Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

Control Systems Replacement - Facility 316, Vance AFB

Active
FP1024447Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

ASRC Federal Gulf State Constructors, LLC, acting as the prime contractor for the Department of Defense, is soliciting firm-fixed-price quotes for the replacement of the control system at Facility 316, Vance Air Force Base, Oklahoma. This procurement involves replacing the existing R7044 control system with Honeywell BACnet Comfort Point Open controllers, integrating these with the current Honeywell EBI/EMCS system, and providing all necessary labor, equipment, wiring, and digital controls as outlined in the provided Statement of Work. The solicitation follows FAR 12.6 and FAR Part 13 guidelines and is the sole request for quotes, with no separate written solicitation to be issued. Funding for this project is not currently available, and no award will be granted until funds are secured; the government or AFGSC may cancel the solicitation at any time without obligation to reimburse offerors. Quotes must be valid for 90 days following the closing date of July 13, 2026, by 11:00 AM CST, which is also the submission deadline. Bids must be submitted via email in accordance with the bid form provided, and late submissions will not be accepted. Evaluation will be based on lowest price technically acceptable criteria. Vendors must be registered and active in the System for Award Management at the time of submission. Additional details include a mandatory Q&A process with a deadline for inquiries by June 29, 2026, a yet-to-be-scheduled site visit, and attachments such as wage determinations, terms and conditions, and certifications to support proposal preparation. The primary point of contact is Betty S. Kliewer.

General Info

ASRC seeks firm-fixed-price quotes to replace Facility 316 control system at Vance AFB by July 13, 2026.

Agency

Department Of Defense → FA3029 71 Ftw Cvc

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Enid, OK, 73705, USA

Set-Aside

NONE

Documents

(5)

Annual Commercial Products & Services Representations and Certifications PR-TMP-01 Rev 10.0

DOCXrepresentations-and-certifications

FP1024447 Statement of Work for Control Systems Replacement at Vance AFB

PDFsow

Wage Determination No. 2015-5857 Rev 18 12-3-25 Oklahoma Garfield County

PDFwage-determination

PR-TMP-11 General Provisions and FAR Flowdown Provisions for Commercial Items Rev 9.2

PDFgeneral-provisions

Question and Answer Document

XLSXq-and-a

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseCombined Synopsis
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3029 71 Ftw Cvc
Contacts1 person available
OfficeENID, OK, 73705-5037, USA
Organization / Agency
Department Of Defense → FA3029 71 Ftw Cvc
Office AddressENID, OK, 73705-5037, USA
Contacts

Full Description

Show more

ADMENDMENT #1: SiteVisit Update:


The purpose of this admendment #1 is to add site visit details for 6/17/26 at 2:00 PM CST.  All attendees MUST have a REAL ID or passport.  A list of names will need to be sent to Betty Kliewer; betty.kliewer.ctr@us.af.mil and Shannon Perry; shannon.perry.1.ctr@us.af.mil 48 hours prior to site visit.  Further instructions will be given in a returned email.


This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12.6 and FAR Part 13. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.


ASRC Federal Gulf State Constructors, LLC (AFGSC) the Prime Contractor acting on behalf of the Government, is soliciting firm-fixed-price (FFP) quotes to Replacement of Control System located in Facility 316 at Vance AFB, Oklahoma.  Work shall be performed in accordance with the attached Statement of Work (SOW).


Funding Notice:


Funds are not presently available for this requirement.  No award will be made until funds are available.  AFGSC and/or the Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals.  In the event AFGSC or the Government cancels this solicitation, neither AFGSC nor the Government has any obligation to reimburse any offeror for any costs.


Important Notice to Offerors:


It is the sole responsibility of all offerors to frequently check this posting for updates, amendments, Q&A responses, or changes.  Failure to acknowledge and comply with posted amendments may result in a quote being deemed non-responsive.


Quote Validity:


Quotes must remain valid for 90 days after the solicitation close date of July 13, 2026.  This extended timeframe will provide the Government with the strongest opportunity to secure the necessary funding and ensure continuity in the procurement process.


Bid Requirements:


The completed bid form in the attached SOW packet (Appendix B) must be emailed to Betty Kliewer; betty.kliewer.ctr@us.af.mil no later than July 13, 2026 at 11:00 AM CST.  No late offers will be considered or accepted after the deadline.  Bases for award will be Low Price/Technically Acceptable (LPTA).


Description:


The Contractor shall provide all supervision, labor, equipment, materials, and tools necessary to accomplish the repairs identified in the SOW.  Work includes but is not limited to:


•  Replace the existing R7044 Control system with new Honeywell BACnet Comfort Point Open (CPO) controllers.


•  Work includes integration with the existing Honeywell EBI/EMCS system.


•  Contractor must provide all required equipment, wiring, Direct Digital Control (DDC).


Site Visit:


A site visit will be scheduled for this project; however, the date and  time will be announced at a later date and access instructions will be posted via amendment to this notice.


Q&A:


A Question and Answer (Q&A) form is attached to this solicitation.  All vendor questions must be submitted using the form only.  Questions submitted in any other format will not be accepted.  The deadline for submitting questions is June 29, 2026 at the close of business (COB).


All vendors must be registered and active in the System for Award Management (SAM) at the time of quote submission.  Quotes submitted by vendors who are not active in SAM cannot be considered for award.


Attachments:


Statement of Work - Includes Drawings, Pictures, Bid Form


Wage Determination (current Davis-Bacon WD for the applicable county)


General Terms and Conditions


Representations and Certifications


Q&A For (must be used for all project questions)

Similar Contracts