Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Costa Mesa High School Theater Underground Waterproofing Project

Closed
20260916006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation MO2026-0007 is a request for bids from the Newport-Mesa Unified School District for a comprehensive water intrusion remediation project at the Costa Mesa High School Theater. The primary objective is to resolve persistent leaks in the main lobby and lower floor levels through a turnkey below-grade waterproofing system. Key technical requirements include the installation of approximately 75 linear feet of Tremproof 250GC cold fluid-applied membrane, excavation and shoring up to 6 feet deep, and the installation of drain boards and gravel barriers. The scope also encompasses the demolition and replacement of 60 linear feet of concrete sidewalk, the application of joint sealants and water-repellent treatments on masonry walls, and interior repairs such as replacing water-damaged VCT flooring and sealing concrete cracks. Additional site improvements include re-sloping planted areas, installing new surface drainage, and removing invasive bamboo to prevent future water intrusion. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price, which includes a 15,000 dollar allowance for unforeseen conditions. Bidders must be licensed contractors with current DIR registration and must submit their bids electronically via the PlanetBids portal by September 25, 2026. Required submissions include a bid guarantee of at least 10 percent of the total bid price, a non-collusion declaration, and recycled content certification. Successful contractors must provide faithful performance and labor and material payment bonds at 100 percent of the contract price. The project mandates strict adherence to Tremco manufacturer specifications, OSHA safety regulations, and California prevailing wage laws for Orange County. Payment will be issued through monthly progress payments with a percentage retained by the district.

General Info

Waterproofing and remediation project for Costa Mesa High School Theater via lowest responsive bid.

Place of Performance

Costa Mesa, CA, 92626, USA

Set-Aside

NONE

Documents

7
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Newport-Mesa Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #MO2026-0007: The project involves comprehensive water intrusion remediation at Costa Mesa High School Theater. Key work includes excavating and repairing the below-grade fluid-applied waterproofing membrane, integrating it with the under-slab vapor retarder, and reconfiguring the lower brick veneer. Interior work comprises removing and replacing water-damaged VCT flooring, installing a new moisture mitigation system, and sealing concrete cracks. Exterior sealant joints at storefront sills and vertical jambs will be removed and replaced. Significant drainage improvements are required, including re-sloping planted areas, installing new surface drainage, and potentially new trench drains along the building. Landscaping modifications, such as removing invasive bamboo and optimizing irrigation, are also recommended to prevent future water intrusion. The project aims to resolve persistent leaks in the main lobby and lower floor levels.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS