Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on August 16, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Consolidate B211 to B68

Closed
MXDP221019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 15 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 16 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

TX, 78843, USA

Set-Aside

SBA

Documents

15

AETC Installation Excellence Guide

PDF, High priority: read this firstspecifications
High

Building 68 Final Charrette Modifications

PDF, High priority: read this firstspecifications
High

EOS M290 Facilities Installation Guide

PDF, High priority: read this firstspecifications
High

Final Conceptual Charrette Report - Renovate Fabrication and Propulsion Facility, B68

PDF, High priority: read this firstsow
High

Instructions to Offerors - Design Consolidate B211 to B68 (MXDP 22-1019)

PDF, High priority: read this firstrfp
High

Laughlin AFB Architectural Compatibility Guidelines

PDF, High priority: read this firstspecifications
High

Laughlin AFB Division 01 General Specifications - MXDP 22-1019

PDF, High priority: read this firstspecifications
High

Laughlin AFB Environmental Quality Construction Specifications

PDF, High priority: read this firstspecifications
High

Laughlin AFB Installation Facilities Standards (IFS)

PDF, High priority: read this firstspecifications
High

Memmert TTC256 Environmental Test Chamber Product Specification

PDF, High priority: read this firstspecifications
High

MXDP 22-1019 Evaluation Factors - Design Consolidate B211 to B68

PDF, High priority: read this firstevaluation-factors
High

Standard Form 330 - Architect-Engineer Qualifications

PDF, High priority: read this firstpast-performance
High

Statement of Objectives: Consolidate B211 to B68 (MXDP 22-1019)

PDF, High priority: read this firstsow
High

Task Order FA3099-16-D-0002-0002 - Schedule of Submittals

PDF, High priority: read this firstspecifications
High

Past Performance Questions

PDF, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3099 47 Conf Cc
Contacts2 people available
OfficeLAUGHLIN AFB, TX, 78843-5101, USA
Office AddressLAUGHLIN AFB, TX, 78843-5101, USA

Full Description

Show more
ARCHITECT-ENGINEERING (A-E) SERVICES AT LAUGHLIN AFB, TX. "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs." The 47th Contracting Flight at Laughlin Air Force Base (AFB), Texas is seeking responsible sources to establish a Firm Fixed-Price Contract in which the awarding company will be responsible for a design to Consolidate B211 to B68 project. The purpose of this design is to complete a 100% design to renovate Building 68 at Laughlin Air Force Base (AFB), Texas. BACKGROUND: Renovation of Building 68 is requested by the user to accommodate consolidation of the Component Maintenance Division from Building 211 into Building 68. The renovation of Building 68 is also requested by the user to ensure all safeguards are in place to protect existing advanced manufacturing machinery installed in Building 68.The renovation of Building 68 is expected to require design of electrical systems, heating, ventilating, and air conditioning (HVAC), plumbing, fire protection engineering, addition/relocation of communication connections, and interior finishes. This is a competitive selection process in which competing offerors' qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed-Price contract. IAW FAR 36.603(b): To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer Qualifications," Part II and when applicable, SF 330, Part I. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this posting; all costs associated with responding will be solely at the interested parties' expense. Failure to respond to this post does not preclude participation in the subsequent technical evaluation so long as a firm's SF 330 is currently on file with the 47th Contracting Squadron. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement. This acquisition will be solicited as a 100% Small business Set-Aside. The NAICS 541330 (Engineering Services) applies to this acquisition, with a small business size standard of $25.5M. The Disclosure of Magnitude for the subsequent construction project is between $5,000,000 and $10,000,000 IAW FAR 36.204(g). The work to be performed shall include but is not limited to: 1. Attending a pre-investigation meeting 2. Investigating site conditions, options, etc. 3. Collecting and reviewing project data and records 4. Developing design concepts and cost estimates 5. Submitting an investigation report 6. Attending review meetings 7. Making the revisions requested by the Government 8. Submitting intermediate design documents 9. Producing a complete design (35%, 65%, 95%, and 100% submissions) A-E EXPERIENCE REQUIREMENTS: A-E's experience shall include that which is commensurate with the requirements specific to the scope of design. A. The A-E shall demonstrate that they have experienced personnel with Texas Registrations, and adequate capacity and depth in the following disciplines: 1. Architect 2. Structural Engineer 3. Mechanical Engineer 4. Plumbing Engineer (including water and gas) 5. Electrical Engineer 6. Fire Protection Engineer 7. Communications Engineer 8. Civil Engineer *For the Fire Protection Engineer (FPE) - "licensed professional" for purposes of this evaluation factor shall mean a registered professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES). The FPE shall also have a minimum of 5 years of experience, dedicated to fire protection engineering that can be verified with documentation. Proof of passing the examination and required experience shall be submitted with the proposal or it will be assumed the FPE does not meet these qualifications. B. In addition, the offeror's team shall include staff members in the following disciplines and shall demonstrate their qualification: 1. Project/Program Manager 2. Cost Estimator 3. Interior Designer The A/E shall furnish all materials, labor, tools, equipment, transportation, and all other incidentals necessary to complete the work outlined in this Statement of Objectives (SOO) and provide a complete 100%, issued for construction, design documents to compete the work outlined in Attachment B, Conceptual Charrette Report. All work on this project shall be accomplished in accordance with the codes and specifications identified in Attachment B, Conceptual Charrette Report and the following local specifications: Laughlin AFB Division 01 General Specifications, Environmental Quality Construction Specifications Laughlin Air Force Base, Laughlin Installation Facility Standards, Architectural Compatibility Guidelines Laughlin Air Force Base, and Installation Excellence Guide Air Education and Training Command. The A/E shall provide expertise in mechanical (HVAC), fire protection, structural, architecture, and electrical disciplines at a minimum. The A/E shall utilize a Qualified Fire Protection Engineer (QFPE) who meets the requirements of UFC 3-600-01 Fire Protection Engineering for Facilities. The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, study reports, design analyses, project drawings, technical provisions (specifications), equipment layouts, cost estimates, submittal registers, quality assurance plans, constructability review reports, construction bidding amendments, construction contract modifications, and other documents. QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than 30 Aug 2023. Primary POC email: javier.hinojosa.4@us.af.mil Alternate POC email: rebecca.pelayo_ruelas@us.af.mil The following documents are considered Attachments to this Synopsis/Solicitation: Attachment 1 - Instructions to Offerors Attachment 2 - Evaluation Criteria Attachment 3 - Statement of Work Attachment 4 - SF 330 Attachment 5 - Past Performance Questionnaire

More opportunities from Department Of Defense → FA3099 47 Conf Cc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS