This Solicitation opportunity from Nevada was posted on May 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves a comprehensive turn-key project to replace the fire alarm system in the Henderson B Building at the College of Southern Nevada. The project scope includes all necessary construction services, such as demolition, installation of new fire alarm equipment, and related electrical and mechanical work, with the goal of ensuring a fully operational and compliant fire alarm system. The contract is valued between 200,000 and 500,000 dollars and is scheduled to be completed within a specified timeframe, with detailed requirements for permits, safety, and coordination with the college’s construction management team.
Bidders are required to submit a detailed schedule of values, subcontractor lists, and various affidavits and insurance documentation within strict deadlines, particularly for the three lowest bidders. The procurement process emphasizes compliance with Nevada statutes regarding public works, including preference eligibility and subcontractor payment thresholds. The contract also stipulates bonding requirements to guarantee payment and performance, with sample bond forms provided. Additional documentation includes scope of work, safety protocols, and supplier lists, ensuring transparency and accountability throughout the bidding and construction phases. The project aims to deliver a fully functional fire alarm system that meets all regulatory standards within the designated timeline.
PDF, High priority: read this first1 page · bid-attachment
HighAI Summary for Bid Attachment 10 - List of Subcontractors 1% and Above: This document is Bid Attachment 10, titled 'List of Subcontractors 1% and Above.' It requires the prime contractor to list all subcontractors performing more than 1% of the total bid or paid amounts exceeding specified thresholds. The document outlines submission requirements within 2 hours after bid opening for the three lowest bidders, including subcontractor names, license numbers, and descriptions of work. It also includes instructions on labor or work portions performed by the prime contractor if not subcontracted. The attachment contains a table format for listing subcontractors and their details, along with definitions for business enterprise groups and ethnicities. This document is critical for compliance with Nevada Revised Statute 338.141 and bid responsiveness.
PDF
PDF, High priority: read this first2 pages · affidavit
HighAI Summary for Bid Attachment 11 Affidavit Pertaining to Preference Eligibility: This affidavit form is required for bidders to certify compliance with Nevada Revised Statutes 338.1389 and 338.0117 to be eligible for a bidding preference on a public works project. It must be submitted within two hours after bid opening. The affidavit affirms that at least 50% of workers and design professionals hold valid Nevada DMV licenses, vehicles are properly registered in Nevada, and payroll records will be maintained for inspection. It includes a section for notarization and proof of authorization for the signer to act on behalf of the business entity. Failure to comply with these requirements may result in penalties.
PDF
PDF, High priority: read this first2 pages · schedule-of-values
HighAI Summary for Bid Attachment 12 Schedule of Values: This document, titled 'Bid Attachment 12 Schedule of Values,' is submitted within 1 business day after the bid opening by the three lowest apparent bidders. It requires bidders to indicate amounts included in the base turnkey bid for various line items such as bonds, insurance, general conditions, demolition, concrete, masonry, structural steel, and many other construction-related categories. The document also specifies that costs related to profit, overhead, and incidental items should be evenly distributed across all line items. It serves as a detailed cost breakdown schedule for the bid submission process.
PDF
PDF, High priority: read this first1 page · bid-submittal-checklist
HighAI Summary for Bid Attachment 13 - Bid Submittal Checklist: This document, titled Bid Attachment 13 - Bid Submittal Checklist, outlines the required bid submittals for all bidders. It specifies documents to be submitted with the bid, including bid security and a 5% subcontractor list, as well as additional submittals required within specific timeframes after bid opening by the three apparent low bidders, such as a 1% subcontractor list, Public Works Bidders Preference Affidavit, and Schedule of Values. The checklist ensures compliance with bid submission requirements.
PDF
PDF, High priority: read this firstchange-order-form
HighAI Summary for Bid Attachment 7 - Change Order Form: This document is a sample Change Order Form for the Nevada System of Higher Education on behalf of the College of Southern Nevada. It authorizes contractors to make changes to an existing contract, detailing items to be added, deducted, or unchanged, along with reasons and requested by information. The form includes fields for contract and project numbers, cost adjustments, time adjustments, and signatures for approval by the contractor, architect/engineer, and authorized officials. It serves as an official record for contract modifications, including cost and schedule impacts.
PDF
PDF, High priority: read this first2 pages · bid-attachment
HighAI Summary for Bid Attachment 8 List of Tier 2 Suppliers: This document is Bid Attachment 8, titled 'List of Tier 2 Suppliers,' associated with an Invitation for Bid (IFB) or Request for Proposal (RFP). It requires proposers to provide historical and anticipated commitments to Tier 2 Minority, Women, Disadvantaged Business Enterprises (MWDBE), and Local Business Enterprises (LBE) for the most recent and current fiscal years. The document includes sections for listing considered and utilized subcontractors or Tier 2 suppliers, detailing company names, federal tax IDs, business licenses, contact information, business status classifications (MBE, SBE, WBE, LBE, DVBE), and certification details. This attachment supports compliance with subcontracting and supplier diversity requirements during the contract life.
PDF
PDF, High priority: read this firstbid-attachment
HighAI Summary for Bid Attachment 9 - 5% Subcontractor List: This document is Bid Attachment 9, titled '5% List,' used in a bidding process. It requires the prime contractor to list all subcontractors exceeding 5% of the base bid amount, including their names, Nevada State Contractors' license numbers, business enterprise group classification, and ethnicity. The prime contractor must also include its own name and describe any work it will perform directly. The document includes sections for business enterprise information, ethnicity, bidder's preference, and contractor licensing details. It serves to ensure compliance with Nevada Revised Statute 338.141, prohibiting substitution of named subcontractors. The form requires signatures and dates from authorized representatives.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CSN Henderson Building B FA Replacement Plans and Specifications: This document contains the plans and specifications for the CSN Henderson Building B FA Replacement project located at 700 College Dr, Henderson, NV 89002. Prepared by Harris Consulting Engineers, the document serves as a project narrative and technical guide for the replacement work. It includes detailed engineering plans and specifications necessary for the execution of the project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for CSN Henderson Building B Fire Alarm System Replacement Scope of Work: This document is the Scope of Work for the replacement of the fire alarm system at Henderson Building B, College of Southern Nevada (CSN). It outlines the contractor's responsibilities including permits, resources, materials, licensing, supervision, and damage repair. The project is a turn-key replacement with a 45-day completion deadline and liquidated damages for delays. It details site use, coordination with CSN, safety, and cleanup requirements. The document references compliance with Nevada state codes and standards, deliverables such as schedules and permits, inspection protocols, and warranty obligations. The scope ensures contractor accountability and coordination with CSN's Facilities Management and Construction Manager.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 24-0884 Henderson B Building Fire Alarm Replacement: This document is the Invitation for Bid (IFB) No. 24-0884 issued by the Nevada System of Higher Education on behalf of the College of Southern Nevada for the Henderson B Building Fire Alarm Replacement project. It includes submission instructions, general terms and conditions, and bid attachments. The IFB was published on May 28, 2024, with bids due by June 25, 2024. The estimated project cost is $295,000. Mandatory site walk is scheduled for June 4, 2024. The document outlines bidder responsibilities, bid preparation, submission requirements, and compliance with Nevada Revised Statutes Chapter 338. It also details the bid bond requirement and the process for addenda and clarifications.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Attachment 5 Sample Insurance: This document is titled 'Bid Attachment 5' and contains a sample certificate of insurance. It appears to be an attachment related to a bid, providing an example of insurance documentation required or referenced in the procurement process.
PDF
PDF, Low priority2 pages · bond-sample
LowAI Summary for Bid Attachment 6 Payment and Performance Bond Sample: This document contains sample forms for a 100% Payment Bond and a 100% Performance Bond related to a contract with the College of Southern Nevada under the Nevada System of Higher Education. The Payment Bond ensures payment for materials, equipment, supplies, and labor used in the contracted work, while the Performance Bond guarantees the contractor's fulfillment of contract requirements. Both bonds include provisions for alterations or extensions of the contract and require signatures and notarization. The document is dated 2021 and serves as a template for bonding requirements in the bidding process.
PDF
PDF, Low priority36 pages · contract-document
LowAI Summary for Henderson B Building Fire Alarm Replacement Draft Contract: This document is a draft contract for the Henderson B Building Fire Alarm Replacement project at the College of Southern Nevada. It includes the Owner-Contractor Agreement, general conditions, and outlines responsibilities, contract amount, commencement and completion deadlines, and insurance and bonding requirements. The contract references IFB No. 24-0884 and details the terms for construction services to replace the fire alarm system. The document is dated around mid-2024 and includes signature blocks for the contractor and the Board of Regents of the Nevada System of Higher Education.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.