This Solicitation opportunity from South Dakota was posted on May 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dakota Fields & Lighting Project

Closed
2881State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
LED Lighting & Occupancy Sensor Upgrade @ Batavia SPC
Solicitation # 70CMSW25R00000011
The LED Lighting and Occupancy Sensor Upgrade project for the Batavia Service Processing Center involves the removal and disposal of existing fluorescent light fixtures, lamps, and ballasts, and the installation of energy-efficient LED lighting fixtures and occupancy sensors. The scope includes all necessary labor, supervision, equipment, materials, and testing, with a requirement to provide 5% attic stock. The project must be completed within 180 calendar days from the notice to proceed and must comply with the National Electrical Code, the International Building Code, the Americans with Disabilities Act, and American Correctional Association standards. Key deliverables include a Quality Control Plan within 15 days of award, a site survey within 30 days of award, and product submittals within 30 days following the site survey. Acceptance is based on 98% of all fixtures and sensors being fully operational, supported by a detailed spreadsheet verifying 100% testing of all controls. The contractor is responsible for providing a commissioning report within 10 days of testing completion, as well as as-built drawings and warranty documentation at project closeout. This contract is subject to the Davis-Bacon Act for prevailing wage rates in Genesee County, New York, and requires adherence to OSHA safety standards.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 3 days
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is seeking a Firm-Fixed-Price task order under an 8(a) MACC IDIQ for the replacement of two emergency generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves removing two existing units and installing one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures and anchored to existing concrete slabs. The scope includes the installation of two new NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of generator load tests. The estimated magnitude of the project is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, a feasible program implementation plan, and a robust quality control and safety program. Contractors must comply with the Buy American Act and adhere to Davis-Bacon prevailing wage rates for building construction in Puerto Rico. Key administrative requirements include the submission of certified payroll with electronic invoicing via the Invoice Processing Platform, the provision of performance and payment bonds, and strict adherence to security protocols, including the signing of non-disclosure agreements and obtaining PIV cards for personnel. Work is scheduled for regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the U.S. Virgin Islands. These units will serve as high-security, environmentally controlled spaces for forensic science technicians and must include A.C., electrical outlets, lighting, insulation, vinyl flooring, four security windows, and a steel door equipped with a Cypher lock. The offices are to be installed on 3k PSI reinforced concrete slabs measuring 42' x 10' x 6" with #4 rebars and connected to the nearest electrical circuit via 2-inch PVC or uPVC conduit. Each unit must also be equipped with a fire extinguisher. The project has an estimated magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price among qualified offerors who meet technical and safety requirements. Contractors must comply with the Buy American Act, adhere to the VI20260001 wage determination for prevailing wages, and ensure all personnel sign the required DHS Non-Disclosure Agreements. Project management requirements include submitting a detailed schedule within 15 days of the Notice to Proceed and utilizing the Invoice Processing Platform for electronic payments accompanied by certified payroll. All work must meet NFPA 70 and International Building Code standards.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC), acting as the operator for the Inland Empire Job Corps Center, is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the facility in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW units. All new devices must be integrated into the existing system and undergo complete functional testing. The project is estimated between 0 and 25,000 dollars, with a performance period of 90 consecutive business days following the notice to proceed. Bids are due by September 16, 2026, and will be evaluated based on overall best value. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238210. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to California prevailing wage determinations. For bids of 25,000 dollars or more, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. Awardees must provide a Unique Entity ID (UEI) and complete the MTC Supplier Packet. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by the center and government representatives.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The City of Rapid City, South Dakota, is soliciting bids for the Dakota Fields & Lighting Project, identified by solicitation number 2881, to upgrade athletic fields 9 through 12 with new lighting systems and convert field #10 to artificial turf, aiming to extend playable hours, increase game scheduling capacity, and ensure year-round usability regardless of weather. The estimated project cost is $905,000, though the bid schedule itself contains no populated unit or extended pricing, leaving the final contract value to be determined by the selected bidder’s proposal. All work must comply with the City’s Standard Specifications, the National Electrical Code, OSHA regulations, and state electrical laws, with all electrical materials required to be UL-listed and installed by qualified personnel using workmanship of the highest standard. The project requires full mobilization, excavation, drainage and irrigation modifications, and electrical system upgrades including conduit installation, with strict guidelines prohibiting conduit installation under playing surfaces and mandating specific materials—galvanized rigid conduit above ground and PVC below ground with slip fittings at transitions. Bidders are required to submit a base bid alongside five mandatory alternates, including a Kwik Goal backstop barrier net system, spectator seating concrete pad, covered team bench with pad, additional parking lot lighting, and an upgraded electrical service, with the City retaining discretion to accept the base bid alone or any combination of alternates based on overall value and best interest. Although no formal FAR clauses or numerical clause identifiers are included, the procurement follows a Lowest Price Technically Acceptable (LPTA) approach with flexibility for trade-offs when alternates offer enhanced benefits. Proposals must be submitted in sealed hard copy to the City Finance Office by June 2, 2026, at 2:00 p.m., with no electronic submissions accepted for the bid itself. Bidders must provide certifications regarding prohibited entity status and debarment/suspension, with affirmative responses requiring written explanation, but no requirement exists for UEI, CAGE, or socioeconomic status disclosures. The winning contractor must furnish as-built drawings, operation and maintenance manuals, comply with all permit requirements, and guarantee workmanship for one year, while also providing a performance bond and naming the City as an additional insured. All inspections occur on-site and are conducted by the City’s Engineer, with acceptance contingent upon approval of documentation and compliance with all technical and quality standards.

General Info

Dakota Fields project installs lighting on fields 9-12, converts field 10 to turf, costing $905,000.

Agency

South Dakota → City of Rapid CityView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

SD, USA

Set-Aside

NONE

Documents

(3)

Project No. 2881 Bidder's Schedule for Public Purchase

XLSXbidder-schedule

City of Rapid City Dakota Fields Plans - Project 2881

PDFspecifications

Dakota Fields & Lighting Project No. 2881 - Invitation for Bids

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Dakota → City of Rapid City
Contacts1 person available
OfficeN/A
Organization / Agency
South Dakota → City of Rapid City
View Agency Profile
Office AddressN/A

Full Description

Show more
This project includes the installation of athletic lighting to fields #'s 9-12, and converting field #10 to artificial turf. These upgrades will help to significantly increase playable hours, generate additional game slots, and ensure reliable field use in all weather conditions. Project Cost Estimate: $905,000.00

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS