Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on March 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Materials Supply (Earthwork, Riprap, Concrete)

Closed
Federal
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract, titled Construction Materials Supply (Earthwork, Riprap, Concrete), is issued by the Department of Defense through W076 Endist Galveston. The contract focuses on the procurement of bulk materials, specifically fill soil, riprap stone, and concrete, necessary for the construction and repair of dikes. The work is slated to be performed in Corpus Christi, and the project falls under NAICS code 327320. The solicitation was posted on March 25, 2026, with a response deadline set for April 15, 2026. There is no specified set-aside status for this requirement. Interested parties can find further details via the provided government workspace link.

General Info

NAICS

327320 - Ready-Mix Concrete Manufacturing

Place of Performance

Corpus Christi, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of W912HY26BA010.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CORPUS CHRISTI SHIP CHANNEL PLACEMENT AREA INNER HARBOR IMPROVEMENTS

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Material Supplier (Ready-Mix Concrete)Open now, due in 47 days
  • Ready-Mix Concrete SupplyOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of bulk materials including fill soil, riprap stone, and concrete for dike construction and repair.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
Mary Rhodes Pump Station: Emergency Streambank Erosion Protection
Solicitation # W912HY27BA001
The U.S. Army Corps of Engineers Galveston District is conducting a market survey via a Sources Sought notice for the Mary Rhodes Pump Station Emergency Streambank Erosion Protection project in Bay City, Texas. The primary objective is to protect the facility from the encroaching erosion of the Lower Colorado River by rebuilding banks, sloping, and installing approximately 2,015 feet of longitudinal fill stone toe protection using at least 16.7 tons of launchable stone per linear foot. The government intends to award a competitive, firm-fixed price, stand-alone contract under the FAR 14 Sealed Bidding process, with an anticipated solicitation issuance date around December 7, 2026. Interested firms must be registered in SAM.gov and provide their UEI and CAGE codes, socioeconomic status, and evidence of capability to perform work of similar magnitude and complexity within the last five years, including at least three project examples. The project falls under NAICS code 237990 with a small business size standard of 45 million dollars. Performance will require strict adherence to the USACE Safety and Health Requirements Manual (EM 385-1-1) and the provision of performance and payment bonds within five calendar days of award. Work is expected to commence within 10 calendar days after the receipt of the Notice to Proceed.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 541370
New
Federal
USACE, FY27 POSMV Wavemaster IMU IP68
Solicitation # W912HY27QA001
The US Army Corps of Engineers (USACE) is soliciting a firm fixed price contract for the purchase of two Inertial Measurement Unit (IMU) IP68 hardware units and two 10-meter Applanix Position and Orientation System for Marine Vessels (POS MV) IMU IP68 cables for the POS MV WaveMaster. This procurement specifically excludes the top side unit. The contractor must provide a three-year hardware warranty and support including email and a 24-hour telephone hotline for reporting defects. Key deliverables include the hardware, connectivity and accuracy testing, and the provision of close-out documentation to the customer and USACE Technical POC. Delivery for both line items is scheduled for March 1, 2027, with shipping terms as FOB Destination, with the government paying transportation costs. This is a total Small Business Set Aside. Award will be based on the most advantageous offer considering price and other factors, with evaluations utilizing the Supplier Performance Risk System (SPRS). Eligible offerors must meet CMMC Level 1 requirements and, if applicable, provide a NIST SP 800-171 assessment score no more than three years old. All shipments must adhere to MIL-STD-129 and MIL-STD-130 marking and labeling standards. Payment requests and receiving reports must be submitted electronically via Wide Area WorkFlow (WAWF).
Surveying and Mapping (except Geophysical) Services

POSTED

7 days ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
Federal
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
Solicitation # W912HY27RA001
The Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 is a construction project located in Harris County, Texas, focusing on the area from Boggy Bayou to Sims Bayou. Managed by the US Army Engineer District Galveston, the project involves widening and deepening the channel, removing abandoned pipelines and a steel bulkhead, and performing comprehensive civil site preparation and containment dike improvements at the Beltway 8 placement area. The scope includes new-work dredging of approximately 4,448,500 cubic yards, conveyance, and placement of material into the Beltway 8, East Clinton, and West Clinton placement areas. This is an unrestricted, firm-fixed-price contract with an estimated value between $100 million and $250 million. Award will be based on the Lowest Price Technically Acceptable (LPTA) procedure, evaluating technical approach, schedule, and past performance. The total period of performance is 603 days after the Notice to Proceed, though specific delivery dates for various CLINs were extended to May 3, 2028, via amendment. The project adheres to strict quality standards, including ASTM and USACE safety requirements, and utilizes a three-phase control management system for inspection and acceptance.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS