This Solicitation opportunity from Texas was posted on October 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris County is soliciting Competitive Sealed Proposals for the installation of an underground fire water loop and related improvements at the Fire Marshal Campus for the Office of the County Engineer, with an estimated budget of 4,000,000 dollars. The scope of work includes the installation of an NFPA 22 compliant storage tank, an NFPA 20 compliant fire pump house, an emergency generator, and associated electrical services. The project has a designated duration of 300 days, with modified working hours from 6:00 a.m. to 6:00 p.m. and a requirement to use Trimble Construct for electronic record keeping.
Award will be determined on a best-value trade-off basis, with pricing weighted at 50 percent, firm qualifications and local government experience at 25 percent, organization and methodology at 15 percent, and safety and fiscal capacity each at 5 percent. Bidders must provide a 5 percent bid bond or cashier's check, and the successful contractor must furnish a 100 percent performance and payment bond within ten days of the award. Compliance requirements include a 12.05 percent M/WBE utilization goal, adherence to a minimum wage floor of 21.65 dollars per hour, and strict compliance with Texas Workers' Compensation laws and prevailing wage rates. Additionally, contractors must meet rigorous safety standards, including disqualification for certain severe OSHA violations, and implement a Heat Awareness Plan for temperatures exceeding 90 degrees.
General Info
Harris County seeks proposals for a 4 million dollar fire water loop installation.
PDF, High priority: read this first7 pages · presolicitation
HighAI Summary for 19-Special Requirements Competitive Sealed Proposal Instructions: This document titled '19-Special Requirements' provides detailed vendor instructions and special requirements for responding to a Competitive Sealed Proposal (CSP) issued by Harris County. It outlines the format and organization of proposal submissions, including sections for transmittal letter, scope of services, pricing information, organizational qualifications, and miscellaneous provisions. The document specifies submission methods, content expectations for each section, bonding requirements, and reporting capabilities. It emphasizes compliance with Texas Government Code §2269 and states that contract award will be based on best value evaluation. The instructions supersede general requirements and are intended to guide vendors in preparing comprehensive and compliant proposals.
PDF
PDF, High priority: read this first18 pages · other
HighAI Summary for 2025 Building Construction Prevailing Wage Rates Instructions: This document, revised on 7/24/2025, provides instructions and compliance requirements for prevailing wage rates related to building construction projects under Harris County jurisdiction. It details payroll submittal procedures, including weekly certified payroll submissions via Harris County DEEO’s Labor Compliance Software, and mandates wage rate compliance with site posting and licensing requirements. The document outlines enforcement measures, including site visits by Contract Compliance Officers, wage discrepancy resolutions, and penalties under Texas Government Code Chapter 2258 for underpayment of workers. It emphasizes the proper use of apprentices and the necessity of maintaining accurate wage records.
PDF
PDF, High priority: read this first9 pages · mwbe-utilization-plan
HighAI Summary for 8-MWBE Utilization Plan Commitment Form Rev. 10/2024: This document is the Minority and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form, revised in October 2024. It is used by bidders to commit to M/WBE participation goals on a project, either meeting or documenting good faith efforts if goals are not met. The form includes sections for project identification, prime company information, utilization plan summary, and disclosure of M/WBE subcontractors. It requires certification details, percentages of participation, and contact information. The form becomes part of the contract and is reviewed for compliance with Harris County M/WBE policy.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - M/WBE Utilization Commitment and Plan: This document is Addendum No. 1, containing the Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and Utilization Plan for Harris County. It provides the required templates for bidders to certify their commitment to M/WBE goals, document good faith efforts if goals are not met, and list certified subcontractors including their NAICS/NIGP codes and certification agencies.
PDF
PDF, High priority: read this firstbid-guaranty-performance-bond
HighAI Summary for Bid Guaranty and Performance Bond Requirements for Harris County: This document outlines the bid guaranty and performance/payment bond requirements for bidders submitting bids to Harris County. It specifies that a guaranty must be submitted with each bid, either as a bid bond or a bank cashier's check for 5% of the bid amount. The successful bidder must provide a performance/payment bond within ten days after contract award, executed by an authorized surety company. The bond amount equals the contract payment amount unless otherwise stated. Failure to submit the required bond documents within ten days may render the award ineffective. Verification of bond validity is required before payments are made.
PDF
PDF, High priority: read this first7 pages · rfp
HighAI Summary for General Requirements for Proposals - Harris County RFP Instructions: This document outlines the General Requirements for Proposals applicable to all advertised requests for proposals by Harris County. It includes instructions on access to records, ACH vendor payment, addenda, assignment restrictions, award criteria emphasizing lowest and best offer, bond requirements, and certification obligations such as Form 1295 and debarment status. The document also details compliance with federal, state, and local laws, ethical business conduct, contract obligations including award and signing authority, contract renewals, and transition procedures. It serves as a comprehensive guide for vendors submitting proposals to Harris County, ensuring adherence to legal and procedural standards.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Harris County CSP - Vendor Instructions and Bond Requirements: This document provides detailed submission instructions for a Competitive Sealed Proposal (CSP) for Harris County. It outlines the required proposal structure across five sections: Transmittal Letter, Scope of Service, Pricing, Organizational Qualifications, and Miscellaneous. Key requirements include a 5% bid bond or cashier's check, a 100% performance/payment bond upon award, and specific documentation regarding safety records, quality assurance, and financial capacity.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County General Conditions for Roads, Bridges and Related Work: General Conditions and Special Provisions for building construction, roads, bridges, and related work for Harris County, dated August 4, 2025. The document outlines administrative requirements, payment terms, schedule and completion (including a 300-day project duration), change orders, and regulatory responsibilities. It specifically designates Trimble Construct as the electronic record keeping tool and modifies standard working hours to 6:00 a.m. to 6:00 p.m.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County General Conditions for Roads, Bridges and Related Work: Dated August 4, 2025, this document establishes the General Conditions and Special Provisions for building construction and related work for roads and bridges in Harris County. It includes a detailed table of contents covering payments, schedules, change orders, and regulatory requirements, as well as specific modifications regarding the use of Trimble Construct for record keeping, a 300-day construction period, and adjusted working hours (6:00 a.m. to 6:00 p.m.).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Prevailing Wage Rate Instructions and Schedule: This document outlines the prevailing wage rate instructions and payroll submittal requirements for Harris County projects. It details the mandatory weekly submission of certified payrolls via DEEO software, compliance monitoring by the Contract Compliance Officer, and penalties under Texas Government Code Chapter 2258 for underpayment. The document includes a detailed wage schedule specifying base rates, fringe benefits, and total wages for various worker classifications, including electricians, carpenters, and laborers.
PDF
PDF, High priority: read this first1 page · rfp
HighAI Summary for Installation of Underground Fire Water Loop - Harris County CSP: This document is a specification for a Harris County Competitive Sealed Proposal (CSP) seeking offers for the installation of an underground fire water loop and related improvements for the Office of the County Engineer (UPIN 24035MF33301). It includes details about a pre-proposal conference scheduled for November 12, 2025, instructions for submitting questions, and requirements for the Certificate of Interested Parties (Form 1295). The project requires the vendor to provide all personnel, labor, materials, equipment, and incidentals necessary for the installation. Pricing must be all-inclusive, covering all costs without separate line items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 25/0327 Addendum No. 1: Addendum No. 1 for Job No. 25/0327 regarding the Installation of Underground Fire Water Loop and Related Improvements for the Office of the County Engineer. Issued November 19, 2025, it includes a Q&A section clarifying lump sum bidding, tank procurement requirements, generator specifications, and the inclusion of the pre-manufactured pump house building.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Texas Workers' Compensation Coverage Requirements for Construction Contracts: This document outlines mandatory Texas Workers' Compensation Law provisions applicable to building or construction contracts. It defines key terms such as certificate of coverage and duration of the project, and details the contractor's obligations to provide and maintain workers' compensation coverage for all employees and subcontractors throughout the project duration. The document specifies requirements for certificates of coverage submission, extension, retention, and notification of changes. It also mandates posting notices at project sites and contractual obligations for subcontractors. Non-compliance constitutes a breach of contract with potential penalties. This notice ensures compliance with Texas Labor Code Section 401.011(44) and aims to prevent cost increases due to workers' compensation coverage issues.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UPIN #24035MF33301 - Fire Marshal Campus Fire Water Loop Drawings: Technical drawings and specifications dated May 2023 for the Harris County Office of the County Engineer. The project involves the installation of a new underground fire water loop, NFPA 22 compliant storage tank, NFPA 20 compliant fire pump house, emergency generator, and associated electrical services at the Fire Marshal's Campus. The document includes detailed scope of work, coordination requirements, and electrical load analysis.
PDF
PDF, High priority: read this firstsow
HighAI Summary for UPIN 24035MF33301 - Installation of Underground Fire Water Loop Specifications: Specifications and scope of work for a Harris County Competitive Sealed Proposal (CSP) regarding the installation of an underground fire water loop and related improvements for the Office of the County Engineer. Includes details on the pre-proposal conference (Nov 12, 2025), Form 1295 requirements, and the requirement for all-inclusive pricing on the BidTable.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Workers Compensation Insurance Requirements: This document outlines the mandatory Texas Workers' Compensation insurance requirements for building or construction contracts. It defines certificates of coverage, mandates that contractors and subcontractors maintain statutory coverage for the project duration, and specifies the submission and retention of insurance certificates to the governmental entity.
PDF
PDF, Low priority10 pages · other
LowAI Summary for 10-MWBE Trucking Procedure Compliance Packet: This document is the 10-MWBE Trucking Procedure Compliance Packet from the Department of Economic Equity and Opportunity, Rev. 0 dated February 2025. It outlines the requirements for Minority/Women Business Enterprise (M/WBE) trucking firms to ensure Commercially Useful Function (CUF) in contracts. Key points include M/WBE ownership and operation of trucks, exclusive use and control of leased trucks, subcontracting rules, and credit for transportation services. It also details required submittal documentation such as W-9, insurance, and proof of truck ownership. The document provides guidance on courtesy utilization plan reviews and contact information for the Harris County DEEO.
PDF
PDF, Low priority78 pages · other
LowAI Summary for 1302 Preston Plumbing Upgrades 2023 - Specifications and Notices: This document contains preparer's certification for specifications, special provisions, estimate and specification data related to the 1302 Preston (Annex 2) Plumbing Upgrades 2023 project and the Fire Marshal Campus Fire Water Loop project. It includes a scope of work detailing plumbing system replacements and fire water loop installation, general notices to contractors including compliance requirements, and environmental and storm water quality regulations. The document serves as a comprehensive guide for contractors on project requirements, specifications, and regulatory compliance as of the date 07/30/2025.
PDF
PDF, Low priority17 pages · other
LowAI Summary for 18-MWBE Goal Participation Information Packet: This document outlines Harris County's Minority and Women-Owned Business Enterprise (M/WBE) Goal Participation policy. It details the County's commitment to engaging diverse businesses and sets a goal percentage for M/WBE participation in procurement projects. The document explains the requirements for bidders to submit a Utilization Plan and supporting documentation, including certifications and Letters of Intent from M/WBE firms. It specifies accepted certifications and criteria for Significant Local Presence. The document also covers the use of trucking firms for goal credit and the counting of M/WBE participation in contract work, including self-performance, subcontracting, joint ventures, and expenditures for materials and supplies. The policy emphasizes good faith efforts and commercially useful functions for M/WBE subcontractors.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Bond and Bid Check Authorization Form: This document is the Bid Bond Confirmation and Bid Check Return Authorization Form for Harris County. It outlines the procedures for submitting a cashier's check in lieu of a bid bond through Bonfire, including physical drop-off instructions and requirements for the bid check amount and payee. The form includes sections for bid bond and cashier's check details, as well as bidder contact information. It also explains the conditions under which bid checks are retained or returned by the County Clerk or Office of the Purchasing Agent. The form authorizes Harris County to return bid checks via regular mail under specified conditions. The document is intended for use by bidders and county officials managing bid check processing.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Bond and Bid Check Authorization Form: This document is a Bid Bond Confirmation and Bid Check Return Authorization Form for Harris County. It outlines the procedures for submitting a cashier's check in lieu of a bid bond, including physical drop-off instructions and submission through Bonfire. The form requires bidder information, bid bond or cashier's check details, and authorizes Harris County to return bid checks under specified conditions. It also includes sections for county clerk or purchasing agent use. The form was last revised on 3/24/21.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Guaranty and Performance Bond Requirements - Harris County: This document outlines the bid guaranty and performance/payment bond requirements for bidders submitting bids to Harris County. It specifies that a guaranty must be submitted with each bid, either as an individual bid bond or a bank cashier's check for 5% of the bid amount. The successful bidder must furnish a performance and/or payment bond within ten days after contract award. The bond must be executed by an authorized surety company in Texas and equal the contract amount unless otherwise stated. Failure to submit the required bond documents timely may render the award ineffective. Verification of bond validity is required before payments are made.
PDF
PDF, Low priority1 page · bid-opening-summary
LowAI Summary for Bid Opening Summary Report 2025-11-24: An unofficial working report dated November 24, 2025, summarizing bid openings for various Harris County projects. It lists multiple solicitations (ITB, RFP, RFSQ, CSP) across departments such as the HC Toll Road Authority, Office of the County Engineer, and Flood Control District, including vendor names and their respective estimated contract values.
PDF
PDF, Low priorityacknowledgment
LowAI Summary for Competitive Sealed Proposal Acknowledgment: This document is a Competitive Sealed Proposal (CSP) Acknowledgment form. It requires a corporate officer, partner, or proprietor to certify that the proposal is made without collusion or fraud and that they understand and agree to abide by all conditions of the CSP. The form includes fields for project job number, project description, authorized signature, representative name, company details, and contact information. It is intended for use in the proposal submission process to affirm the integrity and accuracy of the proposal.
PDF
PDF, Low priority1 page · other
LowAI Summary for Competitive Sealed Proposal Acknowledgment for Harris County: This document is a Competitive Sealed Proposal (CSP) Acknowledgment form for Harris County. It requires a corporate officer, partner, or proprietor to certify that the proposal is made without collusion or fraud and that they understand and agree to abide by all conditions of the CSP. The form includes fields for project job number, project description, authorized signature, company information, and internal acceptance by the Harris County Judge. It serves as a formal acknowledgment of the proposal submission under the CSP process.
PDF
PDF, Low priority31 pages · other
LowAI Summary for FM Campus Water Loop Drawings and General Notes: This document contains detailed engineering drawings and general project notes for the FM Campus Water Loop project dated January 30, 2025. It includes scope of work for installation of a new underground fire water loop, fire hydrants, fire water storage tank, fire pump house, electrical service, and generator. The document outlines contractor responsibilities such as site investigation, work coordination, safety, disposal, submittals, and as-built drawings. It also includes a drawing list and general project notes for construction and permit purposes. The document is intended for use by contractors and Harris County officials for project execution and compliance.
PDF
PDF, Low priority15 pages · other
LowAI Summary for Harris County Contractor Safety Record Policy and Questionnaire: This document outlines the Harris County Contractor Safety Record Policy, adopted to ensure contractors prioritize worker health and safety. It includes findings on workplace injuries and costs, the policy's purpose, scope, applicability, and exemptions. The policy applies to contracts over specified values procured after March 1, 2023, with several contract types exempted. Definitions relevant to the policy are provided. Certification requirements mandate contractors and subcontractors to certify safety-related conditions, including OSHA violations and criminal convictions related to workplace incidents. The policy aims to improve project quality by reducing injury-related costs and enhancing productivity.
PDF
PDF, Low priority9 pages · other
LowAI Summary for Harris County Minimum Insurance Requirements Attachment: This document outlines the minimum insurance requirements for contractors working with Harris County. It specifies the types and minimum limits of insurance coverage required, including Workers' Compensation and Employer's Liability, Commercial General Liability, Business Automobile Liability, and Contractor's Pollution Liability. The document details coverage conditions, endorsements, and waivers of subrogation to protect County Indemnified Parties. It references specific ISO insurance forms and mandates coverage durations, such as maintaining Products-Completed Operations coverage for at least 5 years post substantial completion. The document serves as an attachment to the General Conditions of the contract, defining key terms and ensuring compliance with insurance standards for risk management.
PDF
PDF, Low priority6 pages · other
LowAI Summary for Harris County Minimum Wage Policy for Contract Workers: This document outlines the Harris County Minimum Wage Policy for Contract Workers, adopted by the Harris County Commissioners Court on June 4, 2024. It establishes a minimum wage floor of $21.65 per hour for workers on County contracts, adjusted annually based on the MIT Living Wage Calculator. The policy aims to improve work quality, safety, and productivity on County projects. It applies to contractors and subcontractors working on County property or projects, with specific exemptions including emergency contracts, contracts under $50,000, and certain professional services. The policy is effective for contracts solicited on or after July 1, 2025, and is administered by the Harris County Purchasing Department.
PDF
PDF, Low priority1 page · other
LowAI Summary for Heat Protection Safety Requirement CSP: This document outlines the Heat Protection Safety Requirement for workers, emphasizing safety measures for extreme heat, cold weather, and adverse weather conditions. It mandates inclusion of these provisions in the project Safety Plan, including a Heat Awareness Plan for temperatures over 90 degrees, with accommodations such as acclimatization, water, rest, and shade. Vendors agree to comply by signing the Competitive Sealed Proposal Acknowledgement.
PDF
PDF, Low priority1 page · certification-form
LowAI Summary for Tax Form / Debt / Residence Certification: Harris County tax form for advertised projects requiring bidder certification of taxpayer identification, business registration, property listing, county debt disclosure, and Texas resident/nonresident status under Government Code §2252.001 et seq. The form is intended to be completed by a bidder/proposer and supports procurement eligibility review.
LowAI Summary for Tax Residence Certification Form for Harris County Texas: This document is a Tax Residence Certification form used for advertised projects in Harris County, Texas. It collects taxpayer identification, company information, and business registration status in Texas. The form requires listing taxable property owned in Harris County, disclosure of any debts owed to Harris County, and certification of residency status according to Texas Government Code §2252.001. The form distinguishes between resident and nonresident bidders for governmental contracts. The version of the form is revised as of November 2009.