Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on January 13, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CRAFT CONTROL CARD (CCC) ENGINEERING CHANGE ORDER (ECO) 1&2

Awarded
N6133117T0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Naval Surface Warfare Center, Panama City Division is seeking competitive quotes for the design, fabrication, testing, and delivery of fifty Landing Craft Air Cushion C4N Craft Control Card Modification Kits. These kits must implement Engineering Change Orders 1 and 2 and be produced according to specific government drawings and Gerber files. This requirement is a 100 percent small business set-aside under NAICS code 334418, with a Firm Fixed Price purchase order expected for the lowest priced technically acceptable offer. To be considered technically acceptable, offerors must possess the necessary equipment and instruments for fabrication and maintain a quality management system compliant with ISO 9001:2015. The final products must be delivered to the Naval Support Activity Panama City in Florida within 23 weeks of the order award. All interested parties should direct inquiries to the designated Contract Specialist, Stacy Figlinski.

General Info

Contract Value

$31,416.5

NAICS

334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing

Place of Performance

110 Vernon Avenue, PANAMA CITY, FL, 32407, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Nov 29, 2016 to Dec 3, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Dec 3, 2016 to Dec 7, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Dec 7, 2016 to Dec 9, 2016. The notice description changed.

Notice updated

Response deadline changed from Dec 9, 2016 to Dec 16, 2016. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Naval Surface Warfare Center
Contacts1 person available
OfficePANAMA CITY BEACH, FL, 32407-7001, USA
Office AddressPANAMA CITY BEACH, FL, 32407-7001, USA

Full Description

Show more
The Naval Surface Warfare Center, Panama City Division (NSWC PCD) is soliciting competitive quotes for design (non-recurring engineering), fabrication, test, and delivery of fifty (50) each Landing Craft Air Cushion (LCAC) C4N Craft Control Card Modification Kits implementing Engineering Change Orders 1 and 2. The kits are to be fabricated and tested in accordance with Government drawings and Gerber files. The drawings are distribution limited to Department of Defense U.S. Contractors only. The requirement is 100% set-aside for small business. A Firm Fixed Price type purchase order is anticipated. Award will be made to the lowest priced technically acceptable offer. Technical acceptability will be based on the offeror having the types of equipment and instruments to fabricate the items and a quality management system that meets the requirements of ISO 9001:2015. Delivery will be made to the Naval Support Activity Panama City, Receiving Officer, Building 100, 101 Vernon Avenue, Panama City Beach, FL 32407-7001 within 23 weeks after award of the order. The North American Industry Classification System (NAICS) Code is 334418 and the size standard is 500 employees. FSC is 5998. Any questions relating to this announcement are due 3 business days from the date this notice is published. Interested parties may submit comments or requests in writing to the Contract Specialist: Stacy Figlinski at email contact@example.gov. This notice includes a Statement of Work, CDRL, and Drawings.

More opportunities from Department Of Defense → Naval Surface Warfare Center

Same awarding agency

NAICS: 334513
New
Federal
Small Business Set Aside for Sierra Instruments Brand Mass Flow Controller per attachments
Solicitation # N61331-27-Q-KS02
The Naval Surface Warfare Center, Panama City Division, is soliciting quotes for a firm fixed price purchase order to acquire Sierra Instruments Series 100 Smart-Trak2 Mass Flow Controllers (Part number: C100L-DD-2-OV1-SV1-PV2-V1-S4). This procurement is a total Small Business Set-Aside under NAICS code 334513. The hardware is intended for integration with hyperbaric chamber systems to support the evaluation and certification of diver's life support equipment. All units must be delivered with certificates of conformance and standard calibration certificates, as only successfully calibrated articles are qualified for acceptance. Quotes must be submitted on company letterhead with full specifications, CAGE code, and lead time to Kaitlin Summerville by November 4, 2026, at 11:00 AM Central Time. Award will be based on the best value to the government, considering price, delivery, quality, and past performance, with a specific focus on the lowest price for the required brand name product. Delivery is to the Navy Experimental Diving Unit in Panama City, Florida, between 0900 and 1430 on weekdays. Invoicing must be processed through the Wide Area Workflow (WAWF) system with payment terms set at NET 30 days.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 17 hours ago

DEADLINE

in 6 days
View Details
NAICS: 332710
New
Federal
Full and Open Opportunity for MK68 Spare and Repair Parts Fabrication IAW the attached NAVSEA Drawing, SOW, and ALL additional attachments. Provide your Cage Code on the Quote and Submit the Cost Breakdown Spreadsheet.
Solicitation # N61331-27-Q-JC03
The Naval Surface Warfare Center Panama City Division is soliciting bids for the acquisition and fabrication of spare and repair parts for the MK68 System under solicitation N61331-27-Q-JC03. The scope of work requires the contractor to provide all necessary materials, facilities, and personnel to fabricate and assemble specific components, including six Housing Control Underwater Mine EX 1 MOD 0 assemblies, four MK 68 MOD 1 Thermal Battery Connector Assemblies, and four end caps. All fabrication must strictly adhere to provided NAVSEA drawings and technical standards, including ASME and ASTM specifications. The period of performance extends from the date of award until 180 days thereafter, with final delivery required at the NSWC PCD facility in Panama City, Florida. Award will be based on the best value to the government, evaluating price, delivery, quality, and past performance via the Supplier Performance Risk System. Prospective vendors must submit a quote package that includes their CAGE code and a completed cost breakdown spreadsheet. Mandatory requirements include the ability to invoice through the Wide Area Workflow system and compliance with strict packaging and marking standards, such as MIL-STD-129 and MIL-STD-1686 for electrostatic discharge control. Security protocols are emphasized, requiring the protection of critical information and the destruction of unclassified limited documents to prevent unauthorized disclosure.
Machine Shops

POSTED

about 17 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS