Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 29, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cow Canyon Stewardship Project

Closed
AG-82X9-R-18-4001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 113310
New
SLED
F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement
Solicitation # RFP-Salmon-Creek-RM8-Fish-Log-Procurement_001-1.pdf
The Confederated Tribes of the Colville Reservation Anadromous Fisheries Division is soliciting proposals for a fixed-price contract to procure, haul, and deck fish logs to support salmon habitat restoration. The contractor is required to secure, load, transport, and stockpile 750 Douglas Fir or Western Larch logs, each at least 40 feet in length with a diameter at breast height of 18 to 24 inches. All materials must be of sound stock, free from rot, pests, or severe damage. Delivery must be completed at 696 Salmon Creek Road, near Okanogan, Washington, by July 1, 2026. Additionally, the contractor is responsible for performing site restoration and improving the access road to the staging area using approximately 2 to 4 dump truck loads of material. The performance period extends from the contract start date through September 30, 2027. Proposals are due by 3:00 p.m. PST on November 19, 2026. Award decisions are based on a criteria evaluation process prioritizing reliable and effective services within a reasonable budget, with a specific preference for responsible Indian Officers whose prices are within 10 percent of the lowest non-Indian offer. Selected contractors must enter into the Tribes standard form contract, which includes a no-assignment provision and requires either a 25 percent retainage or a performance bond, the latter of which is mandatory for contracts exceeding 100,000 dollars. All awards are subject to the Colville Tribe appropriation process and the availability of funds in the tribal treasury.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 113310
New
SLED
Longleaf Flatwoods Reserve, Alachua County, River Styx Timber Salvage
Solicitation # 42790
The St. Johns River Water Management District is soliciting sealed quotes for a per ton timber salvage operation to address an Ips beetle infestation within the Longleaf Flatwoods Reserve in Alachua County, Florida. The project covers approximately 36.1 acres in Section 9, Township 11 South, Range 21 East. The harvest is divided into a Primary area, designated for the clearcut of dead, dying, and green pine, and an Optional area where only dead pine may be harvested. Estimated volumes include 1,550 tons of saw-timber, 860 tons of pine pulpwood, and 126 tons of chip-n-saw, though these quantities are not guaranteed. Award will be based on the highest total quote amount. Operations must commence within 14 calendar days of contract execution, and the purchaser must meet with the District at least three business days before starting work. The logging crew supervisor must hold a current certification from an SFI-approved program, such as Florida's Master Logger. Requirements include strict adherence to Florida Department of Agriculture and Consumer Services silviculture best management practices and the maintenance of roads to their original condition. Insurance mandates include general liability of 1 million dollars per occurrence and 2 million dollars aggregate, with insurers rated A-:V or higher by A.M. Best. Payments are to be made weekly based on gross tonnage weight, accompanied by settlement summary sheets. Final acceptance is contingent upon a site inspection by the District Sale Manager to ensure the area is clear of rubbish and debris.
St. Johns River Water Management Dist

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 113310
New
SLED
16-2026BC04 (Through Eyes from the Spire) Timbersale
Solicitation # 162026BC04
The Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry is soliciting bids for a timber stumpage sale, identified as contract 16-2026BC04, for 37 acres located on River Road in Ward Township, Tioga County. The sale consists of an estimated 255.28 MBF of mostly black cherry sawtimber and 21.50 HCV of mixed hardwood pulp. The timber is FSC and SFI certified, and the award is based on the bidder's own estimates of merchantable volume and log quality, as the provided volumes are not guaranteed. Bids must be submitted electronically via Bid Express by 12:00 PM on December 9, 2026, and must include a 6,000 dollar bid guarantee in the form of a certified, cashier's, treasurer's, or official check, or a bank, postal, or express money order. Operational requirements include strict adherence to tree marking colors, where yellow or red paint indicates trees to be felled, while blue paint indicates reserved trees. All conifers are reserved and must not be felled. Logging operations are prohibited on cutting block 1 between March 15th and May 1st unless written authorization is granted. The buyer is required to meet with the managing forester one week prior to starting operations and must purchase, paint, and install one permanent special gate. Compliance with OSHA safety standards and Title 16 Pennsylvania Code, Chapter 49 non-discrimination regulations is mandatory. The successful bidder must execute the Department's Tree Estimate Timber Stumpage Sale Contract and maintain an E and S plan on site.
Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section

POSTED

1 day ago

DEADLINE

in about 2 months
NAICS: 113310
New
International
TA1695 - Cascadia-Shelter Bay South - CZ
Solicitation # TA1695
Timber Sale Licence TA1695 is a solicitation issued by the BC Timber Sales Branch of the Province of British Columbia for the harvesting of merchantable Crown timber in Block K6EA, located in the Cascadia-Shelter Bay South area of the Okanagan-Columbia Management Unit. The contract is a bonus offer, cruise-based award with a term of 12 months. Financial obligations include a total stumpage payment of 162,785.88 dollars based on estimated cruise volumes and a waste payment of 1,000 dollars. The project covers a land area of 20.1 hectares and involves species such as Cedar, Douglas-Fir, Hemlock, and Larch. Operational requirements include ground-based harvesting with soil disturbance limited to 10 percent of the net area. The licensee is responsible for the construction and subsequent rehabilitation of four temporary spur roads, adhering to specific culvert and safety specifications to manage steep slopes and rock fall. Compliance with the Forest Stewardship Plan, the Professional Governance Act, and SFI certification is mandatory. Additionally, the licensee must ensure road safety through BC Forest Safety Council certification and adhere to strict vehicle identification and registration requirements for industrial resource road use. Environmental protections are emphasized, including the management of Rank 5 Migratory Bird Habitat, riparian zones, and cultural heritage resources.
BC Timber Sales Branch

POSTED

5 days ago

DEADLINE

in 16 days

General Info

Contract Value

$608,768

NAICS

113310 - Logging

Place of Performance

San Juan National Forest, DOLORES, CO, 81323, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Cow_Canyon_-_AG-82X9-S-18-4001.docx

DOCX

Cow_Canyon_-_AG-82X9-S-18-4001_-_Revised_3-29-18.docx

DOCX

Cow_Canyon_-_AG-82X9-S-18-4001_-_Revised.docx

DOCX

Cow_Canyon_IRSC_Appendix_A.docx

DOCX

Cow_Canyon_IRSC_Appendix_B_Scaled.doc

DOC

Cow_Canyon_IRSC_Appendix_B_Scaled_-__Revised.doc

DOC

Cow_Canyon_IRSC_Appendix_C_Road_Maint.doc

DOC

Cow_Canyon_IRSC_Logging_Map.pdf

PDF

Cow_Canyon_IRSC_Vicinity_Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts2 people available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA
Contacts
David J CaseyContracting Officer's Representative

Full Description

Show more
Attached documents incorporate the following changes to the Solicitation and Appendix B: F. 2 Commencement, Prosecution, and Completion of Work The Contractor shall be required to (a) commence work under this contract in accordance with the accepted operation plan; starting work when the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire project including final cleanup of the premises by 02-01-2021. G.6.6 Current Operating Areas. Where logging, road construction, or other stewardship project work is in progress but not completed, unless agreed otherwise, Contractor shall, before operations cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion. Such protection shall be provided, prior to end of November for all disturbed, unprotected ground that is not to be disturbed further prior to end of operations each year, including roads and associated fills, tractor roads, skid trails, and fire lines. When weather permits operations during November 30th to April 30th Contractor shall keep such work on any additional disturbed areas as up to date as practicable

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS