This Solicitation opportunity from Government of Canada was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Design and Contract Administration Services for Roof Replacement at FCCC Seniors Centre
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Brampton is seeking qualified multi-disciplinary engineering firms to provide design and contract administration services for the replacement of the roof at the Flower City Community Campus Seniors Centre located at 8870 McLaughlin Road South. The project goes beyond basic replacement, aiming to transition the aging facility into a high-performance, future-ready asset that supports the city’s climate goals and ensures uninterrupted operation. Given the building’s use by a vulnerable senior population, maintaining continuous climate control and indoor air quality throughout construction is non-negotiable, requiring careful planning and execution to safeguard occupant health and comfort. The consultant will be expected to deliver a solution that enhances energy efficiency, resilience, and long-term sustainability while minimizing disruptions. The solicitation, numbered BT-RFP2026-209, was posted on July 10, 2026, with responses due by June 25, 2026, despite the apparent inconsistency in dates. It falls under NAICS code 541330 for architectural, engineering, and related services, and is issued by the City of Brampton under the broader umbrella of the Government of Canada. The point of contact for inquiries is Soni Edem, the Contracting Authority, reachable via email and phone provided in the posting. All proposals must be submitted through the Canada Buys portal as indicated by the provided URL. The consultant is expected to bring expertise in building science, climate adaptation, and project management to deliver a roof system that meets stringent operational and environmental standards.
General Info
Agency
NAICS
Place of Performance
CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
