This Solicitation opportunity from Ohio was posted on June 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Design Build - Electric Vehicle Charging Station (EVCS) and Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Southwest Ohio Regional Transit Authority (SORTA) is issuing a request for proposals to engage qualified vendors in designing and constructing a six-station Electric Vehicle Charging Station (EVCS) at the Queensgate Garage in Cincinnati, Ohio. The project aims to enhance the region’s electric vehicle infrastructure, supporting sustainable transit initiatives. The solicitation, titled "Design Build - Electric Vehicle Charging Station (EVCS) and Equipment," was posted on June 11, 2025, with a deadline for responses set for July 16, 2025. The contract is estimated to be valued between $500,000 and $1,500,000, reflecting the scope and scale of the project. The primary point of contact for this solicitation is Angela Meade, reachable via email or phone, and additional project details can be accessed through the provided procurement portal link. The project emphasizes a comprehensive design-build approach, requiring vendors to deliver both the engineering design and construction services necessary for the installation of the EVCS stations and associated equipment. While the contract is specific to Ohio, the overarching procurement process incorporates standard contractual terms, including compliance with applicable laws, nondiscrimination policies, and ethical standards as outlined in general terms and conditions applicable to goods and services procurement. These provisions ensure that vendors adhere to federal and state legal requirements, including anti-discrimination, immigration reform, and contract administration protocols. The contract aims to facilitate a seamless integration of the EV infrastructure into the existing transit facility, supporting SORTA’s broader goals of promoting clean transportation and modernizing transit services in the region.
General Info
Place of Performance
OH, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Concept and Detailed Design ServicesOpen now, due in 199 days
- Architectural Design & EngineeringOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
