Demolition & Utility Removal

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the demolition and removal of existing drainage structures for civil infrastructure projects within the City of Peachtree City, Georgia. The scope of work specifically requires the removal and legal off-site disposal of approximately 78 linear feet of 30 inch Corrugated Metal Pipe, along with all associated headwalls and foundations, utilizing excavators and specialized demolition equipment. The project is categorized under NAICS code 238910 and was posted on October 15, 2026. Interested parties must submit their responses by the deadline of November 17, 2026.

General Info

Demolition and removal of drainage structures in Peachtree City, Georgia by November 17, 2026.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-103BSW.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tuxedo Lane Drainage Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Peachtree City
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs demolition and removal of existing drainage structures for prime contractors on City of Peachtree City civil infrastructure projects. Removes and disposes of approximately 78 linear feet of 30" Corrugated Metal Pipe (CMP) and associated headwalls and foundations. Utilizes excavators and demolition equipment. Delivers removal and legal off-site disposal of demolished materials.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps is soliciting bids for the complete demolition of Building 14, the old security building, and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the demolition of an old septic system, removal of debris, trees, and rocks, and the subsequent backfilling, grading, and seeding of the area. Critical infrastructure requirements include capping the sewer line and disconnecting building power while ensuring uninterrupted power and communications for the guard shack and the mountain pump house and water tank, which may require the installation of new telephone poles. Additionally, the contractor must replace the water shut-off valve with a straight pipe, a task that must be completed within a single day between 8:30 AM and 3:00 PM to minimize disruption to students. This small business set-aside project requires the contractor to provide all necessary permits, dumpsters for haul-off, and chain of responsibility letters for all debris. Due to the location on Foothills Drive, the contractor is responsible for providing traffic control and flaggers to manage heavy equipment and local traffic. Compliance requirements include active registration in SAM.gov, adherence to Davis-Bacon wage standards, and the submission of certified payroll. Bidders must provide separate pricing for labor and materials.
Keystone Job Corps

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details
NAICS: 238910
New
International
Demolition and Clean Up of 8425 Duffs Rd, Whitby
Solicitation # T-43-2026
The Town of Whitby is soliciting electronic bids for contract T-43-2026, which entails the comprehensive demolition and cleanup of the property located at 8425 Duffs Rd, Whitby. The scope of work includes the removal of an existing house, barn, storage building, and all associated foundations, footings, basement slabs, and exterior pads. Additionally, the contractor is responsible for decommissioning mechanical, plumbing, and electrical systems, removing building contents, and clearing the site of general litter, scrap metal, tires, and abandoned vehicles. The project requires the contractor to obtain all necessary demolition permits, perform backfilling and site restoration, and adhere to specific standards such as OPSS-MUNI 510 and 510ER for foundation and septic decommissioning. The contract is expected to commence in November 2026 with a performance period of twenty weeks. Award decisions will be based on the subtotal contract price, provided the bidder meets mandatory qualifications, including a Domestic Supply Chain Plan and a minimum of three references for similar demolition projects completed within the last three years. Successful bidders must provide a performance bond and a labour and materials payment bond, each valued at 50 percent of the accepted tender sum. All bids must be submitted in PDF format via the official electronic bidding system by the deadline of November 12, 2026, and must include a verifiable electronic digital bid bond.
Town of Whitby

POSTED

about 11 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Georgia → City of Peachtree City

Same awarding agency

NAICS: 237110
New
SLED
Tuxedo Lane Drainage Improvement Project
Solicitation # 27-103BSW
The Tuxedo Lane and Smokerise Trace Drainage Improvement Project, solicitation number 27-103BSW, is a construction contract issued by the City of Peachtree City, Georgia. The scope of work involves the removal of select components of an existing 30-inch diameter corrugated metal pipe stormwater system and the installation of a new system featuring 825 linear feet of 30-inch diameter reinforced concrete pipe, one drop inlet, and five junction boxes. Additional requirements include the removal and replacement of an asphalt cart path, trench patching, modification of existing structures, and the restriping of crosswalks. The project also encompasses site clearing, grubbing, and the protection of existing vegetation and fences within the construction area. The contract is awarded to a responsive bidder based on unit price bids, with a specific allowance of 20,000 dollars for owner-directed changes. Bidders must provide a construction contractor's qualification statement, a non-collusion affidavit, a security and immigration compliance affidavit, and a drug-free workplace certification. Awarded contractors are required to provide a performance bond for 100 percent of the project cost and a payment bond for 110 percent. Compliance with Georgia Code 34-4-3 regarding prevailing wages is mandatory. Project administration is managed by the Peachtree City Project Manager, who oversees quality control, inspections, and the review of monthly applications for payment.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement