Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of State was posted on August 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Services for the relocation of U.S. Embassy's Chancery-Annex Connectivity Line located at Natun Bazar Metro Station Construction Site

Closed
RFQPR15426539Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Embassy Dhaka is seeking a contractor to relocate the connectivity line for the Chancery-Annex at the Natun Bazar Metro Station construction site. The project involves installing four 4-inch diameter metal conduits within a 12-inch diameter protective mild steel pipe along the entire length of the connection. The work includes removing existing pavement, constructing necessary pits and concrete structures, and restoring the site as per provided specifications and drawings. The contractor is responsible for supplying all materials, tools, and labor required to complete the project, including demolition and dismantling of existing infrastructure, with prior approval from the government through joint review. This solicitation, posted on August 18, 2025, with a response deadline of August 28, 2025, is issued by the Department of State’s Embassy Dhaka. The contract falls under NAICS code 2371 and involves construction services at the specified site in Dhaka, Bangladesh. Key contacts for inquiries are MD Rofiqul Islam and Robin L. Jones, whose details are provided. The project emphasizes adherence to technical specifications, safety standards, and coordination with government representatives to ensure proper execution of the relocation work.

General Info

Agency

Department Of State → Embassy Dhaka

NAICS

2371 - Utility System Construction

Place of Performance

Dhaka, BD-C, 1212, BGD

Set-Aside

NONE

Documents

2

RFQ PR15426539 - Construction for Chancery-Annex Connectivity Relocation

PDF, High priority: read this first60 pages · rfq
High

RFQ PR15426539 - Construction for Chancery-Annex Connectivity Relocation

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → Embassy Dhaka
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → Embassy Dhaka
Office AddressWASHINGTON, DC, 20520, USA
Contacts
Md Rofiqul Islam
Robin L. Jones

Full Description

Show more
U S Embassy Dhaka requires a contractor to relocate Chancery-Annex connectivity line consisting of four 4-inch diameter metal conduits at Natun Bazar Metro Station construction site. Work of this contract is comprised of placing four 4-inch diameter metal conduit in a 12-inch diameter protective mild steel pipe surrounding the conduits throughout the length of the connectivity, removing the existing pavement works, and redoing the same where necessary at Natun Bazar Metro Station construction site, Baridhara, as per specifications and drawings provided, including construction of pit and other necessary concrete works. The scope of the work is described in the specifications. All materials, metal conduit pipe, protective mild steel pipe, reinforcing bar, cement, sand, stone chips, paving tiles, labor, tools and equipment shall be provided by the contractor, except otherwise mentioned in SOW and shall also perform operations necessary to complete the work as well as removing, demolishing, dismantling existing works on proposed site. All the above requirements will be based on prior joint review and concurrence by the Government and the Contractor.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS