DArrigo Brothers and General Farm Investments Well Replacement Project
Forecast
2025121248State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Monterey County
Place of Performance
Set-Aside
NONE
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownGet what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseForecast
Posted
forecast
Organization & Contact Information
Show more
AgencyCalifornia → Monterey County
Contacts4 people available
OfficeN/A
Organization / Agency
California → Monterey County
Office AddressN/A
Contacts
ROGER VAN HORNSupervisor
Denise DuffyPrincipal
Neil BensonProperty Owner
Christopher BunnOwner
Interested Companies (1)
Denise Duffy & AssociatesMonterey, CA
Full Description
Show more
The Proposed Project would install two new replacement wells for existing agricultural production wells experiencing issues with water quality. Specifically, DArrigo Brothers of USA would install a new replacement well with a maximum capacity of 2,000 gallons per minute (GPM), and General Farm Investments would install a new 1,500 GPM replacement well. Both wells would be drilled to a depth of approximately 1710 feet and be screened in the Deep Aquifer of the Salinas Valley Groundwater Basin (Deep Aquifer). The proposed wells would have about 800 feet of conductor casing and seal to isolate the production zone from the overlying sediments of the aquitard and the 180/400 Foot Aquifer of the Salinas Valley Groundwater Basin. The Proposed Project would not result in an increase in irrigated land, and new replacement wells in the Deep Aquifer would replace existing wells in the shallow zones of the 180/400 Foot Aquifer. The Proposed Project would include destruction of the existing shallow wells by state and county approved methods.
Similar Contracts
Same NAICS industry code
Research this forecast and prepare for the solicitation
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
