Design-Build of the Energy Systems Integration Facility Electrical Expansion Program, National Renewable Energy Laboratory

Closed
RFS-4-42434Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price construction effort focused on the comprehensive interior modernization of training facilities. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution systems, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to improve HVAC efficiency. The project also requires the installation of new signage and the correction of plumbing deficiencies. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price reasonableness alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict regulatory standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. Proposals must be submitted electronically in PDF and Excel formats to the contracting officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the comprehensive repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is divided into two primary exhibit line items: the renovation of Building 575 and the removal and replacement of paving. The renovation includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work encompasses electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements including drainage, water, sanitary, and storm system repairs, as well as hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars. The contract is governed by several federal regulations, including the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Key administrative requirements include the use of Wide Area Work Flow for monthly invoicing and the submission of a final release and sea transportation certification per DFARS 252.247.7023. Quality assurance is managed through a QC Manager who must certify that all work complies with contract drawings and specifications. Depending on the final proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. Technical standards for the project include MIL-STD-101 for piping identification and IESNA LM-79 and LM-80 for LED lighting testing.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 23, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must provide proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must demonstrate the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to include proof of these specific efforts within the bid package will result in the proposal being deemed non-responsive. Documentation of general DBE outreach, such as emails and call logs, may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Bids are requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. This is an SBA set-aside opportunity open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on Best Value, evaluated on a 100-point scale covering price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of conformity with local wage rate decisions. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must provide a one-year guarantee of workmanship and applicable manufacturer warranties.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition requirements include the removal of 18 existing magazines and buildings 524 and 393. Technical requirements encompass a wide range of trades, including structural steel, concrete with rigid inclusions and load transfer mats, roofing, electrical utilities, and specialized systems like intrusion detection and lightning protection. The project also requires the installation of overhead cranes, primary and secondary electrical distribution, and various paving and landscaping improvements. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. Interested parties must contact the primary point of contact by the response deadline of October 31, 2026, to receive bid invitations and documents.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 7 days

General Info

Agency

N/A

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

National Renewable Energy Laboratory 15013 Denver West Parkway, GOLDEN, CO, 80241, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Jesse CastanonSr. Subcontract Administrator

Full Description

Show more
PREQUALIFICATION PROCESS The Energy Systems Integration Facility (ESIF) at the National Renewable Energy Laboratory (NREL) is soliciting qualifications from firms to provide Electrical Expansion services. NREL will down select approximately three firms from this RFQ who fall within the competitive range to receive the Request for Proposal (RFP). RFQ requirements are noted later in this document. The release of the RFP is anticipated in November/December 2014. PROJECT NOTICE The National Renewable Energy Laboratory (Alliance/NREL) intends to solicit competitive proposals from prequalified sources for a firm-fixed price design-build subcontract for an electrical program to expand the electrical service to ESIF and to expand the electrical research systems within the facility. The proposed work is located at the NREL South Table Mountain (STM) campus in Golden, Colorado. The Alliance for Sustainable Energy, LLC (Alliance) has entered into Contract No. DE-AC36-08-GO28308 with the Department of Energy (DOE), an agency of the U.S. Government, for the management and operation of the National Renewable Energy Laboratory (NREL). NREL is the only federal laboratory dedicated to the research, development, commercialization and deployment of renewable energy and energy efficiency technologies. It is intended that one task ordering agreement will be awarded for a basic year with four option years. The magnitude of the electrical expansion program, consisting of several projects over the 5 year period, is currently estimated to be between $30,000,000 and $35,000,000. GENERAL DESCRIPTION OF WORK The Energy Systems Integration Facility is designed to conduct large, megawatt-scale research and development on testing, controlling, and integrating renewable energy technologies into the nation's electrical distribution grid. It is a state-of-the-art, technically complex facility comprised of 15 laboratories, a sophisticated electrical research distribution bus, a SCADA and PLC networked control system, a high performance super-computer and data center, and a 200 person office wing. Research capabilities at the 182,500 sf ESIF provide a holistic view of the electric power system through hardware-in-the-loop testing at the low- to megawatt-scale power giving NREL, and its partners, the opportunity to evaluate how technologies will work together in a real world environment. At the core of this capability is the Research Electrical Distribution Bus (REDB). The REDB is an integrated research electrical infrastructure that is currently made up of two AC (3 phase, 480V) and two DC (+/- 500V) ring buses. In addition there are several existing pieces of fixed equipment such as large grid simulators, PV array simulators, load banks, AC and DC power supplies that are connected to the REDB to facilitate testing. The REDB allows connecting multiple energy sources/sinks and interconnections between key ESIF labs. The ESIF is designed to accommodate up to four AC and four DC buses which are sized at 250, 1600 or 2500 amps although only two AC (250A and 1600A) and two DC (250A and 1600A) buses are currently installed. Each REDB is controlled by a Supervisory Control and Data Acquisition (SCADA) system based on Wonderware that monitors and controls the REDB directly and facility-based processes via a Programmable Logic Controller (PLC) network. The SCADA also gathers and disseminates real-time data via devices embedded in the REDB switchgear. The electrical expansion program consists of two complimentary components: expansion of electrical power fed to the laboratory and expansion of the research electrical systems within the laboratory. The laboratory power expansion program includes the addition of at least one medium voltage switch, two 2.5 MVA transformers, and two main switchboards in the facility. The program includes distribution of power from the switchboards to various feeder panels and research equipment throughout the facility and potentially to adjacent outdoor test areas. Due to the experimental nature of the work at NREL these service components will require extensive metering and interface with data acquisition systems. This work may be subdivided into two or more projects over several years or may be executed as a single project. The research electrical power expansion program involves the work needed to expand the Research Electrical Distribution Bus (REDB) and the installation of testing equipment. Items such as new lateral buses on existing REDB switchboards, up to four new REDB switchboards and associated lateral buses, experiment connection devices (fixed equipment switchboards, data acquisition interfaces, etc.), AC and DC power supplies, and additional grid simulation equipment are included under this scope of work. The individual task work scope will clearly delineate the scope of the work needed to accomplish a particular research electrical power expansion project. The near term priorities for expansion of research electrical power are: - A second 250A AC and DC REDB, providing additional capacity for users to conduct integrated system experiments at the <500 kW-scale; - Construction of additional sections for the existing 250A and 1600A AC and DC REDB, extending access to the REDB into additional ESIF labs; - A new 2500A AC and DC bus, providing new capability for ESIF to host integrated systems experiments as large as 2 MW; and - Acquisition and connection of necessary fixed equipment (grid simulator, load bank, DC power supplies, etc.) in ESIF labs to enable additional and higher-power testing on these new laterals and busses. This work will be subdivided into several projects over several years. In support of the Department of Energy's goal to demonstrate sustainable and energy efficient buildings with a lower impact on the environment, NREL has mandated that all changes to existing facility be in keeping with sustainable and energy efficient practices consistent with the original design of the facility. NREL adheres to NFPA 70E and requires their subcontractors to do so as well. ACQUISITION PROCESS NREL has selected a two-phase best value selection process. The first phase has been identified as the qualification phase. Interested firms/teams are requested to submit Qualifications Statements. Qualifications Statements must meet the minimum qualifications identified in the Submission Requirements of this notice in order to be considered within the competitive range. An NREL source selection team will review submitted Qualification Statements and determine which meet the minimum requirements, and of those Qualification Statements that meet the minimum requirements, establish a competitive range of firms/teams evaluated to be most technically qualified to perform the project successfully. NREL will issue a Request for Proposal (RFP) only to those firms/teams that are in the competitive range for the project. The RFP will solicit a comprehensive proposal inclusive of a schedule/price/technical proposal and other pertinent information from the firms/teams within the competitive range. Possible site visits may be required as part of the Request for Proposal. A single firm/team will be selected for award based on a best value evaluation of proposals received in response to the RFP. SUBMISSION REQUIREMENTS Qualification Statements are to be submitted to the NREL Point of Contact as identified below. 1.1. Formatting 1.1.1. Submit five (5) copies of the Qualifications Statement. 1.1.2. Materials larger than 8-1/2 x 11 inches will not be accepted. 1.1.3. Responses shall not exceed 30 pages (including attachments). 1.1.4. A page is defined as one side of an 8-1/2 x 11 inch sheet of paper. 1.1.5. Copies may be either single or double sided 1.1.6. Maintain at least 1-inch margins on all sides 1.1.7. A 12-point font should be used. 1.1.8. Submissions shall employ minimal binding techniques to reduce resource use as well as shipping costs. 1.1.9. Faxed or email submissions will not be accepted. 1.2. Cover letter 1.2.1. Provide a cover letter (not included in the 30 page limit) identifying the principal contact person for the Offeror providing the name, title, street address, email, telephone, and fax numbers. The acknowledgement of receipt of all amendments and/or addendums shall be made on the cover letter. 1.2.2. If the Offeror is an out-of-state corporation, evidence of authority to conduct business in the state where the work is to be performed must be attached to the Qualification Statement (not included in 30 page limit). 1.3. Executive Summary 1.3.1. Provide a summary identifying the highlights of the submitted materials. 1.4. Qualifications - The Qualification Statement submittals are identified below. Qualifications shall include the following submissions, organized by tabbed sections detailing the following: 1.4.1 Tab A- Minimum Requirements (go/no go) 1.4.1.1 Submission Requirements: 1.4.1.1.1 Bonding Capacity: The offeror shall submit a letter from their surety indicating their individual project capacity as well as their total bonding capacity, with sufficient capacity to accommodate the proposed project. The bonding letter must be from a Treasury listed surety. 1.4.1.1.2 Insurability: The offeror shall submit a letter from their insurer indicating their ability to meet, as a minimum the NREL insurance requirements as indicated in Appendix B-10, "Standard Terms and Conditions for Firm Fixed-Price Subcontracts for Design/Build" available at http://www.nrel.gov/business_opportunities/related_docs.html 1.4.1.1.3 Safety: Experience Modification Rate (EMR) of 0.99 or below. 1.4.1.1.3.1 Provide a letter from insurance carrier showing the EMR for last 3 years. Include EMR data for all key subcontractors as well. 1.4.1.1.3.2 Provide OSHA 300 logs for last 3 years (not included in 30 page limit). 1.4.1.2 Evaluation Metric: Submissions that do not contain the minimum requirements as outlined above will not qualify to be short listed and will not receive further consideration. 1.4.2 Tab B- Project Team (50 points) Provide a description of the project team and identify the qualifications of the project team members in key positions. NREL values design, construction, and technical ability as key skills to assure project success. A demonstrated ability to design and construct complex electrical systems compatible with the existing facility infrastructure is critical to project success. The technical ability of the team to understand the existing electrical infrastructure is critical to the NREL since the subcontractor will play a major role in assisting with the design of potential experimental configurations. 1.4.2.1 Submission Requirements: 1.4.2.1.1 Project Team: Provide a one page organizational chart of key personnel dedicated to this project including: the proposed project manager, the general superintendent or equivalent, and on-site technical assist resource(s). Identify the firm of each individual on the organizational chart. All major member firms of the design/build team shall be shown. 1.4.2.1.2 Key Personnel: Provide a one page resume of key personnel (not included in the 30 page limit) assigned to the design-build team with descriptions of their specific role and responsibility. 1.4.2.1.3 Narrative: Provide a narrative outlining the intended effectiveness of the proposed team. Highlight specific project examples of how your design-build team has worked successfully as a part of an integrated team to resolve complex issues associated with electrical systems, SCADA and PLC networks. If more than one A/E team member is proposed, outline the role and scope of each A/E. 1.4.2.2 Evaluation Metric: 1.4.2.2.1 Evaluation on the ability of the proposed team and team members to provide the targeted range of design, construction, and technical skills to support the proposed projects. 1.4.2.2.2 Scoring will be earned based on the extent to which the design-build team members have demonstrated successful integration on other, similar, recently completed projects with preference given to experience with complex electrical systems, SCADA and PLC networks. Experience working with NFPA 70E is a plus. 1.4.2.2.3 References may be contacted to confirm an individual's role in a specific project. 1.4.3 Tab C- Project Team Experience: (50 points) Provide a description of the design-build team's relevant experience and references from no more than five (5) similar projects that your team has recently completed. Identify the design-build team members (cross reference with Tab B) that contributed to each project and what role they filled on each project. Provide a minimum of 3 references from within the last 5 years from previous clients demonstrating the ability to work with complex electrical systems. Further, demonstrate how safety and quality were better than industry standards on those projects. 1.4.3.1 Submission Requirements: 1.4.3.1.1 Attributes: Provide metrics for each project including size, schedule, budget, and delivery method. Describe the project attributes and how those attributes compare to this work. 1.4.3.1.2 Performance: Describe the project expectations and how project success was measured. Submit performance history in meeting budget and deadlines, producing high quality work, and meeting safety goals. 1.4.3.1.3 Reference: Provide the name and contact information (e-mail and phone number) of the principle Owners who are knowledgeable of the outcome of each project. References may be contacted to verify the project information submitted. 1.4.3.1.4 Page Limit: one (1) page per project. 1.4.3.2 Evaluation Metric: 1.4.3.2.1 Evaluation for proven ability to successfully complete a work of the size and type outlined with preference given to those with complex electrical system, SCADA and PLC network experience. 1.4.3.2.2 References may be contacted regarding performance of key personnel.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS