Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on October 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Contaminated Soil Excavation at Perham Arsenic Site

Closed
9936776State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 924110
New
Grant
Fiscal Year 2026 Flood Mitigation Assistance
Solicitation # DHS-26-MT-029-000-98
The Fiscal Year 2026 Flood Mitigation Assistance (FMA) grant program, solicitation number DHS-26-MT-029-000-98, is a federal funding opportunity administered by FEMA under the Department of Homeland Security. With total program funding of 400 million dollars and an expected 40 awards, the program aims to reduce or eliminate repetitive flood damage to buildings and structures insured by the National Flood Insurance Program (NFIP). Eligible applicants include states, U.S. territories, federally recognized tribal governments, and local governments. The program focuses on three primary objectives: building capability and capacity for future risk reduction, implementing localized flood risk reduction projects, and executing individual flood mitigation projects. Cost sharing is required for these awards, and the projected period of performance is 36 months from the date of the award. Applications must be submitted via the FEMA GO portal by February 26, 2027, at 3:00 p.m. Eastern Time. Applicants are required to maintain an active SAM.gov account, a Unique Entity ID (UEI), and an Employer Identification Number (EIN). FEMA utilizes a tiered priority system for awards, first funding eligible mitigation plans and technical assistance, followed by high-scoring project scoping subapplications, and finally other eligible subapplications based on their benefits to the NFIP. Evaluation is based on specific scoring factors, including the number of substantially damaged structures and active NFIP policies. Recipients must comply with the Build America, Buy America Act for infrastructure materials and adhere to strict environmental and historic preservation reviews. Performance is measured by targets including the selection of over 500 NFIP-insured properties and the avoidance of more than 900 million dollars in flood losses.
FEMA

POSTED

6 days ago

DEADLINE

in 4 months
NAICS: 924110
SLED
Buzzards Bay Watershed Infrastructure and CCMP Support Grant Program FY2027
Solicitation # BD-27-1042-CZM-ENV40-134574
The Buzzards Bay Watershed Infrastructure and CCMP Support Grant Program for FY2027 is a solicitation issued by the Massachusetts Executive Office of Energy and Environmental Affairs, specifically through Coastal Zone Management. The program provides financial and technical resources to municipalities for projects that protect and restore water quality and living resources within the Buzzards Bay watershed. To be eligible, projects must implement recommendations from the Comprehensive Conservation and Management Plan and fall within one of ten eligible grant categories, such as wetland restoration, nutrient removal retrofits, and stormwater facility design or construction. A total pool of 748,001 USD in federal funding from the Infrastructure Investment and Jobs Act is available, with individual awards capped at 375,000 USD for approximately three to six selected projects. Applications must be submitted electronically via the EEA Grant Management System by December 8, 2026. Proposals are evaluated on a competitive basis, with scoring focused on the degree of environmental impairment, priority category, climate resilience, and alignment with Commonwealth Environmental Justice goals. Municipalities must be compliant with the MBTA Communities Law to be eligible. The anticipated contract period begins in February 2027 and ends on December 31, 2027, with potential extensions to June 30, 2028. Funding is provided on a reimbursement basis, and all projects must comply with the Build America, Buy America Act, requiring the use of domestically produced iron, steel, and construction materials.
CZM - Coastal Zone Management

POSTED

8 days ago

DEADLINE

in about 1 month
NAICS: 924110
Grant
Solid Waste Management Grant Program
Solicitation # SWMFY27
The Solid Waste Management Grant Program, administered by the USDA Rural Utilities Service, provides approximately 4,000,000 dollars in funding for fiscal year 2027 to assist rural communities in improving the planning and management of solid waste sites. The program focuses on providing technical assistance and training to reduce waste streams through recycling and reuse, enhance landfill operator skills, develop closure and future land use plans, and evaluate threats to water resources. Specific priorities include addressing emerging contaminants such as PFAS and promoting the collection of hazardous materials like pharmaceuticals and electronics. The performance period for these awards runs from October 1, 2027, to September 30, 2028. Eligible nonprofit organizations must submit applications via grants.gov by December 31, 2026. A complete submission requires an SF-424, SF-424A, a project proposal limited to 20 pages, organizational documents, a recent audit, and a Certificate of Good Standing. The total application package is capped at 50 pages, excluding audits. Applications are scored competitively based on applicant status, target area population, the quality of assistance provided, evaluation methods, and matching funds. Grant funds are strictly prohibited from being used for construction, purchasing real estate or vehicles, lobbying, or duplicating services provided by other federal programs, such as those under the National Forest-Dependent Rural Communities Economic Diversification Act of 1990.
Rural Utilities Service

POSTED

27 days ago

DEADLINE

in 2 months
NAICS: 924110
SLED
New Hampshire Clean Diesel Program
Solicitation # DES 2026-10
The New Hampshire Clean Diesel Program, administered by the Department of Environmental Services, is a solicitation for competitive grant applications to fund diesel emissions reduction projects within the state. With approximately 1,000,000 dollars available, the program operates on a rolling monthly basis to provide partial reimbursement for eligible projects. Eligible activities include the installation of EPA-certified remanufacture systems, EPA-verified idle reduction technologies, aerodynamic technologies, and low rolling resistance tires. A critical requirement for replacement projects is the permanent scrappage of old diesel units, which must be disabled by drilling a three-inch hole in the engine block and cutting through the frame rails. Additionally, electric vehicle supply equipment and certain idle reduction technologies must comply with Build America, Buy America sourcing requirements. Applications are evaluated using a 100-point scoring system, with bonus points available for alternative fuel use and projects benefiting priority New Hampshire communities. Non-profit and private entities must first pass a preliminary assessment by achieving a minimum impact score of four out of five regarding public and economic benefits. Because this is a partial reimbursement program, awardees must cover all project costs upfront and provide proof of payment to receive funds. Once awarded, replacement units must remain in service for at least five years to avoid potential reimbursement of the grant to the state. Recipients are also subject to a reporting schedule consisting of quarterly reports for two years followed by three annual reports.
Department Of Environmental Services

POSTED

27 days ago

DEADLINE

in 11 months

AI Contract Overview

Show more

The contract involves a comprehensive soil excavation and remediation project at the Perham Arsenic Site, managed under a single prime contract encompassing general, mechanical, and electrical work. The primary objective is to remove arsenic-contaminated soils, which originate from historical use of lead arsenate for grasshopper control in the mid-20th century, and to dispose of impacted materials safely. The project includes extensive site preparation, such as demolition of existing structures, removal of asphalt and foundations, installation of shoring and dewatering systems, and excavation guided by GPS and 3D modeling to ensure precise removal within designated boundaries. The contractor will also handle site restoration activities, including backfilling, grading, seeding, and utility reconnection, ensuring the site is restored to its pre-excavation condition with erosion control measures in place. The scope covers the excavation of approximately 20,006 cubic yards of soil, with an estimated 4,922 cubic yards of arsenic-impacted soil to be disposed of off-site. Additional activities include installing soil additives, managing water and waste, and conducting post-excavation surveys. Oversight and management will be provided by the Engineer, who will guide excavation activities, monitor environmental controls, and ensure compliance with safety and environmental standards. The contract, valued between $500,000 and $2 million, is overseen by the Minnesota Department of Administration, with a response deadline of November 24, 2025, and includes provisions for site decontamination, project documentation, and a one-year warranty on settling and erosion repairs.

General Info

Agency

Minnesota Department of Administration

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota Department of Administration
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota Department of Administration
Office AddressN/A
Contacts
Craig FernholzAcquisition Management Specialist

Full Description

Show more
State Project Number SR0000056 Contaminated Soil Excavation at Perham Arsenic Site
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
The Minnesota Pollution Control Agency (MPCA) has hired Bay West LLC (Bay West; the “Engineer”) to perform a soil removal corrective action of arsenic contaminated soils at the Perham Arsenic Site (the Site) (Figure 1). The Site is currently vacant and owned by the State. The property immediately north is owned by the City of Perham and used for the fairgrounds. The building, treatment system and rabbit shed were demolished in 2024.
The U.S. Department of Agriculture distributed lead arsenate to several agricultural fields in Minnesota as insecticide to combat grasshopper infestation in the 1930s and 1940s. The grasshopper control was dispersed around farm fields to prevent crop loss. Otter Tail County, located in northwestern Minnesota, was included in the arsenic-based grasshopper bait distribution program. The present-day location of the East Otter Tail County Fairgrounds, in the City of Perham, was used as a mixing station and depositor for pure lead arsenate and unused arsenic-based grasshopper bait. In 1947, an estimated 200 to 2,500 pounds (lb) of unused arsenic-based grasshopper bait was buried in a shallow pit in the southwest corner of the fairgrounds. The pit dimensions were approximately 15 by 20 ft with an approximate depth of 3 to 6 ft. The buried grasshopper bait—contained in burlap bags, wood crates, or other biodegradable material—is believed to have been composed of more than 50 lb of technical-grade lead arsenate. The arsenic concentrations pose a risk to human health and the environment. The primary project objectives are: removal and disposal of the bulk of the arsenic contaminated soil beneath the project site property (Site), removal and disposal of the infiltration gallery and select abandoned monitoring wells in the excavation footprint, and site restoration, including restoring grade and adding cover crop to prevent erosion.
The Contractor shall:
1. Visit and review the Site with the Engineer; 2. Prepare and provide the Engineer with a Soil Excavation and Disposal Plan, Groundwater Management Plan, Site Safety & Health Plan, and any other submittals required in this specification; 3. Obtain and comply with all necessary permits to complete the work; 4. Conduct startup including mobilization of labor, equipment, and materials; 5. Conduct pre-survey of excavation boundaries; 6. Provide and maintain temporary facilities and controls including temporary utilities (electricity/water), sanitary facilities, construction facilities, traffic controls, site and excavation security (e.g. barricades, temporary fencing); 7. Abide by the air monitoring plan and health and safety protocol; 8. Conduct public and private utility locates; 9. Provide erosion controls and stormwater controls; 10. Provide and install plastic sheeting to any non-impacted soil stockpiled; 11. Determine haul truck traffic patterns, setup loading station(s) and stockpile location(s); 12. Setup stockpile locations, if necessary; 13. Install shoring or other engineered controls (at Contractors’ discretion where shoring is necessary to achieve excavation depths and meet all applicable regulations); 14. Remove any permanent fencing in the excavation area that impedes completion of excavation activities; 15. Remove asphalt (both sides of former commercial building), concrete and gravel surfaces and remove remaining building slab and foundations; 16. Dispose of asphalt, concrete, gravel, and building slab and foundations; 17. Excavate soil within designated limits and to designated depths. Note: Excavation will largely be GPS guided excavation work given the limitations for field screening of arsenic and the comprehensive 3D modeling data available for the plume extent. Soils will be excavated utilizing existing plume map boundaries including the segregation of clean versus impacted soils. 18. Seal and abandon extraction well lateral piping in place per the Minnesota well code; 19. Cut four abandoned extraction well casings 2 feet below grade and backfill to grade/restore; 20. Remove remnants of abandoned MEW-1 and MEW-1A in excavation footprint; 21. Install dewatering well network, as necessary; 22. Implement dewatering/treatment system and manage water, as necessary; 23. Remove and dispose of infiltration gallery; 24. Transport and dispose removed impacted soil; 25. Conduct waste management and tracking documentation; 26. Apply and mix additive (FerroBlack® or Engineer approved equivalent) into bottom of excavation prior to backfilling activities; an estimated 56,500 lbs will be mechanically mixed in to the impacted bottom of the excavation; 27. Partially backfill and compact excavation area with previously removed/stockpiled clean overburden; 28. Provide and import additional soil for backfill and complete backfilling and compaction of excavation; 29. Restore any sidewalks, curb and gutter damaged or removed as a result of the excavation and construct new curb and gutter as necessary; 30. Provide, set and grade topsoil to match the grade documented in pre-excavation survey, replace sod and add new cover crop where building/south asphalt lot were following the specifications laid out in the MnDOT Seeding Manual, utilizing the 2024 2575.608 seed two year cover crop or engineer approved equivalent; 31. Complete in-kind replacement of north asphalt lot. 32. Remove temporary fencing following completion of work; 33. Replace any permanent fencing that was removed following completion of work; 34. Conduct decontamination activities and management; 35. Clean Site and complete site restoration; In addition, restore and reconnect any permanent and active utilities that were temporarily moved, padded, braced, disconnected, and/or removed due to the excavation activities (if necessary). 36. Conduct post-survey of excavation boundaries; 37. Demobilize from the Site; 38. Provide one-year warranty for settling and erosion repairs; 39. Provide all project planning, project closeout submittals, and execution documentation, as requested by the Engineer.
The estimated total volume of soil to be excavated is 20,006 cubic yards (CY). The estimated excavation volume assumes shoring will be used and a final depth of approximately 30 feet (Figure 3). It is at the Contractors’ discretion where shoring is necessary to achieve excavation depths and meet all applicable regulations. The estimated amount of in-place soil to be used as backfill material is 15,084 CY. The total estimated amount of in-place arsenic impacted soil to be excavated and disposed off-site at an Owner-approved landfill is 4,922 in-place CY. For this specification, the amount of arsenic-impacted soil to be excavated and disposed off-site is 9,800 tons. This figure is based on 4,922 in-place CY plus 10% additional volume and a weight per volume ratio of 1.8 tons/CY. The estimated amount of imported fill to be provided is 6,650 CY.
The Engineer will manage the soil and debris removal corrective action and oversee the Contractor in performing the removal activities. Soil excavation activities including engineering controls, dewatering if necessary, on-Site and perimeter dust monitoring (per the air monitoring plan), dust suppression (per the air monitoring plan), removal, disposal, providing soil for backfill, backfilling, compaction and restoration will be completed by the Contractor. The Engineer will provide oversight of Contractor, guide excavation progression, provide GPS data to guide proposed excavation (available in RockWorks model and/or X,Y,Z coordinates), quantify/track soil removal, and complete field documentation, reporting, and any other activities associated with the soil removal corrective action and treatment that are not assigned to the Contractor.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS