Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Densified Activated Sludge Demonstration, District Project 100104

Closed
20260916060State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Central Contra Costa Sanitary District is seeking pre-qualified general contractors for District Project 100104, the Densified Activated Sludge (DAS) Demonstration. Located in Martinez, California, the project involves installing a full-scale DAS process in Aeration Basin Tank 2, integrated with an existing MABR demonstration. The scope includes the procurement, construction, commissioning, and startup of a hydrocyclone-based physical selection system, a compressed air channel mixing system, RAS piping modifications, and temporary bypass pumping and power infrastructure. The contractor is also responsible for providing 24-hour pump watch staffing for six months and decommissioning specific components upon completion. This initiative is driven by the Third Bay Area Nutrient Watershed Permit, aiming for a 40-percent reduction in seasonal average total inorganic nitrogen by October 2034 by improving sludge settleability and increasing treatment capacity. The estimated construction cost for the project is 10 million dollars. To be eligible for the final bidders list, applicants must hold a valid California Class A General Engineering Contractor's License and pass a strict pre-qualification evaluation. Mandatory requirements include compliance with indemnification, insurance, and bonding standards, as well as adherence to the Build America, Buy America Act due to the use of federal grants. Performance and payment bonds of at least 100 percent of the bid amount will be required. Pre-qualification submissions must be uploaded to PlanetBids by 4:00 p.m. PST on October 5, 2026.

General Info

Prequalification for $10M DAS demonstration project in Martinez, CA, due October 5, 2026.

Documents

1

Project 100104: Densified Activated Sludge Demonstration - Request for Statements of Pre-Qualifications

PDF, High priority: read this firstpresolicitation
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Central Contra Costa Sanitary District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The work generally consists of installing a full-scale demonstration of the Densified Activated Sludge (DAS) process in Aeration Basin Tank 2, integrated with an existing MABR demonstration. This includes a hydrocyclone-based physical selection system, compressed air channel mixing system, RAS piping modifications, and temporary bypass pumping and piping, along with temporary power infrastructure. The hydrocyclone and compressed air channel mixing equipment will be provided by Central San. The project aims to improve sludge settleability to increase treatment capacity without major new civil infrastructure, driven by the Third Bay Area Nutrient Watershed Permit requiring a 40-percent reduction in seasonal average total inorganic nitrogen by October 2034. The contractor will be responsible for procurement, construction, commissioning, startup, pump watch (24 hours/day for 6 months), and decommissioning identified components upon completion.

More opportunities from California → Central Contra Costa Sanitary District

Same awarding agency

NAICS: 237110
New
SLED
Densified Activated Sludge Demonstration
Solicitation # 100104
The Central Contra Costa Sanitary District is soliciting sealed bids for the Densified Activated Sludge Demonstration project located at 5019 Imhoff Place, Martinez, California. This lump-sum contract involves the installation and operation of wastewater equipment, including the delivery of a continuous 24/7 pumping system monitoring service for an initial three-month period. The scope of work encompasses exterior improvements, process interconnections, and the handling of process gas and liquids, with requirements for the contractor to provide a construction schedule, record project drawings, and asset reference manuals. The award will be granted to the lowest bidder based on the Base Bid Schedule A, with additive items in Schedule B considered at the District's discretion. Key operational requirements include strict adherence to packaging and marking standards, such as the use of stainless steel equipment tags and UL certification for control panels. The contractor must commence site work within ten calendar days of the Notice to Proceed and provide written notice two working days prior to starting. Compliance with California Labor Code Section 1771.4 for prevailing wages is mandatory, and the successful bidder must provide performance and payment bonds, as well as required insurance certificates within ten days of the award. Inspection and acceptance will occur at both the factory and the job site, with the District's Engineer providing final approval. Bids must be submitted in a sealed envelope to the Secretary of the District by the specified deadline.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS