This Solicitation opportunity from North Carolina was posted on July 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Design and Engineering Services for The Farm Park Phase 1B Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of Rolesville is seeking qualified architectural and engineering firms to provide comprehensive design and engineering services for Phase 1B of The Farm Park project located at 11624 Louisburg Road in Wake Forest, North Carolina. The scope of work includes designing a facility that accommodates various amenities, along with the development of utility networks such as electrical, water, drainage, and driveway systems. The project also requires detailed grading plans with elevation data, ensuring all areas are accessible in accordance with ADA standards. The selected firm will be responsible for producing signed and sealed architectural and engineering drawings and specifications covering all construction aspects, including lighting, electrical systems, plumbing, septic, and structural components. These documents must be based on engineering calculations to ensure proper sizing, and detailed enough to facilitate accurate cost estimation and permit acquisition. The contract value ranges from $500,000 to $1,500,000, with proposals due by July 25, 2025.
General Info
Place of Performance
NC, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
1. Design of a facility which provides space for the list of amenities listed on the first page
2. Design of utility (electric, water, drainage) and driveway networks
3. Grading plan with elevations.
4. All areas should be designed to provide ADA accessibility.
5. Generate signed and sealed Architectural and Engineering drawings and specifications for all aspects of the construction, including but not limited to, lighting and electrical system, plumbing, septic and structural systems. All systems specifications shall be based on engineering calculations to properly size the systems for the building involved. All drawings and specifications shall be in sufficient detail to obtain fixed construction costs and apply for permits.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
