola County, Florida shall consider such factors as supporting office location(s), experience and past performance, proposed project staff and functions, project approach, workload, scheduling methodology, and references.PROJECT LOCATIONPoinciana High School2300 S. Poinciana BoulevardKissimmee, FL 34758PROJECT DESCRIPTIONThe Scope of Work for the project includes construction for the replacement of select air handler units (AHUs) on the campus. There are 40 AHUs that will need to be replaced in buildings 1, 2, and 3. The contracted CM firm shall replace the existing system(s) adhering to the design provided by the selected Engineering firm. The new system(s) will work effectively to properly condition all spaces and maintain proper indoor air quality. The Construction Management firm will be required to work with the selected Engineering firm to ensure all information required for deliverance of the project is provided, for the system replacement. All relief fans and components in the building automation systems will require replacement to accommodate the new system. AlternateReplacement of all LonWorks controllers in campus (Bldgs. 2, 3, 4, and 9) to BACnet/IP and integrate with current system.PROJECT REQUIREMENTS / HIGH PERFORMANCE CRITERIA1. Integrate learning, design, sustainable design, and environmental stewardship so that it supports and enhances student learning and student success through air quality enhancing the learning environment. 2. Deliver a completely installed system3. Meet these measurable High-Performance Criteria:a) Comprehensive Building Automation Systemb) Provide building systems that are durable, forthright to operate/control, and are easily maintained.c) Consider Indoor Air Quality, Thermal/Acoustic/Visual Comfort, and Universal Design standards beyond the minimum required by building code.ATTACHMENTS 1. Draft Construction Management AgreementCONSTRUCTION BUDGET: $7,916,321.00PROJECTED DESIGN SCHEDULE Design Notice to Proceed: February 27, 2024Design Development Documents Complete: April 16, 2024Construction Documents Complete: May 14, 2024PROJECTED CONSTRUCTION SCHEDULE Tentative Construction Notice to Proceed: March 27,2024Tentative Construction Start: June 3, 2025Substantial Completion: July 25, 2025Final Completion: August 1, 2025ORIENTATION SITE VISITThe Orientation Site Visit will be scheduled with the firms that are Short Listed. The date of the site visit will be scheduled at the time the Short List is prepared for presentation to the School Board. SCOPE OF SERVICESThe construction management firm will be responsible for the successful, timely, and economical completion of the Project. The construction management firm’s services may include, but are not limited to the following:1. Enter an “At Risk” contract with all sub-contractors, materials suppliers and equipment suppliers necessary for the construction of the project.2. Employ competent Project Managers, Project Superintendents, and necessary assistants to be the Construction Manager’s representatives, and who shall be in attendance at the project site full time during the progress of the Work.3. New buildings will be constructed to meet the High-Performance Building Criteria to achieve an Energy Use Intensity (EUI) requirement of 25 or less and a building envelop Air Leakage (infiltration and exfiltration) maximum of 0.20 CFM/SF. 4. Provide preconstruction services as directed by the Owner’s Project Representative during the design phases of the work, and provide cost estimating, schedule development, timely document review, existing infrastructure evaluation expertise, permit request and administration, and other related administrative items necessary to ensure the timely delivery of the project.5. Work with the project team and use the Owner’s Project Management Solution, e-Builder to manage the construction processes for the project. All project communication is to be managed in e-Builder. At no cost to the district, the project team will be required to attend group or individual training sessions scheduled by the Owner’s Project Representative. 6. The Owner has set an Owner Direct Purchase Goal of 20% for Renovation Projects and 30% for New Construction. The Construction Manager is to make every effort to meet or exceed the Owner’s expectation for this goal. The Construction Manager must also work with its subcontractors, sub-subcontractors, and material suppliers to ensure there is a streamlined process in place to maximize discounts offered for prompt payment of items purchased through the Owner Direct Purchase Program.7. The Construction Manager, if requested by the Owner’s Project Representative, shall provide a preliminary evaluation of the Owner’s Project program and budget.8. Provide continuous on-site construction management services through the completion of the project to include, but not be limited to:a. Schedule and conduct preconstruction meetings and regular job site meetings.b. Maintain daily on-site project logs and schedule reports.c. Oversee quality assurance testing and inspection programs.d. Monitor construction management staff and subcontractor work performance for deficiencies.e. Maintain record copy of all contract documents, RFIs, ASIs, change orders and other project-related documentation.f. Oversee construction management staff and subcontractor safety programs.9. Develop, update, and maintain master project schedules, detailed construction schedules, submittal schedules, inspection schedules and occupancy schedules.10. Provide construction program accounting and reporting to the Owner’s Project Representative.11. Report potential budget and schedule variances and prepare recovery plans.12. Work with and coordinate activities with any third-party contracts or contractors that the Owner provides for the project.13. Coordinate surveyors, special consultants, and testing lab services contracted by the Owner, as required.14. Develop and administer a Warranty Implementation Plan.15. Administer post construction closeout, start-up and transition to operation.16. Schedule, coordinate and participate in a walk-through inspection of the Work one month prior to the expiration of the one-year correction period, and notify the Owner’s Project Representative, the appropriate Architect, and any necessary subcontractors and suppliers of the date of, and request their participation in, the walk-through inspection.17. Work with the architect of record and the Owner’s Project Representative when submitting the various documents required for review, which includes but is not limited to Change Orders, Contingency Transfers, Buyout Transfers, Applications for Payment, and Certificates of Substantial Completion and Certificates of Final Inspection.18. All meetings shall be documented in e-Builder using the appropriate Meeting Minutes Forms. The sign-in sheet, meeting minutes and any other documents distributed during the meetings must be attached to the appropriate Meeting Minutes Form, and then uploaded to e-Builder after each meeting. The Construction Manager is responsible for facilitating the OAC meetings, distributing an agenda for each meeting and managing a sign-in sheet. The Construction Manager is also responsible for making sure the meeting minutes are documented and uploaded to e-Builder using the appropriate Meeting Minutes Form.19. Administer post construction closeout, start-up and transition to operation.20. The Construction Manager shall cooperate at all times with the Owner’s Project Representative and shall cooperate and coordinate with any audit agency or audit firm contracted by the Owner.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS