Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on May 30, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CRLA FRP Trail Bridges

Awarded
140P8419Q0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation 140P8419Q0043 is a request for quotation reserved for small businesses for the design, engineering, fabrication, and delivery of four fiber-reinforced polymer FRP pedestrian trail bridges for Crater Lake National Park. The bridges are specified at a width of 5 feet with lengths of 15, 16, 18, and 21 feet. To maintain the aesthetic of a historic district, the bridges must be green and designed to accommodate two false timber stringers on each side to mimic the appearance of multiple log stringer trail bridges. All components must be no longer than 25 feet and weigh less than 200 pounds to facilitate transport and assembly at the maintenance yard in Crater Lake, Oregon. The project requires a Licensed Professional Engineer to ensure the structures meet specific live, snow, and wind load requirements in accordance with AASHTO LRFD Guide Specifications. Materials must consist of high-strength E-glass and isophthalic polyester resin with treated Yellow Pine decking and galvanized steel hardware. The period of performance is from June 6, 2019, to October 4, 2019, with shop drawings due within 30 days of award and final delivery within 120 days. Award is based on the lowest evaluated price from responsible offerors who meet technical and past performance standards, including a minimum of five years of experience in bridge fabrication. Payments are processed electronically via the Invoice Processing Platform.

General Info

Contract Value

$42,820

NAICS

326199 - All Other Plastics Product Manufacturing

Place of Performance

Crater Lake National Park, CRATER LAKE, OR, 97604, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Attachment - False Stringer Details (RFQ 140P8419Q0043)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts
Jack NorthcuttContracting Officer

Full Description

Show more
The purpose of this amendment is to provide additional details concerning the false stringers (not in contract) described in the section GENERAL FEATURES AND DESIGN. Please see the attachment "False Stringer Details" This is a combined synopsis/solicitation for the design, fabrication, and delivery fiber-reinforced polymer (FRP) Pedestrian Trail Bridges, commercial items, prepared in accordance with Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and incorporates provisions and clauses that are in effect through Federal Acquisition Circular 2019-01 of December 20, 2018. Quotations are being requested via this notice only. A written solicitation will not be issued. The solicitation number is 140P8419Q0043 and the solicitation is issued as a request for quotation (RFQ). The acquisition is reserved exclusively for small business concerns. The North American Standard Industrial Classifications System Code is 326199 and the size standard is 750 employees. DESCRIPTION: Design, engineer, fabricate, and deliver trail bridges in accordance with the attached specifications. The components shall be no longer than 25 feet, to allow transportation to and re-assembly at the site. See Attachment 1 for a complete description of the requirement. Bridge 1: 15 ft L x 5 ft W Bridge 2: 16 ft L x 5 ft W Bridge 3: 18 ft L x 5 ft W Bridge 4: 21 ft L x 5 ft W DELIVERY: Crater Lake National Park, Hwy 62 Maintenance Yard, Crater Lake, OR 97604. The GPS coordinates are 42'53'44.1"N 122'08'12.4"W. PERIOD OF PERFORMANCE: June 6, 2019 - October 4, 2019 PAYMENT: The vendor must submit invoices via the IPP payment system. Payment will be made by electronic funds transfer generated by the US Treasury. TERMS AND CONDITIONS: TERMS AND CONDITIONS: The following FAR provisions and clauses apply: 52.204-7, System for Award Management 52.204-13, System for Award Management Maintenance 52.204-16, Commercial and Government Entity Code Reporting 52.204-18, Commercial and Government Entity Code Maintenance 52.204-19, Incorporation by Reference of Representations and Certifications 52.212-1, Instructions to Offerors -- Commercial Items; 52.212-3, Offer Representations and Certifications -- Commercial Items (to be completed and provided with quotation unless "Certs & Reps" section of the contractor's www.sam.gov record is completed in full) 52.212-4, Contract Terms and Conditions -- Commercial Items 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (within 52.212-5, applicable clauses are the following) 52.219-6, Notice of Total Small Business Set-Aside 52.219-13, Notice of Set-Aside of Orders 52.219-28, Post Award Small Business Program Rerepresentation 52.222-3, Convict Labor 52.222-19, Child Labor-Cooperation with Authorities and Remedies 52.222-21, Prohibition of Segregated Facilities 52.222-26, Equal Opportunity 52.222-36, Equal Opportunity for Workers with Disabilities 52.222-50, Combating Trafficking in Persons 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving 52.225-1, Buy American--Supplies 52.225-13, Restrictions on Certain Foreign Purchases 52.232-33, Payment by Electronic Funds Transfer-System for Award Management 52.217-4, Evaluation of Options Exercised at Time of Contract Award 52.232-39, Unenforceability of Unauthorized Obligations 52.232-40, Providing Accelerated Payments to Small Business Subcontractors 52.242-15, Stop-Work Order 52.247-34, F.O.B. Destination Full text versions of all FAR references and clauses are available at https://www.acquisition.gov/far/. Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Apr 2013) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: VENDOR'S ITEMIZED INVOICE. Failure to attach the required documentation as specified above will result in the IPP invoice being rejected. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email contact@example.gov or phone +1 (555) 000-0000. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation. INSTRUCTIONS TO OFFERORS: Quotations are due May 17, 2019 at 4:00 PM, PT to the attention of: Jack Northcutt, Contracting Officer, Crater Lake National Park at email: contact@example.gov EVALUATION FACTORS FOR AWARD: The Government will award a contract resulting from this Solicitation to the responsible offeror whose offer conforming to the Solicitation will be most advantageous to the Government, on the basis of the lowest evaluated price of quotations meeting or exceeding the acceptability standards. All non-cost factors will be evaluated on a pass/fail basis. The following non-cost factors shall establish the requirements of acceptability: 1. Technical capability of the firm to complete the work, as evidenced by: A. Providing a list of jobs of similar nature/scope performed within the last three years (Use Attachment 2 - Experience & Past Performance Form) and B. A very brief description of your proposed FRP bridges that demonstrates an understanding of the requirement. (Use the Description field of the attached Quote Sheet -Attachment 3) 2. Past performance (an offeror's or contractor's performance on active and physically completed contracts) as evidenced by providing current contact information for the list of jobs (Use Attachment 2 - Experience & Past Performance Form) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. THE POINT OF CONTACT FOR THIS SOLICITATION IS: Jack Northcutt, Contracting Officer, Crater Lake National Park, telephone: +1 (555) 000-0000; email: contact@example.gov Quotation Package (What to Submit) One original shall be submitted and shall include the following: 1. Completed Quote Sheet (Attachment 3) 2. Acknowledgement of Amendments: Acknowledge all RFQ amendments (if any are posted) using one of the methods set forth in Block 11 of the amendment, Standard Form 30. 3. Completed Experience & Past Performance Form (Attachment 2) 4. To be eligible for award, Offerors must have an active SAM record at http://www.sam.gov at the time of award, including the completed "Reps & Certs" section within their online active SAM record. 5. Email quotes to the attention of: contact@example.gov. Quotes will only be accepted through electronic mail. Documents required by this solicitation must be uploaded and received in their entirety no later than the closing date and time of this solicitation. NOTE: It is the responsibility of the contractor to verify that any emailed quotes have been delivered/received by the Contracting Officer listed above on or before the closing date/time of the RFQ. If you have any questions, please contact the Contracting Officer by May 14. Please do not send quotations to, or contact, the default contracting office in Denver, CO. The correct contracting office address is: NPS PORE MABO, POINT REYES NATIONAL SEASHORE, 1 BEAR VALLEY ROAD, POINT REYES STATION CA 94965-9703 RFQ No. 140P8419Q0043 ATTACHMENT 1 SPECIFICATIONS Fiber Reinforced Polymer (FRP) Trail Bridges for Crater Lake National Park GENERAL Scope - Bridge specifications are for fully engineered clear span bridges of Fiber Reinforced Polymer (FRP) composite construction and shall be regarded as minimum standards for design and construction. GENERAL FEATURES OF DESIGN Bridge spans will be as follows (straight-line dimension) and be measured from each end of the bridge structure. Width of all bridges shall be measured from the inside face of the structural elements at deck level. 1 each at 21' 0"L x 5'0"W 1 each at 18' 0"L x 5'0"W 1 each at 15' 0"L x 5'0"W 1 each at 16' 0"L x 5'0"W Bridges must be designed as FRP Composite I-Beam Spans All members shall be constructed from Pultruded FRP composite profiles and structural shapes as required. All bridges must allow for the inclusion of two false timber stringers on the outside of each bridge to hide the main structural stringers. 10" on each side of each bridge. Camber - Bridge will be pre-cambered to eliminate initial dead load deflection. Field Assembly - assembly must be possible with only standard hand tools. Installation can be completed with scaffolding, jacks, and/or overhead rigging if required. Small Transportable Components - Maximum weight of components should be less than 200 lbs. The longest piece will be 25 feet. ENGINEERING Structural design of the bridge structures shall be performed by or under the direct supervision of a Licensed Professional Engineer and completed in accordance with recognized engineering practices and principles. Bridge will be designed for a uniform live load of 90 psf and a snow load of 150 psf. Bridges will be designed for a minimum wind load of 25psf. Seismic loads will be determined according to the criteria specified in the standard building codes (IBC, ASCE, or UBC). Design in accordance with AASHTO's LRFD Guide Specifications for the Design of Pedestrian Bridges. Design shall utilize a simply supported FRP I-beam system (minimum of three beams) sufficient to carry loads, support decking, and to allow for the attachment of a park-installed post and handrail systems. MATERIALS FRP Composites FRP bridges shall be fabricated from high-strength E-glass and isophthalic polyester resin. Wood Decking shall be No 2 Yellow Pine (or equivalent) treated according to the American Wood Preservers Bureau. Standard 3 in x 12 inch planks will be provided, pre-drilled for final assembly. Hardware shall be A307 hot dipped galvanized steel. Railings: No railings. Standard curbing on both sides of each bridge. Color: All FRP materials will be green in color. SUBMITTALS Shop drawings for each bridge structure for review and acceptance. Provide design criteria, component dimensions, layout, and PE stamp. Shop drawing for details of minimum bearing area of concrete stem wall with anchorage details. Shop drawings showing locations for attaching decking and posts and with recommended size and type of fasteners. Step-by-step written instructions. Include photos of completed factory assembled structures prior to disassembly and shipment. Two sets of spare parts for each type of fastener or hardware. 15-year Manufacturer warranty for materials. Final as-built drawings. QUALITY CONTROL Manufacturer shall fabricate and assemble the bridge structures to verify assembly, component size/type and fit are accurate. Disassemble, itemize and label components, develop and include assembly instructions for delivery. SHIPPING AND DELIVERY Disassemble and ship all materials, fasteners, etc. to Crater Lake National Park, 1 Hwy 62 Maintenance Yard, Crater Lake, OR 97604. Schedule delivery to occur during the hours of operation, Monday through Friday from 7 am to 4:30 pm. SCHEDULE Submit shop drawings for review and acceptance within 30 days of award. All other deliverables within 120 days of award. ATTACHMENT 2 EXPERIENCE & PAST PERFORMANCE FORM RFQ No. 140P8419Q0043 Fiber Reinforced Polymer (FRP) Trail Bridges For Crater Lake National Park Qualified Suppliers - The bridge manufacturer shall have been in the business of design and fabrication of pre-fabricated bridges for a minimum of five years. Submit a list of at least three successful bridge projects in the last three years with location and contact information. Company Name: Company Address: Are you proposing to use a subcontractor? (yes/no) If yes, list name of subcontractor: PAST PERFORMANCE REFERENCES: Contact Name: Company/Agency Name: Address: Phone Number: Description of Project: Contact Name: Company/Agency Name: Address: Phone Number: Description of Project: Contact Name: Company/Agency Name: Address: Phone Number: Description of Project: RFQ No. 140P8419Q0043 ATTACHMENT 3 QUOTE SHEET Fiber Reinforced Polymer (FRP) Trail Bridges for Crater Lake National Park Company name: DUNS number: Contact name, phone number and e-mail: Acknowledgement of amendments (if any): Lead time: Brief Description of proposed bridges: Instructions: Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base and Option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government. Line Description Qty Unit Price Item 010 Bridge 1: 5 feet wide x 15 feet long 1 EA $________ 020 Bridge 2: 5 feet wide x 16 feet long 1 EA $________ 030 Option - Bridge 3: 5 feet wide x 18 feet long 1 EA $________ 040 Option - Bridge 4: 5 feet wide x 21 feet long 1 EA $________ Prices include design, fabrication, and delivery Email to: contact@example.gov NLT 4:00 PM (PT) May 17, 2019

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

about 23 hours ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS