Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on March 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DART CBD TSP Cabinet Power

Closed
2093591State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811210
New
SLED
Fountain Square UPS Battery Replacement
Solicitation # SRC0000043227
The Ohio Department of Natural Resources (ODNR) Office of Information Technology is seeking a supplier to replace Uninterruptible Power Supply (UPS) batteries and external battery cabinets at the Fountain Square Campus in Columbus, Ohio. The scope of work includes the provision and installation of nine new UPS batteries—specifically for eight GXT3 10kVA systems and one GXT5 3kVA system—and eighteen external battery cabinets. The selected supplier is responsible for all installation labor, system inspection and testing to ensure full functionality, and the removal and disposal of all existing batteries and project-related waste. All work must be performed during normal business hours, Monday through Friday, from 9:00 am to 5:00 pm, with a minimum one-year warranty required for all provided batteries. The contract will be awarded to the lowest responsive and responsible bidder by line item, with proposals submitted exclusively through the Ohio Buys portal. Evaluation includes preferences for Buy American, Buy Ohio, and Veteran-Friendly businesses, provided the product cost exceeds 50% of the total offered cost. The agreement is governed by the State of Ohio Standard Terms and Conditions, requiring compliance with cybersecurity frameworks, accessibility standards, and prevailing wage requirements. Additionally, contractors must certify they are not boycotting jurisdictions with which Ohio has open trade and must disclose any offshore services or data locations. There is no specific set-aside status for this solicitation.
Dnr250230 Oit Administrative Services Dnrfra

POSTED

1 day ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Dallas Area Rapid Transit (DART) is soliciting bids for the CBD TSP Cabinet Power project to replace batteries, power supply units, and UPS units at 13 traffic signal priority intersection locations in Texas. The contractor is responsible for providing all necessary tools, equipment, and installation hardware, with work required to be performed during overnight shifts using temporary generators and lighting. Key deliverables include the installation of new power equipment, disposal of old components, and the submission of final close-out documentation. DART will provide flagging support for the duration of the project. This is a single-award solicitation requiring a payment bond issued by a Texas-licensed corporate surety. Bidders must submit a mandatory Schedule of Subcontractors and descriptive literature for any non-specific equipment to demonstrate technical acceptability. Evaluation is based on unit pricing and responsibility, with the authority reserving the right to reject materially unbalanced offers. The contract is governed by DART General Provisions and Special Provisions for Indefinite Delivery/Indefinite Quantity contracts, including strict safety regulations for work adjacent to active railroads. Compliance with small business concern provisions and the submission of a Good Faith Effort letter may be required.

General Info

DART seeks bids to replace power equipment at 13 Texas traffic signal locations.

Documents

13
PDF, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstsupporting-documents
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstpast-performance
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, Low priorityother
Low
PDF, Low priorityother
Low

Read all 13 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • GC/MS Instrument Repair and Calibration ServicesOpen now, due in 4 days
  • GC/MS Instrument Repair BHTXOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
Contacts1 person available
OfficeTX, USA

Full Description

Show more
Replace batteries in signal enclosure at 13 locations

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
The Trinity Railway Express (TRE) 2MT IH-35E Design project, solicitation P-2096182, involves professional engineering design services to prepare construction documents for a 1.95-mile double track section from I-35E to Mockingbird Lane in Dallas, Texas. Managed by the Dallas Area Rapid Transit (DART) and coordinated with the Texas Department of Transportation (TxDOT) Dallas District, the scope includes the DART Rail Bridge Replacement east of the former Mockingbird Bridge, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Blvd and the Knights Branch and Noble Branch stream crossings. The project requires an interim connection to transition from double track to the existing single track at the TxDOT right-of-way line. Technical specifications include a mandatory 18.5-foot vertical clearance for the I-35E freight corridor and design speeds of 60 mph for freight and 79 mph for passenger rail. The project also integrates with the Harry Hines Boulevard Transportation Master Plan, featuring various intersection layout alternatives to improve multimodal connectivity and safety. The winning bidder must sign a confidentiality agreement and ensure all personnel complete specialized training on new bridge design and construction methods. This solicitation is not set aside for any specific business category.
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS