Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from South Carolina was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Corrosion-Resistant Coatings and Finishes Application

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the application of protective, corrosion-resistant coatings to various metal components such as stairs, railings, doors, and windows. The primary objective is to enhance the durability and longevity of these elements, particularly in challenging high-salinity coastal environments where corrosion is a significant concern. The scope of work focuses on preventing rust and deterioration, ensuring the structural integrity and aesthetic quality of the metal surfaces over time. The contract is identified as a subcontract opportunity under the title "Corrosion-Resistant Coatings and Finishes Application," with the solicitation posted on May 27, 2026, and a response deadline of July 2, 2026. It falls under the NAICS code 332322, which pertains to steel fabricated structural metal manufacturing. The contracting agency is South Carolina's Land Preservation organization, though specific location details and contact information are not provided. This project emphasizes preserving infrastructure exposed to coastal conditions by applying specialized coatings to metal components.

General Info

Apply corrosion-resistant coatings to metal components for coastal durability, South Carolina subcontract.

Agency

South Carolina → Land PreservationView Agency

NAICS

332322 - Sheet Metal Work ManufacturingView NAICS

Place of Performance

SC, USA

Set-Aside

NONE

Documents

This scope was carved out of 070226.

The full solicitation package (22 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fort Fremont Stairs and Rails Design/Build

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Land Preservation
ContactsNo contacts available
OfficeN/A
Organization / Agency
South Carolina → Land Preservation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Apply protective, corrosion-resistant coatings to all metal components including stairs, railings, doors, and windows to ensure longevity in a high-salinity coastal environment.

More opportunities from South Carolina → Land Preservation

Same awarding agency

NAICS: 237990
SLED
Water Management Renovations at Pocotaligo Preserve - Phase II
Solicitation # 091726
Beaufort County's Land Preservation Department is soliciting proposals for Phase 2 of the water management renovations at Pocotaligo Preserve in Yemassee, South Carolina. This final phase of a multi-stage design-build process aims to improve water exchange and drainage within historic rice field impoundments to achieve specific habitat objectives. The scope of work includes installing corrugated aluminum pipes with flap gates, replacing rice trunks, raising and repairing dikes, installing flashboard risers, and excavating circulation canals. The contractor is responsible for providing all necessary equipment, materials, and manpower, and must adhere to strict environmental guidelines, including performing work during dry conditions to prevent rutting and ground disturbance. The contract requires the successful offeror to provide performance and payment bonds totaling 100 percent of the contract value and a one-year guarantee on all work. Proposals will be evaluated based on a points-based system weighing approach (30 percent), experience (30 percent), understanding of the project (25 percent), and cost (15 percent). Key requirements include the submission of three professional references from the past five years and compliance with Title VI nondiscrimination policies. The County has already secured the necessary Managed Tidal Impoundment General Permit from the U.S. Army Corps of Engineers, and the contractor must immediately halt work if any archaeological resources are discovered.
Other Heavy and Civil Engineering Construction

POSTED

26 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS