Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design & Engineering Services for the Maintenance Support Facility Project

Closed
26-RFP-021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 8 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract pertains to design and engineering services for the Maintenance Support Facility Project managed by WCW, an independent special district in California that serves about 100,000 residents across several cities and unincorporated areas in western Contra Costa County. WCW operates an extensive wastewater collection and treatment system, including 252 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with a permitted capacity of 12.5 million gallons per day under the NPDES. This project aims to support maintenance infrastructure critical to sustaining these expansive wastewater services. Issued by the Infrastructure and Planning division of WCW, the solicitation was posted on March 27, 2026, with a response deadline of April 28, 2026. The contract opportunity is open without any set-aside designation and is managed through WCW’s office in Richmond, California. Primary contact for the solicitation is Engineer III Armondo Hodge, with support from Senior Management Analyst Victoria Donati. Interested parties can access further project details through WCW’s procurement portal.

General Info

Design and engineering services for WCW’s Maintenance Support Facility to sustain wastewater infrastructure.

Agency

California → Infrastructure and PlanningView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(27)

WCW_CAD_Standards:_C04_-_Plan_and_profile.dwg

DWG

Contra_Costa_County_Floodplain_Stamped_Plans.pdf

PDF

Design _ Engineering Services for the Maintenance Support Facility Project.pdf

PDF

Parking_Code_Regulations_Accessible.pdf

PDF

WCW_CAD_Standards:_Sewer_plan-example.bak

OCTET-STREAM

WQRRP_Base_Flood_Map.pdf

PDF

EBMUD_MUIR_Form_Guidelines_20240524.pdf

PDF

Elevation_and_Structure_Drawings.pdf

PDF

WCW_CAD_Standards:_WCW_Logo2020_CMYK_NoShadw_FullColor_Blk.jpg

JPG

NR.DsgnGdln_201402201123378371.pdf

PDF

Sample_-_Professional_Services_Agreement.docx

DOCX

CCDA_Guide_to_Accessible_Parking_Construction_Industry.pdf

PDF

Form_2_-_Reference_Form2.docx

DOCX

WCW_CAD_Standards:_C02_-_Notes_and_Legend.dwg

DWG

WCW_CAD_Standards:_C01_-_Cover_Sheet.dwg

DWG

Trailer_Ramp_Plans.pdf

PDF

WCW_CAD_Standards:_Sample_Plan_KSR.dwg

DWG

Form_1_-_Proposal_Cover_Form2.docx

DOCX

Signed_Seismic_Anchorage_Plans.pdf

PDF

N_Rich_Conditions_Updated_2023_202310301708502932.pdf

PDF

Form_3_-_Cost_Proposal_Form2.docx

DOCX

Form_4_-_Levine_Act_Statement.docx

DOCX

N._Richmond_Development_Stds_Updated_RLH_2023_202304260940363163.pdf

PDF

Signed_Seismic_Anchorage_Calculations.pdf

PDF

WCW_CAD_Standards:_C03_-_Pollution_Prevent_Pln.dwg

DWG

2024-03-18_--_WCW_CAD_Standards.pdf

PDF

Template_-_AE_Services_RFP.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Infrastructure and Planning
Contacts2 people available
OfficeRichmond, CA, 94806, USA
Organization / Agency
California → Infrastructure and Planning
View Agency Profile
Office AddressRichmond, CA, 94806, USA
Contacts
Armondo HodgeEngineer III
Victoria DonatiSenior Management Analyst

Interested Companies (7)

Show more
Schaaf & Wheeler
Santa Clara, California
Carollo Engineers
Costa Mesa, CA
Freyer & Laureta
San Francisco, California

See All 7 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
WCW provides wastewater collection and treatment services to approximately 100,000 residents. WCW is a political subdivision of the State of California and operates as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole, and some unincorporated areas within western Contra Costa County. WCW's system includes 252 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with a National Pollutant Discharge Elimination System (NPDES) permitted capacity of 12.5 million gallons per day.