CONTRACTOR FIRST ARTIC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is for the procurement of one air brake reservoir under solicitation SPE7L3-26-T-181F for the Department of Defense. The requirement mandates strict adherence to DLA packaging and quality standards, including the use of components from Qualified Products Lists or Qualified Manufacturers Lists and compliance with source control drawings. Specific technical exceptions are noted for drawings 11636427 and 11636722 regarding pipe plugs and hole orientations. Additionally, the use of Class I ozone depleting chemicals is strictly prohibited. The agreement includes a Contractor First Article Testing requirement, necessitating the testing of one unit and the submission of a report within 120 calendar days. Quality assurance will be managed through inspection and acceptance at origin, utilizing sampling methods such as MIL-STD-1916 or ASQ H1331. The delivery period is set at 155 days after order, with performance taking place at Fort Drum. This is a full and open competition procurement.
General Info
Agency
NAICS
Place of Performance
BLDG 4486 CAMP SWIFT ROAD, FORT DRUM, NY, 13602-5000, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
RESERVOIR, AIR BRAKE.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML
REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE
QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE
QPL(S)/QML(S).
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
EXCEPTION TO DWG 11636427: IN ZONE A8, PIPE PLUG
SHOULD READ WWP471 A CA BC B.
EXCEPTIONS TO DWG 11636722:1)30 DEGREE DIMENSION
SHOULD READ 30 DEGREES PLUS 10, MINUS 0 DEGREES.
2)ORIENTATION OF .72 DIA HOLE TO .50 DIA HOLE
SHOULD BE AS SHOWN ON ASSEMBLY DWG 11636427<(>,<)>
90 DEGREES APART.
"THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH
MUST CONFORM TO SOURCE CONTROL DRAWING. BY
SPE7L3-26-T-181F
SECTION B
SUBMITTING AN OFFER, THE OFFEROR AGREES TO
PROVIDE SOURCE CONTROLLED COMPONENTS FROM
SOURCES APPROVED ON THE APPLICABLE SOURCE
CONTROL DRAWING."
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
FULL AND OPEN COMPETITION APPLY
DETAILED DRAWING (ONE ITEM)
SPECIFICATION
"DATA LIST"
DRAFT TEMPLATE AUTO-SOLICIT CONTRACTOR FAT CONTRACTOR FAT APPLIES. PER
FAR 52.209-3: (A) THE CONTRACTOR SHALL TEST 1UNIT(S)# AT LEAST 10
CALENDAR DAYS BEFORE THE BEGINNING OF FIRST ARTICLE TESTING, THE
CONTRACTOR SHALL NOTIFY# (B) THE CONTRACTOR SHALL SUBMIT THE FAT REPORT
WITHIN120_CALENDAR DAYS# (NOTE: THE DELIVERY SCHEDULE ON THE FACE OF
THE SOLICITATION REFLECTS ONLY THE TIME TO DELIVER THE SUPPLIES.) WITHIN
30_ CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE FIRST ARTICLE THE
CONTRACTING OFFICER SHALL NOTIFY# PER DLAD 52.209-9017, ALT III
DISPOSITION OF FIRST ARTICLES: SEE BELOW FOR FILL-IN'S AFTER RECEIPT
OF QUOTES, OFFERORS MAY BE CONTACTED TO PRICE THE FAT REQUIREMENT.
SELECT (1) OF THE FOLLOWING AND PLACE UNDER DISPOSITION NSN/Part Number: 0001S00000053 Quantity: 1 EA Purchase Request: 7017880877QTY - See Solicitation Delivery: 155 days ADO
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → LAND SUPPLIER OPNS VEHICLE SPT
Same awarding agency
