Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 17, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design/Build Repair Roof B1025

Awarded
F2K2AC4029A001-1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
GSW-27-40-01 GSW Student Success Center Flat Roof Project
Solicitation # GSW-27-40-01
Georgia Southwestern State University is soliciting sealed bids for the GSW Student Success Center Flat Roof Project (GSW-27-40-01) located at 240 Edgewood Avenue, Americus, Georgia. The scope of work involves a single prime contract for the installation of a Thermoplastic-Polyolefin (TPO) roofing system, including selective demolition, cast stone masonry, sheet metal flashing, and a lightning protection system compliant with UL 96A and LPI 175 standards. All roofing materials must meet FM Approvals 4450 or 4470 certifications and adhere to specific ASTM weathering and impact resistance standards. Bids must be submitted in a sealed envelope to Sierra Harvey, Director of Purchasing, by November 19, 2026, at 2:00 p.m. local time. Submissions must include a bid bond of at least 5 percent of the total bid; the successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract sum within 10 calendar days of award. While the contract is based on a lump sum price, the university may award the contract to a bidder other than the low bidder based on a review of bidder qualifications. The contractor is responsible for coordinating all work to maintain roofing warranties and must provide a Letter of Findings Certificate from Underwriters Laboratories or an LPI-IP certificate upon completion.
Georgia Southwestern State University

POSTED

about 22 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$413,652.2

NAICS

238160 - Roofing Contractors

Place of Performance

Building 1025, KIRTLAND AFB, NM, 87117, USA

Set-Aside

NONE

Award Issued Date

Documents

28

AF Form 3052 - Contractor Proposal Form Base Bid (Repair Roof B1025)

XLSX, High priority: read this first3 pages · bid-schedule
High

AF Form 3052 - Contractor Proposal Form (Repair Roof B1025 - Skylight Additive)

XLSX, High priority: read this first3 pages · bid-schedule
High

AF Form 3064 - Contract Progress Schedule

XLS, High priority: read this first4 pages · specifications
High

AF Form 66 - Schedule of Material Submittals

XLS, High priority: read this first2 pages · specifications
High

Air Force Sustainable Design and Development (SDD) Implementing Guidance

PDF, High priority: read this firstspecifications
High

Amendment 0004 to Solicitation FA9401-14-R-0001

PDF, High priority: read this firstamendment
High

Amendment 003 to Solicitation FAS401-14-R-0301

PDF, High priority: read this firstamendment
High

Amendment 1 - Design/Build Repair Roof B1025, Kirtland AFB

PDF, High priority: read this firstamendment
High

Amendment C02 to Solicitation FA40-14-FR-001

PDF, High priority: read this firstamendment
High

Attachment 6 - Waste Summary - Spec Section 01 74 19 Appendix A

XLS, High priority: read this first1 page · specifications
High

Bldg. 1025 Roof Loading Analysis - Quiroga-Pfeiffer Structural Report

PDF, High priority: read this firstspecifications
High

FA9401-14-R-0001 Design/Build Repair Roof B1025, Kirtland AFB

PDF, High priority: read this firstrfp
High

Kirtland AFB General Design Guidelines - 95% Submittal

PDF, High priority: read this firstspecifications
High

Kirtland AFB Waste Diversion Direction and Report Form

PDF, High priority: read this firstspecifications
High

Kirtland Air Force Base Architectural Compatibility Plan (ACP)

PDF, High priority: read this firstspecifications
High

Section 01 74 19 - Construction and Demolition Waste Management

PDF, High priority: read this firstspecifications
High

SOW - Design-Build Repair Roof B1025

PDF, High priority: read this firstsow
High

Wage Determination NM140013 - New Mexico Heavy Construction

PDF, High priority: read this firstwage-determination
High

Wage Determination NM140040 - Bernalillo County, New Mexico

PDF, High priority: read this firstwage-determination
High

AF Form 3000 - Material Approval Submittal

PDF, Low priorityspecifications
Low

AF Form 3065 – Contract Progress Report

PDF, Low priorityprogress-report
Low

Attachment 10 - Past Performance Information Form (FA9401-14-R-0001)

DOCX, Low priority1 page · past-performance
Low

Building 1025 map and as-built drawings

PDF, Low priorityother
Low

DD Form 1354 - Transfer and Acceptance of DoD Real Property

PDF, Low prioritycontract-document
Low

DoD Implementation of Storm Water Requirements under EISA Section 438

PDF, Low prioritypolicy-memo
Low

Kirtland AFB Map

PDF, Low priorityspecifications
Low

Site Visit Sign-in Sheet - Solicitation F2K2AC4029A001

PDF, Low prioritysite-visit-log
Low

Solicitation F2K2AC4029A0001-1 - Design/Build Repair Roof B1025 Q&A

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Mar 11, 2014 to Mar 19, 2014. The notice description changed. The point of contact changed.

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9401 377 Msg Pk
Contacts2 people available
OfficeKIRTLAND AFB, NM, 87117-0001, USA
Office AddressKIRTLAND AFB, NM, 87117-0001, USA
Contacts
Nicholas C. VincentContract Specialist
Gilbert L. MartinezContracting Officer

More opportunities from Department Of Defense → FA9401 377 Msg Pk

Same awarding agency

NAICS: 541511
Federal
Requesting information for MISHAP ANALYSIS & ANIMATION FACILITY (MAAF) FLIGHT RECORDER DOWNLOAD SOLUTIONS ACQUISITION AND SUSTAINMENT
Solicitation # FA940126Mishap
The Department of the Air Force, specifically the Mishap Analysis and Animation Facility (MAAF), is seeking sources for engineering, acquisition, and sustainment services to develop and maintain hardware and software solutions for aircraft flight recorder download and data decompression. The scope includes creating download capabilities for both undamaged flight recorders and bench-level extracted Circuit Card Assemblies across various solid-state architectures. These solutions must run natively on Red Hat Enterprise Linux or Microsoft Windows and ensure raw data extractions map to OEM-native binary formats for bit-exact transcriptions. The contractor will be responsible for designing and testing standardized interfaces, including chassis, cabling, and drivers, while supporting a wide range of OEMs such as General Electric, Honeywell, and Curtiss-Wright. The contract structure consists of a 12-month base period with four 12-month option periods, with performance occurring at contractor facilities and Kirtland AFB, New Mexico. Key performance standards include maintaining 99 percent operational availability for download stations and providing hardware repairs or driver updates within three business days of notification. Security requirements mandate that all systems operate as stand-alone, air-gapped units with data transferred via physical USB media, and personnel must be cleared to process Controlled Unclassified Information. Under DFARS 252.227-7013/7014, the Government retains unlimited data rights to all software, source code, and technical documentation developed at Government expense. The contractor is also required to independently negotiate Non-Disclosure Agreements with OEMs to obtain proprietary technical data.
Custom Computer Programming Services

POSTED

22 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS