Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Corydon Well Replacement Project

Closed
C2305State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project site preparation involves clearing and grubbing of wooded areas, seeding, fine grading, and the implementation of a Stormwater Pollution Prevention Plan. Specialized contract requirements include the provision of railroad insurance and the implementation of geotechnical instrumentation and monitoring. The project also includes specific excavation tasks for depths exceeding 4 feet and 10 feet.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is divided into four primary components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system in accordance with the provided bid documents. Key deliverables include AC paving, the installation of pipes and fittings, traffic loops, and demolition, as well as specialized services such as jack and bore, cold planing, SWPPP, potholing, welding, and preconstruction video. This solicitation is specifically targeting certified HUBZone Small Businesses and Disadvantaged Business Enterprises, including DBE, MBE, SBE, WBE, SBRA, and LSAF partners. The response deadline for bids is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Corydon Well Replacement Project, solicitation number 20260728051, is a professional services agreement issued by the Elsinore Valley Municipal Water District (EVMWD) for the engineering, design, and construction management of the Corydon Well. The project involves integrating the well into the Backbasin Groundwater Blending and Treatment Schematic, which includes blending pipelines, flush-to-waste discharge, raw water supply pipelines, and future PFAS treatment additions. The scope is divided into two phases: the first focuses on technical specifications, site design, and drilling oversight, while the second covers detailed civil, architectural, mechanical, and electrical design and construction support. The total estimated project budget ranges from $2,055,262.00 to $2,260,788.00, with a performance period running from August 29, 2024, through September 30, 2027. Award selection is based on a trade-off process rather than the lowest price, evaluating relevant experience (25%), project approach (25%), schedule (20%), innovation (10%), cost (10%), and proposal quality (10%). The project is subject to stringent federal and state regulations, including 2 CFR Part 200, the Buy America Act, Cal/OSHA, and California Labor Code prevailing wage laws. Key requirements include active SAM registration, specific professional liability insurance of at least $2,000,000, and compliance with the Iran Contracting Act of 2010 for proposals exceeding $1 million. All invoicing must be processed through the Automated Standard Application for Payments (ASAP) system. Proposals are due by September 1, 2026, via the PlanetBids Vendor Portal.

General Info

Replace Corydon Well, integrate into Backbasin system, add PFAS treatment, connect nearby wells, construction 2026–2028.

Place of Performance

Lake Elsinore, CA, 92530, USA

Set-Aside

NONE

Documents

15
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first122 pages · rfp
High
PDF, Low priorityspecifications
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · exhibit
Low
PDF, Low priority1 page · other
Low
PDF, Low priorityother
Low
PPTX
PDF
PDF
PDF
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → EVMWD
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → EVMWD
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #C2305: The project involves the replacement of the Corydon Well and its integration into the EVMWD Backbasin Groundwater Blending and Treatment Schematic. This includes existing blending pipelines, future dual-purpose flush-to-waste discharge and raw water supply pipelines, and future PFAS treatment additions to the BBGWTP. The project is part of a planned design and construction phase from 2026–2028. The schematic shows connections to other wells (Cereal 1, 3, 4, Diamond, Summerly) and existing infrastructure.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS