Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

CUNY Lehman College Tunnel Expansion Joints and Courtyards Waterproofing - Project No. 349310

Open
2140709State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dormitory Authority of the State of New York is seeking Expressions of Interest for a waterproofing and rehabilitation project at CUNY Lehman College, with an estimated cost range between $2.2 million and $2.8 million. The scope of work includes the removal and replacement of waterproofing membranes, flashings, and wearing surfaces at courtyards, as well as the excavation and installation of injection waterproofing on tunnel foundation walls and expansion joints. Additionally, the project involves replacing plaza drains and reinstalling guard rails and stone steps. All work is subject to a Project Labor Agreement approved by the Building and Construction Trades Department, AFL-CIO, and must meet specific workforce goals, including a 45% Minority and Women workforce goal and various M/WBE participation targets. This is a two-stage procurement process where firms must first submit a comprehensive EOI package in PDF format to be evaluated by a DASNY committee. Qualification is based on a scoring of ten specific tabs, including company profile, five years of similar project experience, sample schedules, safety programs, and anticipated workload. Non-scored requirements for qualification include a New York State Vendor Responsibility Questionnaire certified within the last five months, a three-year Experience Modification Rating, and proof of bonding capacity. Only firms deemed qualified through this EOI process will be short-listed and invited to submit a final bid based on finalized construction documents.

General Info

DASNY seeks expressions of interest for CUNY Lehman College waterproofing and rehabilitation.

Place of Performance

Lehman College, 250 Bedford Park Boulevard West, Bronx, New York 10468, NY, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfi
High
PDF, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDormitory Authority of the State of New York
Contacts2 people available
OfficeN/A

Full Description

Show more
THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. Removal and replacement of the existing waterproofing membrane, flashings, etc. at courtyards. Installation of new wearing surfaces at courtyards. Removal and replacement of masonry units for membrane flashing installation at courtyards. Removal and reinstallation of guard rails at courtyards. Replacement of existing plaza drains in kind, on existing roughing. Excavate soil, remove and replace existing waterproofing on tunnel foundation walls. Install injection waterproofing on tunnel foundation walls. Waterproof existing expansion joints at tunnel. Remove and reinstall existing stone steps. Estimated Cost Range: $2.2 million to $2.8 million Project Labor Agreement The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Project Manual Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to Sign up to see this detail. Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and Sign up to see this detail. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
ROOF MAINTENANCE SERVICES - IFB 27C535000
Solicitation # 27C535000
The Department of the California Highway Patrol is soliciting bids for annual roof maintenance and inspection services for the East Los Angeles Area office located in Monterey Park, California. The anticipated term of the agreement runs from July 1, 2027, through June 30, 2030. The scope of work requires annual inspections during the fall season, from October through December, encompassing debris removal from roof surfaces, gutters, and downspouts, as well as interior and exterior inspections for structural distress, water penetration, and membrane integrity. All work must be performed in a professional manner and conform to the Uniform Building Code, Uniform Plumbing Code, National Electric Code, and California Electric Safety Orders. The contract will be awarded to the responsive and responsible bidder offering the lowest cost, with specific incentives available for Disabled Veteran Business Enterprise (DVBE) and Nonprofit Veteran Service Agency (NVSA) participation. Bidders must possess a valid California Contractors State License Board C-39 Roofing License and provide proof of liability insurance. Submission requirements are strict, requiring a physical bid package delivered to Sacramento, bound with a single staple, and signed in ink. Contractors are also subject to security clearances and must adhere to prevailing wage laws and environmental regulations regarding the disposal of chemical residues and pesticides.
Department of the California Highway Patrol

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details
NAICS: 238160
New
SLED
ROOF MAINTENANCE SERVICES - IFB 26C565002
Solicitation # 26C565002
The Department of the California Highway Patrol is soliciting roof maintenance services for the West Los Angeles Area office, with an anticipated contract term from April 1, 2027, through March 31, 2030. A mandatory walk-through is scheduled for November 19, 2026, at 2:00 P.M. at the Culver City facility; failure to sign in at this event will disqualify a bidder from consideration. Bids must be submitted by December 10, 2026, via U.S. Mail, Overnight Express, or hand delivery to the Contract Services Unit in Sacramento. The award will be granted to the responsive and responsible bidder offering the lowest cost, after adjustments for Small Business and Disabled Veteran Business Enterprise (DVBE) incentives. While the DVBE participation requirement has been waived, bidders may still opt into the program to receive an incentive of 1% to 5% of the lowest responsive bid. Contractors must adhere to strict operational and legal standards, including the Uniform Building Code, Uniform Plumbing Code, National Electric Code, and California Electric Safety Orders. All materials used must be new, and the contractor is responsible for the proper disposal of chemical containers and wastewater in accordance with environmental laws. Personnel must undergo security clearance and comply with prevailing wage rates as determined by the Department of Industrial Relations. The bid package must be a single, stapled original containing all required certifications, signed in ink by an authorized representative, and labeled as IFB #26C565002. Final acceptance of all work is determined by the CHP Project Representative.
Department of the California Highway Patrol

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details
NAICS: 238160
New
SLED
47971 HVAC
Solicitation # 47971
Solicitation 47971, issued by the New York State OGS Design and Construction Group, seeks a contractor for construction, HVAC, and electrical work to replace the roof and associated mechanical systems at the Troop F Headquarters located at 55 Crystal Run Road in Middletown, New York. The scope of work includes the removal, disconnection, and secure offsite storage of rooftop units and accessories for later reinstallation, as well as the installation of facility natural-gas piping, tubes, fittings, and manual shutoff valves. The contractor is responsible for providing all necessary tools and equipment and must maintain a waterfit condition across all roof areas throughout the project duration. Technical requirements specify that natural-gas piping must be tested and purged according to NFPA 54 standards and that all HVAC piping and equipment must adhere to Section 230553 for identification. Specific material updates from project addenda include the use of 20oz continuous copper for expansion joint coping and updated specifications for roof overflow drains. Additionally, the contractor is responsible for the removal and resetting of furniture and portable equipment. Work may only commence upon written authorization from the owner, and the contractor must secure any additional permits required beyond the certificate of occupancy at their own expense.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 16 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Dormitory Authority of the State of New York

Same awarding agency

NAICS: 238210
New
SLED
CUNY College of Staten Island Buildings 1L, 1R, 6S, 2A LED Upgrade
Solicitation # 2140525
The Dormitory Authority of the State of New York (DASNY) is soliciting bids for LED lighting fixture upgrades at the College of Staten Island, specifically within Buildings 1L, 1R, 2A, and 6S. The scope of work includes the removal of existing fluorescent lamps and ballasts and the installation of new LED direct-wire lamps, while ensuring that existing emergency lighting is maintained. Certain lobby lighting in Building 1L will remain unchanged. The estimated cost for this project ranges from $3,200,000 to $3,700,000, with bids due by December 17, 2026. A critical condition of the contract is the requirement for the successful bidder and all subcontractors of every tier to execute a Project Labor Agreement (PLA). Bidders must possess at least five years of experience in similar work and provide a list of five comparable projects completed within the last ten years. Additionally, firms providing professional engineering services must hold a New York State Certificate of Authorization. The procurement includes specific socioeconomic goals, requiring 18% Minority Business Enterprise (MBE), 12% Women Business Enterprise (WBE), and 6% Service-Disabled Veteran-Owned Business (SDVOB) participation. Compliance with New York State business registration, EEO/AA insurance, and the NY State Vendor Responsibility Questionnaire is mandatory. All communications during the procurement process are restricted per State Finance Law sections 139-j and 139-k. Prospective bidders must obtain official contract documents, which include updated General Conditions for Construction dated February 4, 2026, through Camelot Print and Copy Centers to be recognized as official plan holders.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS