Design-Build Services For Seaton Elementary School Modernization

Closed
DCAM-25-CS-RFP-0002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes the construction of a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract involves comprehensive design and construction services for the modernization of Seaton Elementary School, a circa 1969 facility located in the Shaw Historic District. The project encompasses both renovation of existing structures and new construction to expand the school's footprint in accordance with the District of Columbia Public Schools' educational specifications. Key elements include demolishing a portion of the current building, primarily the hexagonal classroom wing, while proposing a design that maximizes project benefits. The scope also covers the development of new outdoor playgrounds, parking, and loading facilities, with the school’s southern field to be upgraded to turf and enclosed with fencing. Given its location within the central area designated by the National Capital Planning Commission, the project requires approval authority over the design. The project must adhere to all relevant local and national codes, including the DC Energy Conservation Code, Green Construction Code, and the Green Building Act, along with recent amendments such as the Greener Government Building Act of 2022. Additionally, the design must meet LEED certification standards, Net Zero Energy and Energy Consumption goals, Solar-Readiness, and Stormwater Management requirements. The contract, issued by the DC Department of General Services, is valued between 30 and 60 million dollars, with a response deadline of January 23, 2025. The project aims to deliver a sustainable, energy-efficient, and compliant educational facility that aligns with modern standards and community needs.

Documents

33

29 CFR Parts 5.5 - Labor Standards Provisions

PDF, High priority: read this firstwage-determination
High

ADA Compliance QA-QC Manual v2 for DGS-DCPS Modernization Projects

PDF, High priority: read this first320 pages · sow
High

Attachment A1 - Milestone Requirements

PDF, High priority: read this firstspecifications
High

Attachment B4 - Roof Condition Assessment Report for Seaton Elementary School

PDF, High priority: read this first33 pages · condition-assessment-report
High

Attachment D - Bidder Offeror Certification Form

PDF, High priority: read this firstsupporting-documents
High

Attachment G - Bid Bond Form

PDF, High priority: read this firstbid-bond-form
High

Attachment L - Past Performance Evaluation Form

PDF, High priority: read this first2 pages · past-performance
High

Attachment O - Bid Guarantee Certification

PDF, High priority: read this firstbid-security-certification
High

Davis-Bacon Act Wage Determination - District of Columbia Building Construction

PDF, High priority: read this firstwage-determination
High

DCAM-25-CS-RFP-0002 Seaton ES Modernization

PDF, High priority: read this firstrfp
High

DCPS Elementary School Prototype Program Educational Specifications

PDF, High priority: read this firstspecifications
High

DCPS Modernizations: Waste and Recycling Design Guidelines

PDF, High priority: read this firstspecifications
High

DGS Project Turnover Protocol Manual 2024

PDF, High priority: read this first27 pages · sow
High

DGS Standard Contract Provisions - Architectural & Engineering Services

PDF, High priority: read this firstcontract-document
High

DGS Standard Contract Provisions (Construction)

PDF, High priority: read this firstcontract-document
High

DGS Supplemental Design Guidelines (Version 2023.12.21)

PDF, High priority: read this firstspecifications
High

First Source Employment Agreement - Seaton Elementary School Modernization

PDF, High priority: read this firstcontract-document
High

Living Wage Act of 2006 Fact Sheet

PDF, High priority: read this firstwage-determination
High

Notice to Proceed and Letter Contract - Seaton Elementary School Modernization

PDF, High priority: read this firstaward
High

SBE Subcontracting Plan FAQs & Checklist

PDF, High priority: read this firstsupporting-documents
High

Seaton Elementary School Asbestos Management Plan and Inspection Report

PDF, High priority: read this firstspecifications
High

Seaton Elementary School Educational Specifications

PDF, High priority: read this firstspecifications
High

Seaton Elementary School Facility Condition Assessment

PDF, High priority: read this firstspecifications
High

Seaton Elementary School Modernization Design-Build Agreement

PDF, High priority: read this firstcontract-document
High

Seaton ES Modernization - Proposal Form (DCAM-25-CS-RFP-0002)

PDF, High priority: read this firstproposal-form
High

Attachment E - Tax Certification Affidavit

PDF, Low priorityother
Low

Attachment P - Conflict of Interest Disclosure Statement

PDF, Low priority2 pages · other
Low

Attachment R - EEO Policy Statement

PDF, Low priorityother
Low

Certification to Furnish Performance & Payment Bond

PDF, Low prioritysupporting-document
Low

Contractor Self-Certification (V4_09.12.2024)

PDF, Low priorityother
Low

National BIM Guide for Owners

PDF, Low priorityspecifications
Low

Payment and Performance Bond Forms - District of Columbia

PDF, Low priorityother
Low

Attachment_Q-Release_of_Lien_Forms.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → DC Department of General Services
Contacts1 person available
OfficeN/A

Full Description

Show more
The Project includes full design and construction services for Seaton ES, an approximately 91,000 square-foot school facility.   The Design-Builder shall design and construct a combination of renovation of the existing and new construction to increase the existing footprint to accommodate the square footage required in the educational specifications (“Ed Spec(s)” or “Educational Specifications”) to bring it in line with the District of Columbia Public Schools (“DCPS”) Ed Specs (collectively, the “Project”). Seaton ES was built in 1969 in the Shaw Historic District. The building has since had several construction projects, including a Phase 1 Modernization in 2011 and an elevator addition in 2018. The Department anticipates the demolition of a portion of the existing building, mainly the hexagonal classroom wing, but the Design-Builder shall recommend a design that is most advantageous to the Project. The Project shall include all the new outdoor playgrounds, parking, and loading facilities. The field south of the school is part of the school property and shall be upgraded to turf with all new fencing at the perimeter per fencing standards. The Project site is located in the defined central area for the Nation Capital Planning Commission and therefore will require to have approval authority over the Project design. The Project is required to meet all local and national codes including but not limited to DC Energy Conservation, the DC Green Construction Code, the Green Building Act, etc. The project will also be required to meet the recent amendment to the Green Building Act, the Greener Government Building Amendment of 2022 which went into effect on March 10, 2023. In addition to the required codes, the Project is required to meet the LEED Requirements, Net Zero Energy and Energy Consumption Requirements, Solar-Readiness Requirements, and Stormwater Management.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS