Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on June 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Scheduling and Project Controls

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Public Works Department of California is seeking a subcontractor for Construction Scheduling and Project Controls for a transportation infrastructure project. The primary objective of this contract is the development and maintenance of a detailed construction schedule that aligns with specific project milestones and contractual requirements, utilizing Primavera P6 or an equivalent scheduling software. This subcontract opportunity was posted on June 7, 2024, with a response deadline of June 27, 2024. The project falls under NAICS code 541330, focusing on engineering services to ensure rigorous project controls and scheduling accuracy throughout the duration of the infrastructure work.

General Info

California Public Works seeks a construction scheduling subcontractor for transportation infrastructure project controls.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 1723-02.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Marshes Flat Road Storm Damage at First Creek and Second Creek

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Civil Design & PS&E DevelopmentOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and maintain a detailed construction schedule using Primavera P6 or equivalent, aligned with project milestones and contractual requirements for a transportation infrastructure project.

More opportunities from California → Public Works Department

Same awarding agency

NAICS: 237310
New
SLED
Trower Avenue Paving (Linda Vista Avenue to Solano Avenue)
Solicitation # 2026-IFB - PC-057
The City of Napa has issued solicitation 2026-IFB - PC-057 for the Trower Avenue Paving project, located between Linda Vista Avenue and Solano Avenue. With an estimated construction cost of 1,181,000 USD, the scope of work includes grinding, paving, minor concrete work, tree removal, striping, signage, and the removal of pavement markers. The project requires the adjustment of various utility frames and boxes to grade and the implementation of traffic control measures to maintain one lane of traffic in each direction and accommodate bicycle traffic per CA MUTCD standards. The contractor must also provide site protections, including six-foot-high temporary chain link fencing with opaque black mesh screening. The contract will be awarded to the lowest responsible bidder, with potential local bidder preferences applied per Napa Municipal Code Chapter 2.93. Bids must be submitted electronically via OpenGov in PDF format by December 10, 2026, and must include a bid form, non-collusion declaration, subcontractor list, and a bid security equal to ten percent of the maximum bid amount. Once awarded, the project is anticipated to begin around April 5, 2027, with a completion timeline of 45 to 60 working days. Required security includes performance, payment, and warranty bonds, and the contractor must comply with California prevailing wage laws and ADA standards for curb ramp construction. Inspection and acceptance will be managed by the Engineer and the Napa Sanitation District, with a mandatory Quality Control Plan for HMA production and placement.
Highway, Street, and Bridge Construction

POSTED

about 20 hours ago

DEADLINE

in 23 days
View Details
NAICS: 562920
New
SLED
MATERIAL RECOVERY PROCESSING FOR RESIDENTIAL & COMMERCIAL RECYCLING
Solicitation # 2026-RFP-0538
The City of Pasadena Public Works Department is soliciting proposals under solicitation 2026-RFP-0538 for a contractor to provide material recovery processing for residential and commercial commingled recyclable materials. The scope of work requires the contractor to provide all labor, equipment, and permits necessary to receive, process, recover, and market approximately 7,900 tons of recyclable materials annually, including various papers, glass, aluminum, tin, and plastics 1 through 5. The selected vendor must maintain a processing capacity of 50 tons per day and demonstrate a minimum monthly diversion rate of 75% to ensure materials are recycled rather than landfilled. Additionally, the processing facility must be located within 30 road miles of the City of Pasadena City Yards. Award selection is based on a weighted scoring system where the service proposal accounts for 50% of the total points, with additional preferences awarded to local Pasadena businesses and certified small or micro-businesses. Proposals must be submitted in two separate volumes, technical and price, via the eProcurement Portal by December 14, 2026. The contractor is required to provide monthly tonnage reports and adhere to Cal-OSHA safety standards. Invoicing is managed through the City's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays. All digital deliverables must comply with WCAG 2.1 Level AA and Section 508 accessibility standards.
Materials Recovery Facilities

POSTED

5 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS