Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

[DB-RFQ 26-16 Building C1 Rotunda

Closed
DB-RFQ 26-16 Building C1 RotundaState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution for classrooms, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems and lighting controls. The contractor is also responsible for correcting plumbing deficiencies and installing new safety stair treads in all stairwells. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict submission guidelines, including electronic delivery of separate price and technical files. All work must comply with ADA accessibility guidelines, Buy American requirements, and prevailing wage rates as specified in the applicable wage determinations.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary pricing elements: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Contractors must implement a government-approved Quality Control Plan utilizing three phases of control for each Definable Feature of Work and adhere to strict marking and labeling standards, including MIL-STD-101 for piping. Invoicing is managed through Wide Area Work Flow with monthly submissions required within five calendar days of the invoice date.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes the construction of a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitory rooms, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave provisions. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed. The project includes a one-year guarantee of workmanship and a specific 20-year product warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

San Jacinto Community College District is seeking qualified design-build firms to deliver a comprehensive turnkey solution for the renovation of the rotunda at Building C1 on its Central Campus, with a project budget estimated at $500,000. The solicitation, identified as DB-RFQ 26-16, follows a two-step process where firms must first submit qualification statements by June 25, 2026, through the IonWave e-Bidding system, with no cost proposals accepted at this stage. The project involves converting the existing single-barrier aluminum composite material (ACM) system to a rain-screen design, including removal of old panels, waterproofing the building envelope, and installing a new ACM system that maintains the current aesthetic. Work will be executed in two phased stages while the building remains occupied throughout construction, with the initial phase focused on selective demolition and temporary waterproofing, followed by permanent waterproofing and installation of the new system. All proposals must meet strict formatting and submission requirements, including a 20-page qualification package, audited financial statements, a surety letter of intent, proof of insurance, and a completed conflict of interest form. Firms must demonstrate experience and capability through detailed responses covering staffing approach, management plan, current workload, resources, and phasing strategy, which will be evaluated under weighted criteria totaling 100 points, with the highest emphasis on project qualifications at 35 points, followed by firm history, safety record, references, bonding capacity, and audited financial statements. Compliance with federal, state, and local regulations is mandatory, including adherence to prevailing wage rates as adopted by the College, OSHA standards, and ADA accessibility requirements. Insurance requirements are stringent, mandating commercial general liability coverage of $1 million per occurrence and $2 million aggregate, with San Jacinto College named as an additional insured on all policies except workers’ compensation, which must meet Texas statutory limits of $500,000 per accident and per disease. Contractors must also comply with a strict safety plan, prohibit weapons and tobacco use except in designated areas, and ensure proper labeling of temporary chemical containers per OSHA 1910.122. Evaluation is pass/fail on completeness and compliance, with up to five firms advancing to a request for proposal stage, where a guaranteed maximum price will be submitted. All documents must be uploaded to IonWave, named to specific standards, and submitted before the deadline; late or incomplete submissions will be rejected without exception.

General Info

San Jacinto CCD seeks design-build firms for $500,000 rotunda project, submissions due June 25, 2026.

Documents

8

2015 Bond Program Expectations - San Jacinto College

PDF, High priority: read this firstprogram-expectations
High

Conflict of Interest Questionnaire (COI) for SJCCD Vendors

PDF, High priority: read this firstconflict-of-interest-questionnaire
High

DB-RFQ 26-16 Building C1 Rotunda Design-Build Services Request for Qualifications

PDF, High priority: read this firstrfq
High

SJCCD Construction Insurance Requirements 2.5.21

PDF, High priority: read this firstinsurance-requirements
High

SJC Contractor Safety Requirements

PDF, High priority: read this firstsafety-requirements
High

Texas Prevailing Wage Rates Determination 2025

PDF, High priority: read this first3 pages · wage-determination
High

Drawings SJCCD Central Campus Technology Building July 2001

PDF, Low priorityother
Low

Rotunda Pictures

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → San Jacinto College
Contacts1 person available
OfficeTX, USA
Organization / AgencyTexas → San Jacinto College
Office AddressTX, USA
Contacts

Full Description

Show more
San Jacinto Community College District is soliciting qualification statements in a two-step solicitation process from firms to provide design-build services for rotunda at Building C1. Project Estimate : The current Project Budget is estimated at $500,000. Schedule : Work is scheduled to start July 2026 and shall be completed by January 1, 2027. All proposals must be submitted through this IonWave e-Bidding system. The system does not allow responses to be submitted unless all requirements have been met such as responses to required Attributes and uploaded required Attachments. This takes time to complete, so please do not wait to submit your proposal. There are seven tabs to our solicitations: 1. Event Details : Contains the issue date and time, close date and time, status of the request, notes, and contact information for the Procurement Contact. 2. Questions : Submit any questions you may have before the deadline. See Activities tab for deadlines. 3. Activities : Any event dates related to this solicitation. 4. Attachments : Read all attachments. RFQ request can be found here. 5. Attributes : Acknowledgements, terms and conditions, questions about your firm, references, etc. 6. Response Attachments : Attach all required documents and information. 7. Response Submission : Enter the name and e-mail address of respondent and submit response. This individual must have the authority to submit a response on the company's behalf.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS