Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Creek Bridge Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332312
New
SLED
Main Line Guardrail IFB
Solicitation # 0000039836
The Department of General Services, Procurement Division is soliciting bids through solicitation 0000039836 to establish a statewide contract for Main Line Guardrail parts, specifically for the Midwest Guardrail System. The contract is mandatory for the California Department of Transportation and available to other state departments. The initial term is two years with three optional one-year extensions. Award will be made by group to the responsive and responsible bidder offering the lowest cost, provided they bid all line items within a group and meet all technical specifications. The scope includes the supply of guardrail elements, posts, blocks, and hardware, such as button head oval shoulder bolts and recessed hex nuts, adhering to specific California Standard Plans and AWS D1.1 welding standards. Bidders must submit a pricing workbook in Excel format, a narrative response including a distribution plan, and a technical questionnaire. Key requirements include providing FHWA Eligibility Letters for plastic blocks and maintaining insurance per Non-IT General Provisions. The solicitation offers a 5 percent bid preference for certified small businesses and incentives for Disabled Veteran Business Enterprise participation, though the minimum DVBE percentage has been waived. All products are offered F.O.B. destination, with the contractor retaining liability until final inspection and acceptance at the receiving point. Invoices must be submitted within seven calendar days of delivery, and bidders must specify their acceptance of CAL-Card Visa payments.
DGS - Statewide Procurement

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This subcontract opportunity with the City of Sugar Hill, Georgia, involves the supply and installation of a creek crossing bridge measuring between 25 and 35 feet. The selected contractor will be responsible for the entire construction process, including the installation of piers and abutments for the foundation, the fabrication of the bridge structure, and the use of cranes to set structural components made of steel, timber, or composite materials. To qualify for this project, contractors must possess specialized bridge construction experience and provide structural engineering certification to ensure a fully operational delivery. Interested parties must submit their responses by September 24, 2026, in accordance with the solicitation posted on August 20, 2026.

General Info

City of Sugar Hill seeks certified contractors to install a creek crossing bridge.

Documents

This scope was carved out of 25-017.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP #25-017 Riverlands Hike Bike Trail

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Sugar Hill
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Sugar Hill
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a 25-35 foot creek crossing bridge for prime contractors on City of Sugar Hill, Georgia projects. Performs bridge foundation installation including piers and abutments, fabricates the bridge structure, and utilizes cranes for hoisting and setting structural timber, steel, or composite components. Requires structural engineering certification and specialized bridge construction experience. Delivers a fully operational creek crossing bridge.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS