Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CuSD Significant Defect Repair Project - Phase 3

Closed
46957State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract encompasses a comprehensive sanitary sewer rehabilitation project in Cupertino, California, involving 63 open-cut spot repairs at 44 locations totaling 672 linear feet, with replacement of existing 6-inch, 8-inch, 14-inch, and 15-inch pipes using new SDR26 PVC pipe. The work includes replacing 55 6”x4” wyes, eight 8”x4” wyes, and two 14”x4” wyes, with 22 of the spot repairs requiring reconnection with water-stop to existing manholes. In addition, nine pipe bursting segments at eight locations will replace 2,800 linear feet of existing pipe with new SDR17 HDPE pipe, each requiring a water-stop reconnection to a manhole. Two CIPP lining repairs are also required at one location. All work involves full excavation, trench safety and shoring, utility potholing, pavement removal and restoration including lane and crosswalk restriping, temporary bypass pumping, fence and paver reinstallation, concrete curb and gutter replacement, sidewalk restoration, tree and shrub removal and replanting, and irrigation line repairs. All work must adhere to the Contract Plans and Specifications, including the “Green Book” Standard Specifications for Public Works Construction – 2021 Edition, ASTM standards, and Caltrans standards. The project must be completed within 122 working days from the Notice to Proceed, with liquidated damages of $500 per day for delays. Bids are due by May 15, 2026, with an optional pre-bid conference scheduled for May 6, 2026. The contract is structured as a firm fixed price, with payment processed through the District’s Contract Management Information System and no federal invoicing platforms used. No explicit evaluation factors, socioeconomic set-asides, or corporate certifications are specified, though the contractor must provide proof of licensing, insurance naming the District as an additional insured, compliance with OSHA and California labor codes, and adherence to site safety protocols including lockout/tagout procedures and prohibition of firearms. All materials must meet manufacturer specifications and be properly stored and labeled, with no barcoding or military packaging standards required. The place of performance is within Cupertino, with f.o.b. terms set at a California point. The District retains authority to inspect and accept all work upon delivery or at final completion, and the contractor is fully responsible for remediation of defective

General Info

Repair 63 open cut spots and burst 9 pipe segments, replacing 3,472 feet, restoring infrastructure.

Agency

California → Mark Thomas

Place of Performance

CA, USA

Set-Aside

NONE

Documents

8

Addendum No. 1 for Significant Defect Repair Project – Phase 3

PDF, High priority: read this firstamendment
High

Addendum No. 2 for Significant Defect Repair Project – Phase 3

PDF, High priority: read this firstamendment
High

Addendum No. 3 - Significant Defect Repair Project Phase 3

PDF, High priority: read this firstamendment
High

Significant Defect Repair Project Phase 3 - Contract Plans

PDF, High priority: read this firstcontract-document
High

Significant Defect Repair Project Phase 3 Contract Specifications

PDF, High priority: read this firstspecifications
High

Statement of Qualifications Form for Cupertino Sanitary District Project

PDF, High priority: read this firststatement-of-qualifications
High

SECTION 00 45 07 BIDDER'S REFERENCES FORM

PDF, Low prioritybidder-references-form
Low

SECTION 00 45 19 Non-Collusion Affidavit Form

PDF, Low prioritynon-collusion-affidavit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Mark Thomas
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Mark Thomas
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be done under this contract consists of, in general, but not limited to, sixty-three (63) open cut spot repairs at 44 different locations; with a total spot repair length of 672 Linear Feet. Spot repairs will consist of removing existing pipe and replacing with new SDR26 PVC pipe. The diameter of existing pipes to be replaced consist of 6-inch, 8-inch, 14-inch and 15-inch pipes. Work also includes removing and replacing fifty-five (55) 6”x4” wyes, eight (8) 8”x4” wyes and two (2) 14”x4” wyes. Of the sixty-three (63) open cut spot repairs in this project, twenty-two of those require a reconnection with water-stop to an existing manhole. In addition to open cut spot repairs there are nine (9) pipe bursting segments at eight (8) locations; with a total pipe bursting replacement length of 2,800 Linear Feet. Pipe bursting replacements will consist of removing existing pipe and replacing with new SDR17 HDPE pipe. All pipe bursting locations will require a reconnection with water-stop to an existing manhole. In addition, there are two (2) repairs that require CIPP lining at 1 location. In addition to doing all the work involved, it also includes but not limited to, excavating, installing and backfilling, complete in place, including pipe, fittings, wye and band coupling, trench excavation and backfill, trench safety and shoring, utility potholing and pavement removal and restoration of pavement and surfacing, including lane and crosswalk restriping, temporary bypass pumping, removal and reinstallation of fence panels and fence posts, removal and reinstallation of pavers, removal and restoration of concrete curb, gutter, and sidewalks, and removing and replanting trees, shrubs, and plants, and any necessary irrigation lines, as shown on the plans, as specified in these specifications, and as directed by the Engineer All work items shall be constructed in accordance with the Contract Plans & Specifications. Bidding Documents will contain the full descriptions of the Work.
All work under this contract shall be completed within 122 Working Days from the Notice to Proceed effective date. The District shall assess Liquidated Damages in the amount of $500 per Working Day for delays in completion of the project.
The District will conduct an optional pre-bid conference/job walk on Wednesday, May 6, 2026 at 10:00 AM PST. Location for meeting will be Location 15 at 10230 Yoshino Pl, Cupertino, CA 95014. Please RSVP with the District at +1 (555) 000-0000. The optional pre-bid conference/job walk is estimated to last approximately 3 hours.
Bids are due on Friday, May 15, 2026 at 10:00 AM PST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS