This Solicitation opportunity from Colorado was posted on May 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 2017-068P22 Bid Alternates - AVCF Utility Lines Replacement: Bid Alternates Form for the Colorado Department of Corrections project 2017-068P22 (Utility Water Lines Replacement at Arkansas Valley Correctional). The document provides a structured form for bidders to submit pricing for six additive alternates (including utilidor and piping work) and ten deductive alternates to modify the base bid.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2017-068P22 Direct Labor Burden Calculation - Arkansas Valley Correctional: A State of Colorado Office of the State Architect form (SBP-6.18 rev 8-2023) used to calculate direct labor burden for the Utility Water Lines Replacement project at Arkansas Valley Correctional. The document requires contractors and major subcontractors to list payroll taxes, insurance, and pension costs to establish a labor burden percentage for use in future Change Order Proposals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2017-068P22 Unit Pricing Form - AVCF Utility Lines Replacement: A unit pricing form for the Colorado Department of Corrections / Facility Management Services project 2017-068P22 regarding Utility Water Lines Replacement at Arkansas Valley Correctional. The document outlines specific unit price items (U1-U10) for precast concrete utilidor lids, concrete repairs, piping insulation replacement, and drywall work to be used for contract sum adjustments.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 2017-068P22 Utility Water Lines Replacement - Bid Form: This document is the official Bid Form (Appendix B, SBP-6.13 rev 7-2022) for the Utility Water Lines Replacement project at the Arkansas Valley Correctional Facility (Project No. 2017-068P22). It outlines the requirements for bid submission, including completion timelines, Colorado labor compliance (80% requirement), bid guarantees, and certification for Service-Disabled Veteran Owned Small Businesses. It serves as the primary instrument for bidders to propose labor, materials, and costs for the execution of the project.
PDF
PDF, High priority: read this firstconsent-to-search-form
HighAI Summary for CTS Consent to Search AR 300-27C Rev 011523: This document is the Consent to Search Authorization and Registration form (AR 300-27C) revised on January 15, 2023, used by the Colorado Department of Corrections. It outlines contraband items prohibited in DOC facilities, visitor search consent requirements, and penalties for violations. The form includes sections for guest data, vehicle data, and a declaration of consent and waiver, requiring visitors to agree to searches of their person, property, and vehicles as a condition of entry. The document is bilingual, providing the same information in English and Spanish.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB 2024000192 Addendum No. 1 - AVCF Utility Water Lines Replacement: Addendum No. 1 issued May 15, 2024, for the Arkansas Valley Correctional Facility Utility Water Lines Replacement (Project 2017-068P22). This document amends the original plans and specifications dated 02/29/24. It includes the pre-bid meeting attendance sign-in sheets from May 8, 2024, formal answers to six bidder questions regarding site conditions and specifications, and a 2011 geotechnical report from Terracon Consultants, Inc.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 2024000192 - Supplementary General Conditions (AVCF Utility Water Lines): Supplementary General Conditions (State Form SC-6.23A) for the Arkansas Valley Correctional Facility Utility Water Lines Replacement project (Project No. 2017-068P22 / IFB 2024000192). This document modifies standard general conditions regarding definitions, submission requirements (subcontractor lists, schedules of values, and CPM schedules), utility responsibilities, insurance exclusions, and final settlement disclosure requirements per C.R.S. § 24-103-210.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Project 2017-068P22: AVCF Utility Water Lines Replacement: Invitation for Bid (IFB) issued April 22, 2024, for the replacement of underground heating and chilled water utilities and water softener systems at the Arkansas Valley Correctional Facility. Estimated construction cost is $6.9M. The scope includes demolition, installation of mechanical equipment, and piping repairs. Bidders must meet minimum requirements regarding project experience (two projects >$7M) and bonding capacity. A mandatory pre-bid meeting was held May 8, 2024, with sealed bids due via Box.com by June 13, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 2017-068P22 - Bid Bond Form: This document is a Bid Bond template (Appendix B3) for the Utility Water Lines Replacement project at the Arkansas Valley Correctional Facility (Project No. 2017-068P22) for the Colorado Department of Corrections. It outlines the requirements for a bid guaranty of 5% of the total bid price and specifies that failure to provide a properly executed bond with a Power of Attorney will result in the proposal being deemed non-responsive.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Project 2017-068P22: Utility Water Lines Replacement - Information for Bidders: Appendix A providing instructions for bidders for the Utility Water Lines Replacement project at the Arkansas Valley Correctional Facility (Project No. 2017-068P22). It details bid submission requirements, a virtual bid opening on June 13, 2024, bid security requirements (5%), compliance with Colorado law regarding prevailing wages and embodied carbon emissions, and the method of award based on the lowest responsible bidder with additive/deductible alternates.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.21 Contractor's Agreement Design/Bid/Build (D/B/B): A template for a Design/Bid/Build (D/B/B) Contractor's Agreement (State Form SC-6.21) issued by the State of Colorado Office of the State Architect. The document outlines the legal agreement between the State and a contractor, including performance of work, time of completion, contract sum, and references to general conditions (SC-6.23) and various exhibits such as bonds and insurance.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23: General Conditions of the Contractor's Design/Bid/Build Agreement: This document establishes the General Conditions for Design/Bid/Build (D/B/B) agreements for the State of Colorado Office of the State Architect, State Buildings Program. It provides a comprehensive framework covering definitions, execution, insurance requirements, payment processes, change orders, dispute resolution, and termination procedures. The document serves as a standard legal template (State Form SC-6.23) governing the relationship and responsibilities between the State and the contractor.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Project 2017-068P22 Planholder Agreement - AVCF Utility Lines Replacement: A Planholder Agreement for the Arkansas Valley Correctional Facility Utility Water Lines Replacement project (Project No. 2017-068P22). The document prohibits the unauthorized reproduction of bid documents due to the sensitive nature of the project and outlines the requirements for maintaining and distributing document sets.