Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from DOT014500 CAPITAL PROGRAM ADMINISTRATION DOTD1 was posted on March 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

D01 Highway Lighting ALL-SR81 22.23

Closed
SRC0000029210State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
New
Federal
Replace Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA010
The US Army is requesting quotes for the replacement of exterior cipher locks and the retrofit of exit hardware at Building 768, Schofield Barracks, in Honolulu, Hawaii. This project involves the removal of obsolete hardware and the installation of 17 DoD-approved standalone electronic 10-PIN pushbutton cipher locks, heavy-duty vertical rod panic exit hardware, and high-security Small Format Interchangeable Cores (SFIC). The scope includes specialized conversion trim for both standard and bullet-resistant door assemblies, ensuring all installations meet DoD physical security requirements and NFPA 101 Life Safety egress regulations. Key deliverables include the fully operational hardware, master override and control keys, DPW key custody documentation, programming guides, and a two-year warranty on workmanship and hardware. This solicitation is a total set-aside for Women-Owned Small Businesses under NAICS 432710. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to provide detailed technical specifications, a compliance crosswalk, and proof that installation personnel are GSA-certified and manufacturer-authorized. The period of performance is 30 calendar days from the date of award, with shipping terms set as FOB Destination. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Quotations are due by November 24, 2026, and must include a firm-fixed-price proposal and a comprehensive technical approach.
0413 Aq Hq Contract Augmented

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Ohio Department of Transportation (ODOT) has initiated a contract aimed at enhancing road safety and infrastructure by procuring highway lighting equipment. This contract involves the supply and delivery of 14 AT15B32 conventional highway light poles with bracket arms for the ALL-SR81 22.23 project. It emphasizes compliance with ODOT's established specifications and procedures. The delivery of these light poles and bracket arms must occur within five months of receiving a valid State of Ohio Purchase Order (PO), while partial delivery of anchor bolts and other foundation hardware is expected within three months. The deliveries must be coordinated to assure efficient storage and hand-off, scheduled between 8:00 a.m. and 3:00 p.m., Monday through Friday, except on State holidays, unless ODOT authorizes otherwise. Every unit must be shipped with its related hardware in individually labeled and secured boxes or crates. The contract will take effect upon the issuance of a valid State of Ohio Purchase Order and will remain in force until the fulfillment of all delivery obligations. The delivery destination is ODOT's Beaverdam Outpost in Bluffton, OH. Important milestones are detailed for partial deliveries within the specified three to five-month timeframe. The contract underscores strict adherence to packaging and notification requirements, including a mandatory five-day advance notice to ODOT prior to delivery, allowing for coordinated unloading arrangements. Furthermore, the contract specifies that all supplies must meet the standards set by the Ohio Department of Transportation Construction and Material Specifications Manual, ensuring the materials are suitable for immediate use in construction projects.

General Info

ODOT contracts for 14 highway light poles, ensuring timely delivery and compliance with specifications.

Agency

DOT014500 CAPITAL PROGRAM ADMINISTRATION DOTD1

Place of Performance

OH, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Industrial Piping and Valve SupplyOpen now, due in 13 days
  • Proprietary Door Parts SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDOT014500 CAPITAL PROGRAM ADMINISTRATION DOTD1
ContactsNo contacts available
OfficeN/A
Organization / Agency
DOT014500 CAPITAL PROGRAM ADMINISTRATION DOTD1
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
14 EACH - AT15B32 Highway Light Poles, ConventionalDelivery of the Light Poles (Conventional) and Bracket Arms shall be made within five (5) months upon written or verbal notification of a valid State of Ohio Purchase Order (PO).Partial delivery of the order will be expected for the anchor bolts and associated foundation hardware within three (3) months of the PO notification.All deliveries shall be coordinated to ensure proper storage and hand-off methods are in place. Deliveries must be between the hours of 8:00 a.m. and 3:00 p.m., Monday through Friday, excluding State of Ohio holidays, unless special permission is granted by the Department to temporarily waive or adjust this requirement.For details on Specifications and Procedures for Lighting Supports, see bid items.The supports shall be shipped with each support’s associated hardware separately boxed/crated labeled, packaged, and secured. This includes all hardware except the foundation anchor bolts, washers, and nuts.Manufacturers’ recommended anchor bolts shall be delivered in bundles. A bundle shall consist of all required anchor bolts and mounting hardware. The mounting hardware shall be installed on each bolt when shipped.The supplier shall notify the point of delivery date and time at least five (5) days in advance of the day of delivery or at the time of loading prior to shipment, whichever is sooner. This notification is needed for the Department to coordinate equipment to unload the shipment at the delivery location. An itemization of all delivered parts shall be provided with each shipment.If desired, contact Derrick Schierloh at Sign up to see this detail to schedule a site visit to the delivery location.Bid Line Items:One-time bid pricing for furnishing and delivery of conventional light poles with bracket arms in accordance with the Department’s specifications and procedures for Highway Lighting Supports.# Specification1. Total cost to furnish and deliver AT15B32 Highway Light Pole, Conventional  to ODOT’s Beaverdam Outpost (6545 Swaney Road, Bluffton, OH 45817) for the proposed highway lighting for ODOT’s Project ALL-SR 81-22.23 (PART 1 & 2); PID 117742 per the Specifications and Procedures for Lighting Supports by no later than September 1, 2025. Quantity:14, UOM: EAItem Note: Delivery of the Traffic Supports shall be made within five (5) months upon written or verbal notification of a valid State of Ohio Purchase Order (PO).Partial delivery of the order will be expected for the anchor bolts and associated foundation hardware within three (3) months of the PO notification.All deliveries shall be coordinated to ensure proper storage and hand-off methods are in place. Deliveries must be between the hours of 8:00 a.m. and 3:00 p.m., Monday through Friday, excluding State of Ohio holidays, unless special permission is granted by the Department to temporarily waive or adjust this requirement.Specifications and Procedures for Lighting Supports:Specifications: These specifications and procedures have been compiled in part from the Ohio Department of Transportation 2023 Construction and Material Specifications Manual (C&MS), which can be found here: https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/2023_CMS_Final_to_Printer.pdf  Additionally, all supports furnished shall conform to the following Standards unless otherwise stated: C&MS 625 and 725 as well as Standard Construction Drawings HL-10.11, HL-10.12, HL-10.13, and HL-20.11 which can be found here: https://www.dot.state.oh.us/SCDs/Pages/traffic.aspxThe furnished supports shall include the associated hardware as shown on all applicable SCDs, which includes but is not limited to foundation anchor bolts, washers, and nuts. If shown on the attached plans from the bid requestor, furnish bracket arms with all attachment hardware.All supports shall be permanently marked as to ODOT design type, height, and arm length (if applicable) (e.g. AT15B32; 32’ HT., 15’ ARM) on the bottom of the anchor base plates. The manufacturer’s catalog numbers, or other identifying codes may remain on the supports, but they will not fulfill this requirement. Anchor bolt sets shall be identified by permanently marked waterproof tags. If delivered parts are not easily identified on the bottom of the anchor base for supports or by waterproof tags for anchor bolt sets as to design type and length, the parts will be returned to the bidder at his or her expense. No unidentified parts will be accepted.Light Pole and Light Tower materials meeting the Department’s Construction and Materials Specifications, 725.01, 725.21, standards or plans will be acceptable for direct shipment and immediate use in construction projects per Supplement 1091. Producer/suppliers conforming to this supplement’s requirements are authorized to provide light pole and light tower materials under certification. This supplement makes no changes or revisions of any ODOT, ASTM or AASHTO specifications for the light pole or light tower materials.Certification of a light pole or light tower does not eliminate the Project Engineer’s authority to inspect and reject any, or all, certified light poles or light towers delivered to the jobsite with excessive defects, damage or that do not meet specifications.The following is a list of Certified Producers and Suppliers per requirements of Supplements 1091:https://www.dot.state.oh.us/Divisions/ConstructionMgt/Materials/Suppliers/S-1091.pdfThe fabricators must adhere and be listed as required on Supplements 1091 which can be found here:                                                                                                                    https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/2023_CMS_Final_to_Printer.pdf  Steel Specification: Ohio Revised Code (Section 153.011) and CM&S 106.09 - Steel & Iron Products Made in the United States: To be noted, all requirements stated in CM&S 106.09 shall be adhered to.Procedures: The submittal of a unit bid price does not guarantee that ODOT will purchase the materials from the vendor. A specific Purchase Order (PO) will be sent to the vendor and at that time, the previously noted Delivery Time will begin.At the time of the bid, the bidder shall file all detailed shop drawings, photographs, specifications, etc. on the proposed items. If further clarification is needed by the bidder due to issues or design errors before the bid opening date, the bidder shall submit all pre-bid questions to the Bid Contact. Any deviations from the specifications indicated herein must be clearly pointed out. Otherwise, it will be considered that items offered are in strict compliance with these specifications herein and the successful bidder will be held responsible, therefore. If more than one catalog number, style or type is listed on one sheet the item to be furnished must be identified clearly by circling, underlining, or other marking. Discovery of details not meeting specifications may result in disqualification of the bid.Approval of these detailed shop drawings, etc. shall not relieve the bidder of the responsibility for erroneous or inconsistent dimensions, notations, omissions, or other errors in the design of the delivered product.The unit bid price shall include delivery charges to the location listed.Each unit delivered shall be guaranteed against faulty material and workmanship for a period as stated by the bidder in the proposal (this guarantee period shall be not less than that usually granted) and, if during this period such faults develop, the bidder agrees to replace the unit or the part affected without cost to ODOT, with all replacement charges paid for by the vendor.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS