Construction of Water Plant No. 1 Chloramine Conversion and Surface Water Tie-In

Active
6ada82701c7615dd143b49a9State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Construction of Water Plant No. 1 Chloramine Conversion and Surface Water Tie-In project for the Castlewood Municipal Utility District in Texas involves the comprehensive construction of a CMU block building to house new chemical equipment. The scope of work includes the installation of gaseous chlorine equipment for surface water treatment and liquid ammonia sulfate equipment for both groundwater and surface water, featuring pumps, storage tanks with secondary containment, feed piping, and injection quills. Additionally, the contractor is responsible for all associated plant piping, electrical and control work, a ChemScan analyzer with sample lines, and a drop-in tank mixer. The project further encompasses essential site development and compliance tasks, including grading, drainage, protective coatings, and the disinfection of tanks and piping. The contractor must provide construction materials testing and hydromulch seeding for all disturbed areas. A critical component of the contract is the full implementation of a Storm Water Pollution Prevention Plan, which requires the installation, maintenance, inspection, and reporting of all pollution prevention measures to ensure adherence to best management practices.

General Info

Construction of water plant chemical building, equipment installation, and site development in Texas.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Castlewood Municipal Utility District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The work consists of, but is not limited to, providing the necessary labor, materials, equipment, supervision, and plant to construct one (1) CMU block building to house all new chemical equipment; gaseous chlorine equipment for treatment of the surface water and liquid ammonia sulfate equipment for treatment of the groundwater and surface water including pumps, storage tank with secondary containment, chemical feed piping and injection quills; associated plant piping, valves, fittings, thrust blocks, and pipe supports; associated electrical and control work; one (1) ChemScan analyzer including water sample lines; one (1) drop in tank mixer; protective coatings; site work including grading and drainage; tank and piping disinfection; construction materials testing; hydromulch seeding of all disturbed areas; Storm Water Pollution Prevention Plan Implementation for work including installation, maintenance, inspections, and reporting for all pollution prevention measures as required for best management practices in conjunction with construction of the proposed work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a complete operating pumping station featuring mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on M/WBE compliance and the submission of Good Faith Efforts documentation. Bids are due by November 12, 2026. The selected contractor must provide performance and payment bonds, maintain insurance with an A.M. Best rating of A-VII or better, and adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Performance is monitored by the Engineer, and failure to achieve substantial completion within the specified timeframe will result in liquidated damages of $1,000 per day. Payments are processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the use of FRP reinforcing systems. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances, as well as the installation of new slide gates and access hatches. Additionally, the project requires the rehabilitation of reactor mixers and aerators, replacement of motor control center components, and improvements to electrical and instrumentation systems. Specialized tasks include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the installation and operation of a temporary 11 MGD pumped bypass. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. All subcontractors are strictly required to utilize union labor. Potential bidders must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company and must include their bond rate with their submission for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions provided as redlines.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS