Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction of Homestead Water Supply Well No. 7

Closed
ITB#202632State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Homestead has issued solicitation ITB#202632 for the construction of Water Supply Well No. 7 at the Harris Field Water Treatment Facility. This infrastructure project aims to enhance the reliability and resiliency of the city's water supply by providing critical backup capacity and ensuring continuous service during high-demand periods, such as NASCAR events at the Racetrack Water Tower Booster Pump Station. The scope of work includes drilling a 20-inch diameter cased well capable of 2,200 GPM, constructing a pump house, installing a sound-attenuated diesel standby generator with a 550-gallon belly tank, and installing approximately 423 linear feet of 12-inch ductile iron piping. The project also encompasses electrical and instrumentation work, site restoration, and final commissioning. The contract will be awarded to the low bidder following a responsibility review that evaluates the bidder's financial capability, organizational capacity, and past performance on similar projects within the last five years. The estimated project cost is approximately 3.44 million dollars, including a 10 percent contingency. Compliance requirements are extensive, including adherence to the Florida Department of Environmental Protection Agreement No. LPA0017, the State of Florida Trench Safety Act, and Davis-Bacon and Related Acts for federal funding. Bidders must submit all proposals electronically via the city's e-Procurement Portal by September 29, 2026, and must provide a bid bond, Florida contractor's license, and a completed contractor safety qualification form for work adjacent to chlorine systems.

General Info

City of Homestead seeks low bidder for Water Supply Well 7 construction project.

Documents

10

City of Homestead Well No. 7 Bid Set Drawings

PDF, High priority: read this firstspecifications
High

Construction of Homestead Water Supply Well No. 7 - Contractor Safety Qualification Form

PDF, High priority: read this first8 pages · sow
High

Construction of Homestead Water Supply Well No. 7 – Contractor Safety Qualification Form

PDF, High priority: read this first8 pages · sow
High

ITB#202632 Construction of Homestead Water Supply Well No. 7

PDF, High priority: read this first58 pages · itb
High

LPA0017 Grant and Amendments

PDF, High priority: read this first61 pages · amendment
High

Special Provisions for Construction Contracts - City of Homestead

PDF, High priority: read this first67 pages · contract-document
High

City of Homestead Site Visit and Inspection Indemnification Agreement

PDF, Low priority1 page · indemnification-agreement
Low

City of Homestead Well No. 7 Bid Tab

XLSX, Low priority1 page · other
Low

City of Homestead Well No. 7 OPC

PDF, Low priority1 page · opinion-of-probable-cost
Low

City_of_Homestead_Well_No_7_Bid_Set_Specifications_(8-26-26).pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Procurement & Contract Services
Contacts1 person available
OfficeHomestead, FL, 33030, USA
Office AddressHomestead, FL, 33030, USA
Contacts
Lissandra KmochProcurement Specialist II

Interested Companies (13)

Construction 95LAUDERHILL, FL
ConstructConnectCincinnati, OH
FTE Drilling USAMyrtle Beach, SC

See All 13 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The construction of a new raw water well at the southwest corner of Harris Field is essential to improving the reliability and resiliency of the City of Homestead's water supply system. The Harris Field Water Treatment Plant currently relies on two wells to meet production demands; the addition of a third well will provide critical backup capacity should either existing well become unavailable. This redundancy is essential to ensuring continuous, uninterrupted water service to residents and businesses. The new well will also play a key role in supporting the Racetrack Water Tower Booster Pump Station, which depends on a stable water source to maintain adequate system pressure particularly during high-demand periods such as NASCAR events. Sustaining proper water pressure during these events is critical to system performance and public safety, underscoring this project's importance as an investment in the City's infrastructure and emergency preparedness. In addition, the new well will allow existing wells to be rotated out of service as needed for routine maintenance and repairs without impacting the City's water production capacity. Well #7 will enable the Harris Field Water Treatment Facility to operate at full capacity, ensuring continued compliance with permit requirements and optimal operational performance.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS