Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Curb and Gutter Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → City of GuytonView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Guyton
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Guyton
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of approximately 2,400 linear feet of 18” roll-over curb and gutter, including forming, pouring, finishing, and curing.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe contract involves comprehensive upgrades to a biffy facility to meet stringent safety and sanitation standards, including construction of a non-combustible, explosion-proof structure with integrated interior and exterior lighting, ventilation, space heating for freeze protection, and fire extinguishers. The facility will be outfitted with industrial-grade cameras and access doors for equipment, all designed to comply with NFPA 820 and FDA sanitization guidelines. Critical system redundancies will be added, including a duplicate backup pump system and an associated biffy tank with backflow prevention to ensure uninterrupted operation during equipment failure. Emergency safety features will be installed, featuring an emergency eyewash and shower station with tempered water. The project also includes full upgrades to the electrical and mechanical infrastructure, installation of channel drains, and enhancements to wet well cleaning systems to support long-term operational reliability and regulatory compliance. The facility improvements are being procured by the Port of Seattle under the Aviation Project Management Group, with the work classified under NAICS code 238110. The primary point of contact for inquiries is Jay Kim, reachable via email and phone, while Savita Rishiraj serves as the project manager for the contractor. The solicitation was posted on July 24, 2026, and is currently in forecast status with no set-aside designation. Performance location details are not specified, but the scope suggests the work is centered on existing infrastructure managed by the Port of Seattle. The technical requirements reflect a focus on safety, redundancy, hygiene, and operational continuity, indicating this is a high-priority infrastructure modernization effort.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details

More opportunities from Georgia → City of Guyton

Same awarding agency

NAICS: 237310
New
SLED
2024 Guyton CDBG (PE24102)Sealed bids for the 2024 Guyton CDBG project are due by 2:00 PM on August 19th, 2026, at the City of Guyton City Hall, where they will be publicly opened. Bids must remain firm for 60 days after the submission deadline and must include a bid bond or certified cashier’s check for at least 10% of the base bid amount. The scope of work includes comprehensive drainage improvements such as installing 18-inch roll-over curb and gutter, 192 linear feet of 30-inch storm pipe, 800 linear feet of 24-inch storm pipe, 1,080 linear feet of 18-inch storm pipe, and various sizes of storm pipe, along with headwalls, wingwalls, aprons, grate inlets, curb inlets, yard inlets, pavement replacement, and roadway overlay. The entire project must be completed within 150 calendar days. All contractors must hold a valid Georgia Utility Contractor license and employ a certified Utility Manager to oversee the work, as the project falls under the state’s definition of utility contracting. Detailed plans, specifications, and contract documents are available from Parker Engineering, LLC, located at 36 Courtland Street, Suite B, Statesboro, Georgia, for a fee of $150 per full-size set. Funding comes from the City of Guyton and the Community Development Block Grant program, and the contract is subject to Section 3 requirements encouraging participation by Section 3 business concerns. The project must comply with the Buy America provisions and E-Verify regulations. The City reserves the right to reject any or all bids and to waive minor irregularities in submissions.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details