Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project

Closed
20260827007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Rose Bowl Operating Company and the City of Pasadena are seeking a Construction Manager at-Risk (CMAR) for the Plumbing Infrastructure Enhanced Maintenance Project in Pasadena, California. The project involves the replacement and rehabilitation of water, sewer, and gas distribution systems located beneath the concourse of the operating stadium. The scope is divided into a preconstruction phase from October 5 to October 30, 2026, and a construction phase beginning November 2, 2026. The work includes a base bid for domestic water infrastructure and two add alternates for sewer and gas infrastructure, the latter of which involves replacing the underground gas system with new MDPE distribution. Award will be based on a best-value selection process, evaluating technical expertise, financial stability, and safety records, with a disqualification threshold for any Experience Modification Rate (EMR) higher than 1.25. Proposers must demonstrate experience with high-profile sports or entertainment venues and the ability to operate within live-event environments. The contract requires compliance with California prevailing wage laws, DIR registration, and the Build America, Buy America Act for federally funded components. All work must adhere to the Greenbook standard specifications for public works construction and ADA accessibility requirements. Submissions must be delivered via the city's eProcurement portal by September 17, 2026, consisting of separate technical and price proposals. Required documentation includes a surety bonding letter, three years of financial statements, and various certifications, such as the Taxpayer Protection Act and non-collusion declarations. Payment will be based on work completed to date, with strict prohibitions against upfront mobilization or material procurement costs unless specific ownership transfer and verification documents are provided.

General Info

Rose Bowl seeks Construction Manager for plumbing maintenance in Pasadena by September 17, 2026.

Documents

5

099742017 - RBOC Plumbing Infra - Gas Maintenance Project - Issue for Bid

PDF, High priority: read this firstitb
High

099742017 RBOC Plumbing Infra Water Maintenance Project Issue for Bid

PDF, High priority: read this firstitb
High

099742017 Sewer Maintenance Project Issue for Bid

PDF, High priority: read this firstitb
High

RFP 099742017 – CMAR Plumbing Infrastructure Enhanced Maintenance Project

PDF, High priority: read this first112 pages · rfp
High

Copy_of_Bid_Form_v2.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Rose Bowl Operating Company
Contacts2 people available
OfficeN/A

Full Description

Show more
Bid #099742017: $18

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS