Construction of Bakaiya Bridge and Approach Roads (Design and Build) from Ch. Km. 346+800 to 347+520 along Bagmati Bridge -Pathlaiya Section of Mahendra Highway
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Department of Roads in Nepal has issued an award notice for the design and build construction of the Bakaiya Bridge and its associated approach roads. This infrastructure project is located along the Mahendra Highway, specifically spanning from chainage kilometer 346+800 to 347+520 within the Bagmati Bridge-Pathlaiya section. Identified by solicitation number SRCTIP-DOR-W (D&B)- KDP-ICB-07, the project is managed as a federal initiative to improve transportation connectivity. The contract encompasses both the engineering design and the physical construction phases to ensure the bridge and connecting roads meet required specifications for the region.
General Info
Agency
Contract Value
$629,510,894.25NAICS
Place of Performance
NPLSet-Aside
Award Issued Date
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
