Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Demolition and Site Stabilization of Two City-Owned Properties Project

Closed
2026-IFB-051State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Palm Desert is soliciting bids for Project No. SFA00001, which involves the demolition and site stabilization of two city-owned properties located at 44911 Cabrillo Avenue and 44845 San Clemente Circle. The scope of work requires a qualified contractor to manage the entire process, including pre-demolition site assessments, permitting, utility disconnections, and the abatement and compliant disposal of hazardous materials such as asbestos, lead, and mold. Following structural demolition and debris removal, the contractor must perform backfilling, grading, and stabilization to leave both sites clean and safe. The project must be completed within 60 days from the issuance of the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract is awarded to the lowest responsive and responsible bidder and requires strict adherence to the Standard Specifications for Public Works Construction Greenbook and various environmental regulations, including EPA, OSHA, and SCAQMD standards. Contractors must provide a performance bond for 100 percent of the contract value and a bid guarantee of 10 percent. Insurance requirements include general liability of at least 2 million dollars per occurrence, 4 million dollars general aggregate, and 1 million dollars in automobile liability. Additionally, the contractor must comply with a Construction Waste Management Plan requiring a minimum 65 percent diversion of nonhazardous debris, verified by a final report from Burrtec prior to final inspection.

General Info

Palm Desert seeks bids for demolition and site stabilization of two city-owned properties.

Documents

24

2026-IFB-051: Demolition and Site Stabilization of Two City-Owned Properties Project

PDF, High priority: read this firstifb
High

44845 San Clemente Circle Asbestos/Lead Limited Renovation Survey

PDF, High priority: read this firstsow
High

44911 Cabrillo Ave Asbestos and Lead Survey Report

PDF, High priority: read this firstsow
High

BLDG-CKL-25-0003 Demolition of a Building Checklist

PDF, High priority: read this firstspecifications
High

CABRILLO 44911 Plans - 1 of 4

PDF, High priority: read this firstspecifications
High

Cabrillo 44911 Plans (2 of 4)

PDF, High priority: read this firstspecifications
High

CABRILLO 44911 Plans - Part 3 of 4

PDF, High priority: read this firstspecifications
High

Cabrillo 44911 Plans - Part 4

PDF, High priority: read this firstspecifications
High

City of Palm Desert Construction Waste Management Plan

PDF, High priority: read this first4 pages · sow
High

City of Palm Desert Contract for Construction - Project No. SFA00001

DOCX, High priority: read this first9 pages · contract-document
High

Demolition and Site Stabilization of Two City-Owned Properties Project (2026-IFB-051)

PDF, High priority: read this firstifb
High

Invitation for Bid 2026-IFB-051 – Demolition and Site Stabilization

PDF, High priority: read this first115 pages · ifb
High

44845 San Clemente Circle - Certificate of Compliance

PDF, Low priorityother
Low

44911 Cabrillo Avenue Mold Inspection Report

PDF, Low priorityinspection-report
Low

44911 Cabrillo Avenue Site Map Vicinity Map

PDF, Low priorityother
Low

Bid Guarantee / Bid Bond - City of Palm Desert SFA00001

DOCX, Low priority3 pages · other
Low

City of Palm Desert - Inspection Request (44-845 Santa Fe Drive)

PDF, Low priorityother
Low

Limited Asbestos Survey – 44911 Cabrillo Avenue

PDF, Low priorityother
Low

Performance Bond - City of Palm Desert Demolition Project

DOCX, Low priority10 pages · performance-bond
Low

SFA00001 - Pre-Bid Sign-In Sheet

PDF, Low priorityother
Low

Site 2 Location – 44845 San Clemente Cir Site Map

PDF, Low priorityother
Low

44845_San_Clemente_Circle_Driveway.png

PNG

Cabrillo_44911_Block_Wall_Site_Map.png

PNG

Cabrillo_44911_Trees_to_Remove.png

PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → CP - Capital Improvement Projects
Contacts2 people available
OfficePalm Desert, CA, 92260, USA
Office AddressPalm Desert, CA, 92260, USA
Contacts
Alex VasquezProject Manager
Celina CabreraSenior Management Analyst

Interested Companies (54)

Summit Lake Park Eagle Restoration SystemsGrand Junction, CO
Sky Construction ServicesDesert Hot Springs, CA
EntramPORT CHARLOTTE, FL

See All 54 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City owns two properties located at 44911 Cabrillo Avenue and 44845 San Clemente Circle in Palm Desert. The City has determined that the existing structures and associated improvements at these properties are to be removed and the sites cleared, graded, and stabilized. Through this Invitation for Bid, the City is seeking a qualified contractor to perform the demolition and site stabilization work at both properties. The Work will include, as applicable, hazardous materials abatement, utility disconnections and coordination, demolition and removal of existing structures and improvements, debris disposal, site clearing, backfill, grading, and stabilization. As part of its preparation for the Project, the City has obtained environmental assessments and reports addressing potential hazardous materials at the properties, including asbestos, lead, and mold. Applicable reports and site information are included with the Contract Documents and should be carefully reviewed by prospective Bidders in preparing their Bids. Because the Work will occur within established residential areas and may involve hazardous materials, utility disconnections, demolition activities, and heavy equipment, the Contractor will be expected to carefully coordinate the Work and implement appropriate measures for public safety, dust and noise control, protection of adjacent properties, regulatory compliance, and proper handling and disposal of demolition and hazardous materials. Upon completion of the Project, both properties shall be left clean, safe, properly graded, and stabilized in accordance with the Contract Documents and to the satisfaction of the City.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS