Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

D’Arrigo Brothers and General Farm Investments Well Replacement Project

Forecast
2025121248State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Monterey County

Place of Performance

Highway 183, San Jon Road, and McFadden Road, Salinas, CA, 93908

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Denise Duffy & AssociatesMonterey, CA

Full Description

Show more
The Proposed Project would install two new replacement wells for existing agricultural production wells experiencing issues with water quality. Specifically, D’Arrigo Brothers of USA would install a new replacement well with a maximum capacity of 2,000 gallons per minute (GPM), and General Farm Investments would install a new 1,500 GPM replacement well. Both wells would be drilled to a depth of approximately 1710 feet and be screened in the Deep Aquifer of the Salinas Valley Groundwater Basin (Deep Aquifer). The proposed wells would have about 800 feet of conductor casing and seal to isolate the production zone from the overlying sediments of the aquitard and the 180/400 Foot Aquifer of the Salinas Valley Groundwater Basin. The Proposed Project would not result in an increase in irrigated land, and new replacement wells in the Deep Aquifer would replace existing wells in the shallow zones of the 180/400 Foot Aquifer. The Proposed Project would include destruction of the existing shallow wells by state and county approved methods.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
AB 1572 Recycled Water Assessment
Solicitation # 27-04
The City of Escondido is soliciting proposals for the AB 1572 Recycled Water Assessment (Solicitation #27-04) to conduct a planning-level assessment of opportunities, constraints, and generalized costs associated with using recycled water to support compliance with Assembly Bill 1572. The scope of work focuses on identifying broad recycled water opportunities and order-of-magnitude cost considerations using GIS information and non-functional turf datasets, specifically excluding detailed design engineering or hydraulic modeling. Key deliverables include cost tables detailing planning-level ranges and a summary presentation for City leadership. Proposals must be submitted via email to Randy Manns and Cricket Lichtenfels by December 17, 2026, and must be limited to 30 pages, including a project schedule and a signed non-collusion declaration. The contract will be awarded to the most responsive and responsible bidder based on the most advantageous proposal, with the City serving as the sole judge of merit. Key personnel must demonstrate experience with EPA and California water conservation requirements. Funding is provided on a fiscal year basis and is subject to annual appropriations. Payment terms are Net 30 days from the date of invoice, with invoices submitted monthly via email to Utilities Construction Management staff. The successful consultant must maintain insurance per Exhibit 1 and obtain a City of Escondido Business License. There is no specified set-aside status for this solicitation.
City of Escondido

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS