Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on May 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Culvert Replacement

Closed
052824State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Town of Pittsford is seeking bids for a culvert replacement project on Whipple Hollow Road TH#8, involving the installation of a squashed culvert with sediment retention baffles, as part of an upsizing effort. The project is partially funded through a VTrans “Better Roads” grant, and the necessary stream alteration permit is already secured, with the Town assisting in obtaining the wetlands permit from the State. The contractor will be responsible for all aspects of the project, including labor, materials, equipment, erosion and dust control, signage, traffic management, excavation, removal of the existing culvert, and installation of the new pipe with baffles. The work includes back-filling with specified dense grade materials, roadbed construction, and paving with asphalt, ensuring the final surface meets the required specifications. The culvert dimensions are 81 inches by 59 inches, with sediment retention baffles embedded 18 inches, and baffles spaced every 15 feet starting 5 feet from the inlet. All work must be completed by October 15, 2024, and both the work and materials are guaranteed for one year. The project budget ranges from $100,000 to $300,000, with the contractor responsible for hauling materials, constructing proper slopes, grading, seeding, mulching, and patching the road with specified asphalt mixes. The specifications emphasize the use of suitable existing materials for backfill, with particular attention to the installation of the sediment retention baffles and proper compaction. The project aims to enhance stream flow capacity and road stability, with the Town of Pittsford overseeing the process and providing a primary point of contact for inquiries.

General Info

Agency

Vermont → Town of Pittsford

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Town of Pittsford
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Town of Pittsford
Office AddressN/A
Contacts
David Atherton

Full Description

Show more
The Town of Pittsford is seeking bids for replacement of an existing road culvert with a squashed culvert with baffles installed. The culvert is located on Whipple Hollow Road TH#8. This is considered a culvert upsize project. This project will be partially funded by a VTrans “Better Roads” grant. The necessary stream alteration permit is already in hand and the Town will work with the Contractor to secure the needed wetlands permit from the State. Contractor is responsible for supplying all labor, materials, trucks, equipment, erosion control measures, dust control measures, signage, traffic control, excavation and removal of the existing culvert, purchase and installation of the new squashed pipe including the sediment retention baffles, back-filling and compaction in 12” inch lifts, using any suitable existing material and removing and disposing of any unsuitable material. For any additional materials needed for back filling and building the road bed, the Contractor will use State-specification material. Contractor will use 3 ½” inch minus dense grade material for back-filling first layers and 1 ½” inch minus material for last 12” inches of back-fill. Contractor will be responsible for hauling all material and road improvements such as finish grades, slopes, grass seed and mulch and patching road with a 3” inch asphalt base (3/4” mix) and a 1 ¼” topcoat (1/2” mix). The specifications for the squashed pipe are 81”x 59” squashed pipe with sediment retention baffles and embedded 18” with no infill of E-stone. The straight baffles need to be 1’ high at the center and evenly spaced every 15 feet, starting 5 feet from the inlet end of the pipe. Work must be completed before October 15, 2024. All work and materials will be guaranteed for one (1) year.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS