Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Contract for Design, Supply, Installation, and Commissioning of a 12 MWp Solar PV Plant with 36 MWh BESS and 13.5 km 33 kV Line for BEC, Berbera, Somaliland

Awarded
SO-MOEM-445076-CW-RFBInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ministry of Energy and Minerals for the Government of Somaliland has issued an award notice for the design, supply, installation, and commissioning of a solar energy project in Berbera. This infrastructure initiative involves the construction of a 12 MWp Solar PV Plant integrated with a 36 MWh Battery Energy Storage System to enhance hybridization and power stability in the region. In addition to the generation and storage components, the contract includes the installation of a 13.5 km 33 kV transmission line for the Berbera Electric Company. This project is managed under solicitation number SO-MOEM-445076-CW-RFB and is aimed at improving the energy capacity and reliability of the local electrical grid.

General Info

Somaliland project for 12MWp solar plant, 36MWh battery storage, and 13.5km transmission line.

Contract Value

$18,999,995

NAICS

N/A

Place of Performance

SOM

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMinistry of Energy and Minerals, Government of Somaliland
ContactsNo contacts available
OfficeSOM
Office AddressSOM
ContactsNo contact information available

Full Description

Show more
Plant, Design, installs test and commissions of Hybridization and battery storage systems for Berbera, Somaliland.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS