Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Culvert Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply and installation of a new culvert designed to facilitate proper water flow beneath roadways or embankments, with associated work including trenching, bedding, and comprehensive erosion control measures to ensure long-term structural integrity and environmental protection. This effort is critical for maintaining drainage functionality and preventing infrastructure damage due towater accumulation or runoff. The project falls under NAICS code 237110, indicating it is classified as a civil engineering construction activity focused on water and sewer line and related infrastructure. Issued as a subcontract by the Tuolumne Utilities District in California, the opportunity was posted on July 9, 2026, with no specific solicitation number provided. The place of performance and exact location details are not specified in the data, but the work is expected to occur within the district’s service area. There is no set-aside designation indicated, suggesting the subcontract is open to qualified bidders without special socioeconomic preferences. Access to additional project information is available through the provided link to the CEQA Net database, which may contain environmental or planning details relevant to the installation scope.

General Info

Supply and install culvert with trenching, bedding, and erosion control for drainage infrastructure in Tuolumne Utilities District.

Agency

California → Tuolumne Utilities District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of TUD Sierra Pines Regional Water Treatment Facility Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tuolumne Utilities District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Tuolumne Utilities District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of a new culvert to manage water flow under roadways or embankments, including trenching, bedding, and erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, involving the construction of raw water production wells, well heads, well pumps, discharge piping, and a surge bladder tank. It also includes site civil work, a wellhead cage, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, pretreatment and post-treatment chemical buildings, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. Additionally, the contractor must provide production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. The solicitation is categorized under NAICS code 237110. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final deadline for submissions is August 19, 2026, at 2:00 PM EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Bidding documents, including plans, specifications, and addenda, are available for free download via ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

1 day ago

DEADLINE

in about 14 hours
View Details