CONTRACTOR FIRST ARTIC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, issued under solicitation SPE4A5-26-T-196K by the Department of Defense’s ASC Supplier OEM Division, requires the delivery of seven units of NSN/Part Number 0001S00000053 with a delivery deadline 339 days after award. First Article Testing is mandatory for Lot/Item 1620/9325434, mandating the contractor to test two units and submit a detailed test report within 120 calendar days of contract award, with prior written notice provided to the Contracting Officer and Quality Assurance Representative at least 14 days before shipment for Government Final Acceptance Testing. The Government has 60 days after receiving the report to issue written approval, conditional approval, or disapproval. Production Lot Testing follows First Article approval, requiring the contractor to conduct testing on two randomly selected samples from the production lot, ensure all tests validate conformance to technical and quality requirements, and absorb the cost of consumed or destroyed samples. Failure of any PLT sample results in rejection of the entire production lot, necessitating immediate notification to the Contracting Officer and proposal of corrective action. All PLT reports must be prepared per DI-NDTI-80809B, include DD Form 1222 and DD Form 250/iRAPT signed by the QAR, and be accompanied by supporting documentation including test results, certifications, process sheets, and marked drawings. The contractor must also provide details on current dealer/distributor certification or accreditation. Fast Pay is not applicable. The place of performance is San Diego, CA, and the primary point of contact is Avis Binford. The solicitation response deadline is June 8, 2026, with posting on May 31, 2026, under NAICS code 336413 for Aerospace Product and Parts Manufacturing.
General Info
Agency
NAICS
Place of Performance
3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 2 UNIT(S) OF LOT/ITEM 1620 / 9325434 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 120 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E03: Production Lot Testing – Contractor (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. (2) The contractor shall provide written notice to the contracting officer and the QAR of the time and location of the test at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the production lot test so the Government may witness the test. (3) The QAR will select 2 samples at random from the production lot(s) produced. (4) The contractor shall perform all tests on the PLT samples to verify/validate for the QAR that the items meet the contract technical/quality requirements. (5) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (6) Prepare and disseminate the PLT report as follows: (a) Prepare the test report in accordance with data item description DI-NDTI-80809B and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].”
SPE4A5-26-T-196K
SECTION A
(b) Present the contractor’s PLT report to the QAR for review. (c) Include the following documentation with all shipments of PLT Reports: DD Form 1222 and DD Form 250/iRAPT receiving report signed by the QAR; a copy of the contract/order; a copy of all applicable test reports showing actual results and tolerances specified in the technical data package; material and process certifications; process operations and inspection method sheets; copies of drawings used to manufacture the PLT sample with proper marking to restrict public disclosure (if desired) and from Government use other than for NSN/Part Number: 0001S00000053 Quantity: 7 EA Purchase Request: 7016845315QTY - See Solicitation Delivery: 339 days ADO
More opportunities from Department Of Defense → ASC SUPPLIER OPER OEM DIVISION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS