Construction of Homestead Water Supply Well No. 7

Active
ITB#202632State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Homestead has issued Invitation to Bid ITB#202632 for the construction of Water Supply Well No. 7 at the Harris Field Water Treatment Facility. This infrastructure project aims to enhance the reliability and resiliency of the city water supply by adding a third well to provide critical backup capacity and redundancy. The new well is designed to support the Racetrack Water Tower Booster Pump Station to maintain system pressure during high-demand events, such as NASCAR races, and will allow existing wells to be rotated for maintenance without reducing production capacity. The project scope includes drilling a 20-inch cased well, constructing a pump house, installing a standby generator, and performing site restoration, piping, and paving repairs. The solicitation was posted on August 28, 2026, with a response deadline of September 29, 2026. The estimated total cost for the project is 3,436,371.58 dollars, which includes a 10 percent contingency. Qualified Florida contractors must adhere to strict safety qualifications, particularly those working near chlorine systems, and must submit a Contractor Safety Qualification Form to avoid disqualification. The contract is governed by the City of Homestead's Special Provisions for Construction Contracts and is supported by technical drawings from Hazen and Sawyer and funding related to grant LPA0017. Bidders are required to sign a site visit indemnification agreement and provide necessary bond forms as part of the submission process.

General Info

City of Homestead ITB#202632 for Water Supply Well No. 7 construction by September 2026.

Agency

Florida → Procurement & Contract ServicesView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(10)

City of Homestead Well No. 7 Bid Tab

XLSX1 pageother

Special Provisions for Construction Contracts - City of Homestead

PDF67 pagescontract-document

Construction of Homestead Water Supply Well No. 7 - Contractor Safety Qualification Form

PDF8 pagessow

ITB#202632 Construction of Homestead Water Supply Well No. 7

PDF58 pagesitb

City of Homestead Site Visit and Inspection Indemnification Agreement

PDF1 pageindemnification-agreement

Construction of Homestead Water Supply Well No. 7 – Contractor Safety Qualification Form

PDF8 pagessow

City_of_Homestead_Well_No_7_Bid_Set_Specifications_(8-26-26).pdf

PDF

City of Homestead Well No. 7 Bid Set Drawings

PDFspecifications

City of Homestead Well No. 7 OPC

PDF1 pageopinion-of-probable-cost

LPA0017 Grant and Amendments

PDF61 pagesamendment

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Procurement & Contract Services
Contacts1 person available
OfficeHomestead, FL, 33030, USA
Organization / Agency
Florida → Procurement & Contract Services
View Agency Profile
Office AddressHomestead, FL, 33030, USA
Contacts
Lissandra KmochProcurement Specialist II

Interested Companies (13)

Show more
Construction 95
LAUDERHILL, FL
ConstructConnect
Cincinnati, OH
FTE Drilling USA
Myrtle Beach, SC

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The construction of a new raw water well at the southwest corner of Harris Field is essential to improving the reliability and resiliency of the City of Homestead's water supply system. The Harris Field Water Treatment Plant currently relies on two wells to meet production demands; the addition of a third well will provide critical backup capacity should either existing well become unavailable. This redundancy is essential to ensuring continuous, uninterrupted water service to residents and businesses. The new well will also play a key role in supporting the Racetrack Water Tower Booster Pump Station, which depends on a stable water source to maintain adequate system pressure particularly during high-demand periods such as NASCAR events. Sustaining proper water pressure during these events is critical to system performance and public safety, underscoring this project's importance as an investment in the City's infrastructure and emergency preparedness. In addition, the new well will allow existing wells to be rotated out of service as needed for routine maintenance and repairs without impacting the City's water production capacity. Well #7 will enable the Harris Field Water Treatment Facility to operate at full capacity, ensuring continued compliance with permit requirements and optimal operational performance.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for the South Marsham Street Green Infrastructure Project located in downtown Romney, West Virginia. This targeted green-street retrofit involves approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The project scope requires the installation of at least 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project includes necessary curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, along with the planting of six native trees and approximately 345 native plants. The primary objective of the retrofit is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses under NAICS code 237110. Interested parties must submit their bids by the deadline of September 17, 2026, at 4:00 P.M. Primary contact for this opportunity is Jennifer Wilson via The Belt Group.
Harbel, Inc.

POSTED

about 6 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves the installation of critical water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, as well as the excavation of cobbles and large boulders. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details