Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Demolition & Site Clearing

Open
State & Local
Response DeadlineDue in 27 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Demolition and Site Clearing involves the demolition of existing pipeline and surface structures for prime contractors on Rancho California Water District utility projects. The scope of work includes the demolition of 1,300 linear feet of 24-inch cement mortar lined steel mainline, as well as the removal of pavement, curbs, gutters, and below-grade concrete slabs and footings. The objective is to deliver a cleared site with all debris removed. The project is managed by the Engineering/Contracts Department of Rancho California Water District in California under NAICS code 238910. The solicitation was posted on November 16, 2026, with a response deadline of December 22, 2026. There is no specified set-aside status for this contract.

General Info

Subcontract for demolition and site clearing of pipeline and structures for Rancho California.

Documents

This scope was carved out of D2605.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Old Town Front Street Pipeline Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Old Town Front Street Pipeline Replacement
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEngineering/Contracts Department of Rancho California Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs demolition of existing pipeline and surface structures for prime contractors on Rancho California Water District utility projects. Demolishes 1,300 LF of 24-inch cement mortar lined steel mainline and removes pavement, curbs, gutters, and below-grade concrete slabs/footings per Section 02050. Delivers a cleared site and removed debris.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
International
Demolition of Rhos Point (Marine Drive, Rhos on Sea)
Solicitation # ocds-h6vhtk-07c4a6
Conwy County Borough Council is seeking a qualified contractor for the demolition of commercial and dilapidated ancillary buildings at Rhos Point, Marine Drive, Rhos on Sea. The project requires the demolition of structures down to levels indicated in the Dewis demolition drawings, with the critical requirement that the Grade II Listed Tower be retained and protected. The scope of work includes groundworks to remove rubbish, concrete, metal, glass, and contaminated topsoil, as well as the removal of asbestos-containing materials by an HSE-licensed contractor. All works must be completed by March 31, 2027, and are funded by the Local Growth Fund. The contract will be governed by the JCT Minor Works Building Contract 2024 Edition and must comply with CDM Regulations. The selection process is based on a weighted evaluation consisting of 70% price assessment and 30% quality assessment, with the award going to the top-scoring tenderer. Quality evaluations focus on competence and experience, health and safety, and resourcing, while mandatory pass/fail assessments cover company information, financial standing, and contractual matters. Tenders must be submitted electronically via the sell2wales post-box facility by 16:00 on December 16, 2026. There is no specified set-aside status for this solicitation.
Conwy County Borough Council

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Engineering/Contracts Department of Rancho California Water District

Same awarding agency

NAICS: 237110
SLED
Old Town Front Street Pipeline Replacement
Solicitation # D2605
The Old Town Front Street Pipeline Replacement project, solicitation D2605, is managed by the Engineering/Contracts Department of the Rancho California Water District in California. The scope of work involves the demolition of approximately 1,300 lineal feet of 24-inch cement mortar lined and coated steel transmission mainline and associated appurtenances along Old Town Front Street in Temecula. The project is divided into two segments: Segment 1, spanning 1,035 feet from Old Town Front Street and Rancho California Road to Moreno Road, and Segment 2, spanning 345 feet from Old Town Front Street and Second Street to just northwesterly of First Street. Key deliverables include the installation of new 12-inch PVC pipe, the provision of detailed construction schedules, and the submission of operation and maintenance manuals for pumping equipment. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted via PlanetBids by December 22, 2026, and must include a bid bond of 10% of the total bid price. The successful contractor is required to provide faithful performance and labor and material payment bonds, each equal to 100% of the contract price, from a California-admitted surety insurer. Performance requirements include strict adherence to ASTM compaction and soil testing standards, ADA regulations, and CAL/OSHA safety guidelines. Invoicing must be submitted electronically to the District's accounts payable email and addressed to the Assistant Engineer, Emily Troike. There is no set-aside status specified for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS