Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Agriculture was posted on September 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Delintment Lake Water System Installation

Closed
1240BH24Q0052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

OR, USA

Set-Aside

SBA

Documents

4

1240BH24Q0052 Delintment Lake Campground Amendment 01

PDF, High priority: read this first2 pages · amendment
High

1240BH24Q0052 Delintment Lake Campground Amendment 02

PDF, High priority: read this first2 pages · amendment
High

1240BH24Q0052 - Delintment Lake Water System

PDF, High priority: read this firstrfq
High

Delintment Lake Water System Project Specifications

PDF, High priority: read this first64 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Sep 12, 2024 to Sep 18, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Northwest 6 Usda-Fs
Contacts1 person available
OfficePortland, OR, 972042829, USA
Office AddressPortland, OR, 972042829, USA

Full Description

Show more
Amendment 02 - Provides answers to Contractor Questions. This amendment does *not* extend the solicitation closing date. Offers are due September 18, 2024 - 1000 PT. Amendment 01 - Provides answers to Contractor Questions. This amendment does *not* extend the solicitation closing date. Offers are due September 18, 2024 - 1000 PT. The Malheur National Forest intends to acquire by contract the replacement of an existing handpump delivery system with a solar pump at the Delintment Lake Campground located within the Emigrant Creek Ranger District. This contract includes but is not limited to the removal and disposal of existing handpump from well casing, replacing the handpump with a new solar pump, installing solar panels and pole (including electrical wiring), preparing pad for placement of prefab concrete building, placing concrete prefab building on prepared gravel pad, installing two 300 gallon water holding tanks in building, plumbing the well to the water tanks and installing electrical solar panels to the building. Work is anticipated to start May 1st, 2025. All work, including punch list items, site cleanup, and de-mobilization, shall be completed prior to September 30th, 2025. The contractor shall provide all management, labor, tools, equipment, supplies and incidentals necessary to ensure the work is performed in accordance with the solicitation requirements. The contractor is responsible for maintaining all applicable licenses and obtaining any necessary permits for this project. The project is located at the Delintment Lake Campground and is located within the Emigrant Creek Ranger District. This acquisition is a 100% Small Business set-aside. The applicable NAICS code is 237110- Water and Sewer Line and Related Structures Construction. The corresponding size standard is $45 million. Offerors will be evaluated on technical capability (experience), past performance, technical approach, capacity to accomplish work on time and price. The Contract will be awarded to the offeror whose submittal, in compliance with the solicitation, is the best value to the Government. The Government total estimated value is between $100,000 and $250,000. All responsible sources may submit an offer which will be considered by the government. Prospective contractors must be registered in the System for Award Management (SAM) prior to award of a contract. Lack of registration in the SAM Database will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov/. A solicitation for this project will be posted to this website on or around September 4, 2024 with offers due around September 18, 2024.

More opportunities from Department Of Agriculture → Csa Northwest 6 Usda-Fs

Same awarding agency

NAICS: 237990
Federal
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Solicitation # 1240BH27Q0002
Solicitation 1240BH27Q0002 is a combined synopsis and request for quotation for the Tony Grove Dam Spillway Capacity and Seismic Mitigation project located in the Logan District of the Uinta-Wasatch-Cache National Forest in Cache County, Utah. The scope of work involves reconstructing portions of the dam, replacing outlet works, raising the dam crest, and adding embankment material. The project includes a base item for the primary mitigation work and optional items for a precast concrete vault restroom and hot mix asphalt application. This is a total small business set-aside under NAICS code 237990, with a size standard of 45 million dollars. The government will award the contract based on best value, evaluating quotations through a comparative methodology focusing on technical approach, project management, performance scheduling, specialized experience, and past performance. The base period of performance is scheduled from June 1, 2027, to October 1, 2027. Key requirements include a 20 percent bid guarantee for quotes exceeding 150,000 dollars, compliance with the Davis-Bacon Act, and adherence to OSHA excavation standards. Contractors must be registered in the System for Award Management and submit their quotes by November 2, 2026. Inspection and acceptance will be conducted per FAR 52.246-12, and all invoicing must be processed electronically through the Department of Treasury's Invoice Processing Platform.
Other Heavy and Civil Engineering Construction

POSTED

16 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS