Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Covered Walkway Phase 2

Active
ITB AP 09-27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under solicitation ITB AP 09-27 for the Covered Walkway Phase 2 project at the Destin-Fort Walton Beach Airport. The scope of work includes the installation of canopy structures in Parking Lot B, slip-resistant coating for the main terminal, signage, and landscaping. Technical upgrades are also required, including PA/CCTV system rehabilitation, Wi-Fi booster node installation, and comprehensive electrical work involving specific conductor installations and lighting control cabinets. The project requires strict adherence to quality standards, including MPI painting specifications, NFPA 70 electrical codes, and ADA accessibility guidelines, with all safety signs and labels complying with ANSI Z535.4 and UL 969. The base bid scope has an anticipated completion time of 200 calendar days from the Notice to Proceed, though this may be extended if bid alternates are awarded. Contractors must provide bid, performance, and payment bonds, as well as significant insurance coverage, including 1 million dollars in general liability, 3 million dollars in professional liability, and 10 million dollars in umbrella insurance. Deliverables include final record drawings, O&M manuals, and commissioning certifications. The contract emphasizes compliance with Title VI of the Civil Rights Act of 1964 and requires that all materials be delivered to the site no more than six months prior to installation.

General Info

Okaloosa County seeks bids for covered walkways and technical upgrades at Destin-Fort Walton Airport.

Documents

5

Okaloosa County Covered Walkway Phase 2 Draft Agreement

DOCX, High priority: read this firstcontract-document
High

VPS Covered Walkway Phase 2 Technical Specifications

PDF, High priority: read this firstspecifications
High

Okaloosa County Board of County Commissioners - Bid Bond Template

PDF, Low prioritybid-bond
Low

Payment Bond - Covered Walkway Phase 2

PDF, Low prioritypayment-bond
Low

Performance Bond - Covered Walkway Phase 2

PDF, Low priorityperformance-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Airport
Contacts2 people available
OfficeCrestview, FL, 32531, USA
Organization / AgencyFlorida → Airport
Office AddressCrestview, FL, 32531, USA
Contacts
Chad RogersAirports Deputy Director
Erin HowzePurchasing Agent II

Interested Companies (8)

Joy Gordon ConstructionCANTONMENT, FL
Holley DevelopmnetBonifay, FL

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Board of County Commissioners of Okaloosa County, FL, are seeking bids for the "COVERED WALKWAY PHASE 2" project, at Destin-Fort Walton Beach Airport. The project can generally be described as: Installation of canopy structures in Parking Lot B, main terminal slip-resistant coating, signage, PA/CCTV upgrades, Wi-Fi booster nodes, rehabilitation of lighting and public announcement system, and landscaping. The anticipated completion time for the BASE BID scope of work is 200 calendar days to achieve Substantial Completion. If bid alternates are awarded, contract time will be extended per the construction and safety phasing plan. Exact time requirements are defined in the Issued for Bid Plans.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise requirements that expand upon State Water Resources Control Board standards. Central to this is the demonstration of six Good Faith Efforts (GFE). Specifically, proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be submitted with the bid package. Failure to provide these specific GFEs by the opening date will result in the bid being deemed non-responsive. Documentation regarding DBE outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of the existing Building 1272T engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract for multi-floor water damage restoration at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, with substantial completion expected within 90 days and final completion within an additional 15 days. This is an SBA set-aside solicitation open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Award will be based on best value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, with Massachusetts state laws prevailing if more stringent. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a two-year manufacturer warranty required for any roofing work. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The scope of work is extensive, covering demolition, abatement, structural steel, roofing, mechanical, electrical, and plumbing systems, as well as site work involving rock excavation and grading. Site improvements include the development of access roads, paved loading areas, and landscaping, with a specific requirement for wetland mitigation. Electrical infrastructure will consist of primary and secondary distribution systems, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB, with a response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses associated work for Buildings 261 and 263, with specific performance periods of 240 days for the base requirement and option. The overall period of performance is from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price, past performance from the last five years, and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security, safety, and accessibility standards, including ADA and seismic-resisting system requirements. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Florida → Airport

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS