Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Control Systems and Monitoring Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the integration of generator control systems with existing tank monitoring and SCADA infrastructure to enable remote operation and real-time monitoring capabilities. Key functions include remote start and stop of generators, continuous fuel level tracking, and automated fault alerting to ensure operational continuity and rapid response to anomalies. The work is focused on enhancing system interoperability across critical infrastructure components within the Central Coast Water Authority’s facilities, with performance required at a single location in zip code 93461. This subcontract falls under NAICS code 268120, indicating its classification within water supply and irrigation systems, reflecting the utility-driven nature of the project. The solicitation was posted on May 29, 2026, and is intended to support ongoing operational efficiency and system resilience for water resource management.

General Info

Integrate generator controls with SCADA for remote monitoring and fuel tracking at Central Coast Water Authority, zip 93461.

Agency

California → Central Coast Water Authority

NAICS

268120

Place of Performance

CA, 93461

Set-Aside

NONE

Documents

This scope was carved out of Tank 2 Generator and Fuel System Replacement Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Coast Water Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Central Coast Water Authority
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Integration of generator controls with existing tank monitoring and SCADA systems for remote start/stop, fuel level monitoring, and fault alerts.

Similar Contracts

Same NAICS industry code

NAICS: 268120
SLED
Fiber Optic Cable InstallationThe contract involves the pulling and splicing of fiber optic cable through pre-installed conduit along designated county roads in Modoc County, California. The work is categorized under NAICS code 268120, indicating it pertains to telecommunications line installation activities, and is structured as a subcontract under the broader umbrella of infrastructure development. All operations must be conducted in compliance with existing conduit placements, requiring precision and adherence to technical standards to ensure signal integrity and long-term network reliability. The project is set to be performed within the jurisdiction of Modoc County, with the place of performance tied to specific roadways managed by the county, though exact locations are not detailed in the provided data. The solicitation was posted on June 11, 2026, and the contract is accessible through the public project portal linked via the California Environmental Quality Act system. There is no set-aside classification specified, meaning the subcontract is open to qualified vendors regardless of business size or ownership status. The organization responsible for the contract is Modoc County, operating under the state of California, and while no point of contact is listed, all inquiries or administrative processes should be directed through the provided UI link. The scope is strictly limited to fiber optic cable deployment activities within existing pathways, with no new conduit installation or roadwork included.
Modoc County

POSTED

3 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS