This Solicitation opportunity from Department Of Defense was posted on April 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONTROL MODULE
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the repair of a control module with all freight terms set as FOB Origin, where the Navy handles transportation in accordance with the Commercial Asset Visibility (CAV) Statement of Work. The Government requires a Repair Turnaround Time (RTAT) of 78 days, measured from the physical receipt of the asset at the contractor’s facility to final inspection and acceptance. Contractors must provide a firm quote detailing unit price, total price, RTAT, and the validity period of their quote, with an emphasis on meeting or beating the required RTAT. If the contractor cannot meet the Government’s RTAT, they must disclose capacity constraints. Government Source Inspection (GSI) is mandatory, and timely and accurate reporting through the CAV system is required. Pricing may be firm-fixed, estimated, or not-to-exceed, and provisions exist for testing and evaluation fees if assets are found beyond economical repair (BR/BER), which would result in a negotiated reduced contract price. The contract includes clauses for price reductions per unit per month for RTAT delays not excused by government factors, with potential for termination if delays persist. An option quantity may be added to increase the order at the original unit price. The point of contact for the solicitation is Xavier Kellam, with a response deadline of May 18, 2026. The solicitation is issued by the Department of Defense’s Navsup Weapon Systems Support Mech office in Mechanicsburg, PA.
General Info
Agency
NAICS
Place of Performance
PASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 78 DAYS
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (RTAT): _______ days
o Number of Days Quote is Valid (ideally 60 days or longer): ________ Days
If your company is not quoting the Government’s Required Repair Turnaround
Time (RTAT) or earlier, provide your company’s capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor’s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
o Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as "awardee CAGE":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a "reconciliation modification" at the end of the contract
performance. Price reductions made pursuant to this section shall not limit
other remedies available to the Government for failure to meet required RTATs,
including but not limited to the Government’s right to terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: $__________, up to a maximum of: $_________.
*************** OPTION QUANTITY ***************
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
o Please indicate the pricing for the option quantity:
o Price Each: $_____________
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: XAVIER.A.KELLAM.CIV@US.NAVY.MIL
More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
